HomeMy WebLinkAboutPE 2.11.07; BEUNA WOODS UNIT 1; Engineering Application10
Building Permit Plan Check No.
Application for Grading Permit
CITY OF CARLSBAD
ENGINEERING DEPARTMENT
1200 Elm Avenue
729-1181
PE NO. 9 07
Validation by Finance
Depprt
FOR APPLICANT TO FILL IN
Site Address
#10A(Rols Sr-11 c wjw Vol
Surety Bond Bond No.
Legal Description. Map No.
cr77 ! UNIT /I0. I
Surety Company
:
Subdivision Name 0 Surety Address P
uNA-kJ1OD '
Owner Phone Date Filed ',. Rec'd by
Owner's Address Cash deposit Rec'd by Date filed H 5ORPNTi' ,4U..E)" t&'I citi DIE6 c'j $
Plans by Civil Engineer R.C.E. The following documents are required and shall become a part
,494.,4*/D Lul 6t3'& //5 3'2_. of the grading permit when they are approved.
_ Grading plans Specifications Address Phone
4-31 MI ,4v, *LrPô X Soil report Retaining Walls
' Drainage Other structures _____
Soil Engineer R.C.E. Phone
jAjoeptv_D i.ve ç z2A—.-2_q I ) Compaction report Grading Contractor Phone
612rA4_c0/J~ii'uCr(01
Address SPECIAL CONDITIONS WHICH ARE MADE coPAEjuro (MLE TwiO,, ç,, 2.47.1 APART OF THIS PERMIT
Party responsible for overall supervision
P41i/llS' 514 IELDS, 14If2.. c:yd3Ms- 1; Authorized hours of operation:
7:00 AM to 5:00 PM, Monday Friday. Proposed use of grade site
Haul routes are to be approved by City Engineer. 'UDII/(ON $tT
Number of cubic yards
Adequate provisions shall be made for erosion and siltation Cut Fill Import Waste
control.
All slopes shall be planted per direction of Parks &
Recreation Director. Proposed Schedule of Start Finish
Operations (dates) —3E-0
All fills to be compacted to at least 90% of optimum
I hereby acknowledge that I have read the application and state that density unless noted otherwise.
the information I have provided is correct and agree to comply with Alh-ee +D be cniecL ckU be øwo"ke all City ordinances and State laws regulating excavating and grading,
' I j4Ia at , TU1U..V' g pSruR. D. and the provisions and conditions of any permit issued pursuant to
this application. INSPECTOR'S
'AZ
INSPECTION DATE
, 1". It SIGNATURE Signature of Permittee ___________________________________________
Ground preparation I4M Owner or authorized agent Rough grading
ENVIRONMENTAL CLEARANCE
- 4 h Date __1/Z
Compaction report rec'd.
____________________
EIA Log No. Planting & drainage
Final certification rec'd. / By
Grading permit fee $240 UA I
Permit
,(/ Date 4, 1?8'0 I
Permit Expiration Date MA)Ths PP.0/A AWE p,4-rE
Work completed
Surety bond released
Copies: White-Office; Green-Building;
Yellow-Inspector; Pink-Permittee; Goldenrod-Finance
THIS FORM WHEN PROPERLY VALIDATED IS A PERMIT TO DO THE WORK DESCRIBED
THIS PERMIT IS VALID FOR A SIX (6) MONTH, PERIOD