HomeMy WebLinkAboutPE 2.11.66; LA COSTA VALLEY UNIT 4 LOT 180; Engineering ApplicationPERMIT NO. 2-fl.
Apptication for Grading Permii (letter code + number)
CITY OF CARLSBAD Llot
PUBLIC WORKS & BUILDING DEPARTMENT S=subdivision
1200 Elm Avenue /30/511-y contqj00 MC' 729-1181 0dO13529 1/30/el 11600 TL
FOR APPI IflANT TO Fill IN
StSdCLessden L Surety Bond Bond No.
ega,4 DescrrrF ia Map No. 5781 Surety Company
Subdivision Name Surety Address
)wner Cecil Ha1J1U Phone 942-2cI-7- Date Filed Rec'd by
)wnr' Address 26,9 .irineoe Way Apt. 131 Car1bad, ca •
Cash deposit Rec'd by Date filed
$
Plans b y Ci'iljneer R.C.E. Ca1I.Lor*.La i..riig Corp. 24168 The following documents are required and shal
become a part of the grading permit when they
are approved.
Grading plans Specifications
Soil report Vicinity map
Drainage structures Retaining walls
Compaction report Other
Address 8.080%,,LaN #206 na 92O41 ° 461-2700
Soil En neer R.C.E. 21719 P.t1 ee8o8 John 4raoi & Assoc.
G ding Co ractor Phone 72759 I 8031
'~941ycafjjt Ave.. Check if supervised
as grading
SPECIAL CONDITIONS WHICHARE MADE
A PART OF THIS PERMIT
_________ overall supervision
I. Authorized hours of operation: 7:00 AM to
5:00 PM, Monday-Friday.
Haul routes are to be approved by City
Number of cubic yards
Cut Fill Import Waste
Engineer.
Adequate provisions shall be made for
erosion and siltation control.
4.AII slopes shall be planted per direction I.'C-rI 22.o7c!_2fift zlatI
of Parks & Recreation Director.
______________________________
Total - '22eo LL..
Compacted fi I Is (yes or no) -rLs
Proposed Schedule of 0Stjt 1980 o fliF*shbi. l98 Operations (dates)
I hereby acknowledge that I have read the applica-
tion and state that the information I have provided
is correct and agree to comply with all City
ordinances and State laws regulating excavating and
grading, and the provisions and conditions of any
permit issued pursuant to this application.
Signature of Permittee
Owner or authorized agent________________________
- INSPECTION DATE INSPECTOR'S
SIGNATURE
Ground preparation
Rough grading
Compaction report rec'd.
Planting & drainage
Final certification rec'd.
Grading permit fee $ Work completed
Surety bond released
A') ç ) Perm 9iati(( A
())
by j/JL1VV\J/-&_--eke 50 '1
Permit Eraion Date__________________________
THIS FORM WHEN PROPERLY VALIDATED BY SIGNATURE IS A PERMIT TO DO THE WORK DESCRIBED
THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD