Loading...
HomeMy WebLinkAboutPE 2.7.10; RANCHO DEL PONDEROSA UNIT 2; Engineering ApplicationI Application for Grading Per CITY OF CARLSBAD PUBLIC WORKS & BUILDING DEPARTMENT 1200 Elm Avenue 729-1181 PERMIT NO.________ (letter code + number) L lot S=subd ivis ion SEP -3•75 FOR APPI ICANT TO F11 1 IN Site Address Olivenhain Road east of El Camino Real Surety Bond Bond No. Legal Description Map No. Por._Lot_11_of_ Rancho _Las _Encinitas, _Map _848 Surety Company Subdivision Name Rancho Del Ponderosa Unit No. 2 Surety Address Owner Phone Ponderosa Homes 1-833-2180 Date Filed Rec'd by Owner's Address 2082 Business Center Dr. Suite 100, Irvine, CA Cash deposit Rec'd by Date filed $ P lans by Civil Engineer R.C.E. RCE Lyle F. Gabrielson/Rick Engineering. Co. 18147 The following documents are required and shal become a part of the grading permit when they are approved. _Grading plans ,Specifications Soil report Vicinity map Drainage structures _etaining walls compaction report ,_Other Address Phone 5620 Friars Road, San Diego CA 291-0707 Soil Engineer R.C.E. Phone Woodward-C1yre & 224-2911 Grading Contractor Phone Pnnderns T-Trm 1-833-2180 Address Check if supervised (am) grading XX SPECIAL CONDITIONS WHICH ARE MADE A PART OF THIS PERMIT arty responsible for overall supervision Ponderosa Homes I. Authorized hours of operation: 7:00 AM to 'roposed use of grade site subdivision 5:00 PM, Monday-Friday. Haul routes are to be approved by City Jumber of cubic yards Cut Fill Import Waste Engineer. Adequate provisions shall be made for erosion and siltation control. All slopes shall be planted per direction 'a" IQL.UU ' nrn l74,U.)U - of Parks & Recreation Director. Total 192,000 cubic yards grading Compacted fills (yes or no) yes Proposed Schedule of UA,7,6 Operations (dates) uIwn YnirTEud(i I hereby acknowledge that I have read the applica- tion and state that the information I have providec is correct and agree to comply with all City ordinances and State laws regulating excavating anc grading, and the provisions and conditions of any permit issued pursuant to this application. Signature of Permittee Owner or authorized agent,44j, /4e,/2 INSPECTION DATE INSPECTOR'S SIGNATURE Ground preparation - Rough grading Compaction report rec'd. Planting & d rainage Final certification rec'd. Grading permit fee $ E Permit Validation Work completed Surety bond released by Date Permit Expiration Date cJE1/AJ/, /7L THIS FORM WHEN PROPERLY VALIDATED BY SIGNATURE IS A PERMIT TO DO THE WORK DESCRIBED J-4818 THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD