HomeMy WebLinkAboutPE 2.8.11; PALOMAR AIRPORT BUSINESS PARK UNIT 1 LOT 3; Engineering ApplicationPERMIT
Applica1-ionforGradirg Permi t* - (letter code + number)
CITY OF CARLSBAD L=lot
PUBLIC WORKS & BUILDINGS DEPARTMENT S=subdivision
1200 Elm Avenue
.. . C=City contract
729-1181
FOR APPLICANT TO FILL IN -
Site Address . .
64'2 L C444 &A/O JW,4L- Afr40
Surety Bon& Bond No.
Legal Description . Map No.
CL4 r iac .
Surety Company
Subdivision Name '- . PALcE Surety. Address
.. . )wner .'. Phone : 4 -.. ..
Date Filed - . Rec'd by.
. . .
Owner's Address - Cash deposit Rec'd by Date filed
Plan
Mt)
s b.CiviI En ineer .;C.E. . US 134 The foIIoving documents are required and shal
become apart of the grading permit when they.
are . k-ng plans 8Tfication i port,' _rTty map ,
Lige structures Retaining walIs grmpatiori report. Other
.,
. * -
Address : .—Phone, PGO- .I1I
Soil Engineer R.C:E.' . Phone
rading Contractor Phone . 44.c7(,7
Address . Check if supèrvised
/418" ,/Vl l(A.. grad ing .
SPECIAL CONDITI0NS,WHICH ARE MADE
A PART OF THIS PERMIT
'arty responsible for overall supervision
.1. Authorized hours of operation: 7:00 AM to
'róposed use of grade ste . 5:00 PM, Monday-Friday.
Haul routes are to be approved by City
lumber of cubic yards
.
. •.
. . . Cut Fill Import Waste.
. Engineer.. .. ;
Adeguateprovisiohs shall be -made for
erosion and siltation-control.
All slopes shall be planted -per direction
• . .
7
of ,Parks & Recreation Director. - . . -.
. - . Total .
- *
Compacted-fills Pr no)
A4)t C7. 06"'61 _4b4 Proposed Schedule of Start Finish
Operations (dates)
I hereby acknowledge that have read the applica-
tion and state that the information I have provided
is correct and.agree to comply with all City .
ordinances and State laws.regulating excavating,and
grading, and the provision7and conditio9sof 'an
permit issued pursuant t is appl ca i .
Signature of Permitt
Owner orauthorized aaent
INSPECTION DATE INSPECTOR'S
. SIGNATURE -.
Ground preparation
Rough grading
Compaction report rec'd.
Planting &drainage
. . .
-'---- - Final certification rec'd.
Grading permit fee $ . H Work completed . .
.
urety bond released
Permit Validation
b
on .
y'44fl €Lf Date
Permit Expiration Date 2.
THIS FORM WHEN PROPERLY VALIDATED BY SIGNATURE IS A PERMIT TO-DO THE WORK DESCRIBED
THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD