Loading...
HomeMy WebLinkAboutPE 2.11.65; PARK VIEW ESTATES; Engineering ApplicationI-Jn P%rFL.1%1P%1M I 1%j FILL II'J Site Ad" s Surety Company Bond No. ,J...eal Description Map No. Surety Address &r 2 6 4e1?I24jPLr,)/_ division Name - Date Filed Rec'd by rEvr*r c ner Phone Cash deposit Rec'd by Date filed 7r $ Owner's Address The following documents are required and shall become a part C1S. L4y..i__ka2a9er.st Z..c)/ C1ht* 9' of the grading permit when they are approved. Grading plans Specifications _____ Soil report Geologic Report Drainage structures _____ Other Compaction report Plans by Civil Engin"er R.0 E UW Address Phone -,I,I E ci R.C.E. Soil Engine Phone Grading Contractor Phone SPECIAL CONDITIONS WHICH ARE MADE C A.) ddress Authorized hours of operation: 7:00 AM to Sunset, Monday- Friday. Party responsible for overall supervision , Haul routes are to be approved by City Engineer. d use o.iade site Propose es Adequate provisions shall be made for erosion and siltation control. Numberfof cubi'c yards Cut Fill Import Waste All slopes shall be planted per City Code. Proposed Schedule of Start Finish All fills to be compacted to at least 90% of optimum Operations (dates) I_J17 ..5—/ density unless noted otherwise. I hereby acknowledge that I have read the application and state that the information I have provided is correct and agree to comply with all City ordinances and State laws regulating excavating and grading, Under City Code Sec. 11.06 170 this grading is: and the provisions and conditions of any permit iss d pursuant to 0 REGULAR GRADING - City inspector will make inspections this application. listed below. 0 CONTROLLED GRADING - Private grading engineer shall Signature of rmittee observe work, coordinate tests, make reports. INSPECTION DATE INSP. SIGNATURE Owner or authorize agent Initial - site prep. ENVIRONMENTAL CLEARANCE - Date _____________________ Rough - prior to drains EIA Log No. Final - slopes planted By Compaction reports rec'd. Grading permit fee $ 70 o.i Plan check fee $ Private engr. cert. rec'd. Permit Issued1 ' by I " Date / / 0 Copies: White-Office; Green-Building; Permit Expiration Date / /' —P7 Yellow-Inspector; Pink-Permittee; Goldenrod-Finance THIS FORM WHEN PROPERLY VALIDATED IS PERMIT TO DO THE WORK DESCRIBED THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD