Loading...
HomeMy WebLinkAboutPE 2.11.07; BEUNA WOODS UNIT 1; Engineering Application10 Building Permit Plan Check No. Application for Grading Permit CITY OF CARLSBAD ENGINEERING DEPARTMENT 1200 Elm Avenue 729-1181 PE NO. 9 07 Validation by Finance Depprt FOR APPLICANT TO FILL IN Site Address #10A(Rols Sr-11 c wjw Vol Surety Bond Bond No. Legal Description. Map No. cr77 ! UNIT /I0. I Surety Company : Subdivision Name 0 Surety Address P uNA-kJ1OD ' Owner Phone Date Filed ',. Rec'd by Owner's Address Cash deposit Rec'd by Date filed H 5ORPNTi' ,4U..E)" t&'I citi DIE6 c'j $ Plans by Civil Engineer R.C.E. The following documents are required and shall become a part ,494.,4*/D Lul 6t3'& //5 3'2_. of the grading permit when they are approved. _ Grading plans Specifications Address Phone 4-31 MI ,4v, *LrPô X Soil report Retaining Walls ' Drainage Other structures _____ Soil Engineer R.C.E. Phone jAjoeptv_D i.ve ç z2A—.-2_q I ) Compaction report Grading Contractor Phone 612rA4_c0/J~ii'uCr(01 Address SPECIAL CONDITIONS WHICH ARE MADE coPAEjuro (MLE TwiO,, ç,, 2.47.1 APART OF THIS PERMIT Party responsible for overall supervision P41i/llS' 514 IELDS, 14If2.. c:yd3Ms- 1; Authorized hours of operation: 7:00 AM to 5:00 PM, Monday Friday. Proposed use of grade site Haul routes are to be approved by City Engineer. 'UDII/(ON $tT Number of cubic yards Adequate provisions shall be made for erosion and siltation Cut Fill Import Waste control. All slopes shall be planted per direction of Parks & Recreation Director. Proposed Schedule of Start Finish Operations (dates) —3E-0 All fills to be compacted to at least 90% of optimum I hereby acknowledge that I have read the application and state that density unless noted otherwise. the information I have provided is correct and agree to comply with Alh-ee +D be cniecL ckU be øwo"ke all City ordinances and State laws regulating excavating and grading, ' I j4Ia at , TU1U..V' g pSruR. D. and the provisions and conditions of any permit issued pursuant to this application. INSPECTOR'S 'AZ INSPECTION DATE , 1". It SIGNATURE Signature of Permittee ___________________________________________ Ground preparation I4M Owner or authorized agent Rough grading ENVIRONMENTAL CLEARANCE - 4 h Date __1/Z Compaction report rec'd. ____________________ EIA Log No. Planting & drainage Final certification rec'd. / By Grading permit fee $240 UA I Permit ,(/ Date 4, 1?8'0 I Permit Expiration Date MA)Ths PP.0/A AWE p,4-rE Work completed Surety bond released Copies: White-Office; Green-Building; Yellow-Inspector; Pink-Permittee; Goldenrod-Finance THIS FORM WHEN PROPERLY VALIDATED IS A PERMIT TO DO THE WORK DESCRIBED THIS PERMIT IS VALID FOR A SIX (6) MONTH, PERIOD