Loading...
HomeMy WebLinkAboutPE 2.11.70; CARLSBAD COMMERCIAL CENTER PARCEL 2; Engineering Application Application for Grading Permit CITY OF CALSBAb ENGINEERING DEPARTMENT 1200 Elm Avenue. 438.5541 PE NO. 2, 11,70 33 Validation by Finance 22OO BP 0 OT5638'273/BI .-22600 TI Building Permit Plan Check No. - 79298 FOR APPLICANT TO FILL IN Site Address Surety Company Bond No. West of 1-5 between Cannon Road & Palomar Airport Rd. S eA A og ,01 91@ ZZ37 Legal Description Map No. Surety Address Parcel 2.. M.S._507 Subdivision Name Date Filed 4Z3) Reby Carlsbad Commercial Center Owner Phone Cash deposit Rec'd by Date filed Carlsbad Coimiercial Center Partners 714/640-1360 $ _- Owner's Address The following documents are required and shall become a part 1303 Avocado, Suite 220, Newport Beach 92660 of the grading permit when they are approved. ) Grading plans Specifications Plans by Civil Engineer Jene E. Lyle R.C.E. Williamson and Schmid 24876 ____ Soil report Geologic Report Address Phone 17782 Sky Park Blvd., Irvine 92714 714/549-2222 ______ Drainage structures ______ Other )0 Compaction report Soil Engineer R.C.E. Phone Robert Prater, C. E. 714/453-5605 Grading Contractor Phone SPECIAL CONDITIONS WHICH ARE MADE 7 c2 A PART OF THIS PERMIT Address Authorized hours of operation: 7:00 AM to Sunset, Monday - Friday. Party responsible for overall supervision Robert Prater Associates Haul routes are to be approved by City Engineer. Proposed use of grade site commercial development Adequate provisions shall be made for erosion and siltation control. Number of cubic yards Cut Fill Import Waste All slopes shall be planted per City Code. 21f 550 101560 I I I37 0 I ---0--- I Proposed Schedule of Start Finish All fills to be compacted to at least 90% of optimum Operations (dates) density unless noted otherwise. I hereby acknowledge that I have read the application and state that the information I have provided is correct and agree to comply with all City ordinances and State laws regulating excavating and grading, - Under City Code Sec. 11.06 170 this grading is: and the provisions and conditions of any permit issued pursuant to REGULAR GRADING - City inspector will make inspections this application. listed below. E) CONTROLLED GRADING - Private grading engineer shall Signature of Permittee observe work, coordinate tests, make reports. INSPECTION DATE INSP. SIGNATURE Owner or authorized age Initial - site prep. ENVIRONMENTAL CLEAONCE - No. 9g Date Rough - prior to drains EIA Log Final - slopes planted By Compaction reports rec'd. Grading permit fee $ ) oo Plan check fee $ .4.13 oo Private engr. cert. rec'd. Permit Isse - A i 17 I> I by 'aAA91 Date I Copies White-Office; Green-Building; Permit Expiration Date 10iM Yellow-Inspector; Pink-Permittee; Goldenrod-Finance THIS FORM WHEN PROPERLY VALIDATED IS A PERMIT TO DO THE WORK DESCRIBED THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD