Loading...
HomeMy WebLinkAboutPE 2.11.22; OAK INDUSTRIES PARKING LOT 15; Engineering ApplicationPERMIT NO.Z112.2_ (p cation for Grading Permit • • (letter code + number) CITY OF CARLSBAD Llot PUBLIC WORKS & BUILDING DEPARTMENT 7/29/BES7iJbdivigjonJ000 BP 1200 Elm Avenue TL 729-1181 FOR APPLICANT TO FILL IN Site Address 1 Surety Bond Bond No. Legal Description Map No. Surety Company Pøitmj Lor IS Ptu3.P. Urr 41 2os4. ubdivision Name iner U7E'tl.) Phone 432 -IZJ Fl C 7t-pM a (f0 (OWu) anerls Address lans by Civil Engineer R.C.E. iciy Woy / 8 &IZ3 idress - - Phone ,) '.-JjI., VT./ I • •-*J y p j I -•I1 ii Engineer R.C.E. Phone rading Contractor Phone Surety Address Date Filed Rec'd by Cash deposit Rec'd by Date filed The following documents are required and shall become a part of the grading permit when they are approved. _Grading plans Specifications _Soil report _Vicinity map _Drainage structures Retaining walls _Compaction report _Other ddress Check if supervised SPECIAL CONDITIONS WHICH ARE MADE I grading a- A PART OF THIS PERMIT party responsible for overall supervision Authorized hours of oDeration: 7:00 AM to osed use of cirade site umber of cubic yards Cut Fill Import Waste I I - otal acted fills (yes or no) Proposed Schedule of Start Finish Operations (dates) I hereby acknowledge that I have read the applica- tion and state that the information I have provide( is correct and agree to comply with all City ordinances and State laws regulating excavating an( grading, and the provisions and conditions of any permit issued pursuant to thi application. Signature of Permittee_________________________ Owner or authorized agent cyLhK.a. 5:00 PM, Monday-Friday. Haul routes are to be approved by City Engineer. Adequate provisions shall be made for erosion and siltation control. All sIoes shall be Dlanted Der direction of Parks & Recreation Director. INSPECTION DATE INSPECTOR'S SIGNATURE Ground preparation 1WJUJII :JIOUIIIY Compaction report rec'd. Planting & drainage Final certification rec'd. Grading permit fee $ Work completed Surety bond released Permit Validation by Date Permit Expiration Date___________________________ THIS FORM WHEN PROPERLY VALIDATED BY SIGNATURE IS A PERMIT TO DO THE WORK DESCRIBED THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD