Loading...
HomeMy WebLinkAboutPE 2.11.15; LA COSTA LAND CO WATER RECLAMATION; Engineering ApplicationApplication for Grading Permit CITY OF CARLSBAD ENGINEERING DEPARTMENT 1200 Elm Avenue 729-1181 -. -'APE NO. 2I. 15 5/05 /807533 -159,00 BR flflfl 17r21 r - UU 'LH t Validation by Finance Department Building Permit Plan Check No. - FOR APPLICANT TO FILL IN Site Address E. of Rancho Santa Fe Road between Surety Bond Bond No. Questhaven Road & La Costa Avenue Legal Description Map No. Surety Company Sec. 29, T12S, R3W, S B M Subdivision Name Surety Address N/A Owner Phone Trustees of the Central States SE & SW Arcs Pns Date Filed Rec'd by )n Owner's Address Fund Cash deposit Rec'd by Date filed 8550 W. Bryn Mawr Avenue, ChiOago, Ill.. $ Plans by Civil Engineer R.C.E. The following documents are required and shall become a part Rick Engineering—Barry C. Bender 28448 of the grading permit when they are approved. Grading 11 Specifications plans Address Phone 3088 Plo Pico Carlsbad, CA 729-4987 /Soil report Retaining Walls Soil Engineer R.C.E. Phone EBERHRr—ATEI & ASSOCIATES 438-9416 - Drainage structures ______ Other Compaction report Grading Contractor Phone Not known at this time Address SPECIAL CONDITIONS WHICH ARE MADE A PART OF THIS PERMIT Party responsible for overall supervision, Authorized hours of operation: Robert Stork 7:00 AM to 5:00 PM, Monday - Friday. Proposed use of grade site Installation of 12" reclaimed water line Haul routes are to be approved by City Engineer. Number of cubic yards Adequate provisions shall be made for erosion and siltation control. Cut Fill Import Waste • 15,400 1 15,400 1 ' 4. All slopes shall be planted per direction of Parks & Recreation Director. Proposed Schedule of Start Finish Operations (dates) A=il is., 1980 flci-. 1 'F , 5. All fills to be compacted to at least 90% of optimum I hereby acknowledge that I have read the application and state that density unless noted otherwise. the information I have provided is correct and agree to comply with all City ordinances and State laws regulating excavating and grading, and the provisions and conditions of any permit issued pursuant to this application. INSPECTOR'S INSPECTION DATE SIGNATURE Ground preparation Signature of Pe r General County Water Owner or authi gent fli si-ri Ct • Rough grading - ENVIRONMENTAL CLEARANCE - Compaction report rec'd. Date EIA Log No'' Planting & drainage Final certification rec'd. 4Z UW, /40 600 By Grading permit fee $ Work completed PermitJst (/)3 Surety bond released / L.opes: wnite-ullice; ureen-uiIaing; Permit Expiration Date Yellow-Inspector; Pink-Permittee; Goldenrod-Finance THIS FORM WHEN PROPERLY VALIDATED IS A PERMIT TO DO THE WORK DESCRIBED THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD