Loading...
HomeMy WebLinkAboutPE 2.8.11; PALOMAR AIRPORT BUSINESS PARK UNIT 1 LOT 3; Engineering ApplicationPERMIT Applica1-ionforGradirg Permi t* - (letter code + number) CITY OF CARLSBAD L=lot PUBLIC WORKS & BUILDINGS DEPARTMENT S=subdivision 1200 Elm Avenue .. . C=City contract 729-1181 FOR APPLICANT TO FILL IN - Site Address . . 64'2 L C444 &A/O JW,4L- Afr40 Surety Bon& Bond No. Legal Description . Map No. CL4 r iac . Surety Company Subdivision Name '- . PALcE Surety. Address .. . )wner .'. Phone : 4 -.. .. Date Filed - . Rec'd by. . . . Owner's Address - Cash deposit Rec'd by Date filed Plan Mt) s b.CiviI En ineer .;C.E. . US 134 The foIIoving documents are required and shal become apart of the grading permit when they. are . k-ng plans 8Tfication i port,' _rTty map , Lige structures Retaining walIs grmpatiori report. Other ., . * - Address : .—Phone, PGO- .I1I Soil Engineer R.C:E.' . Phone rading Contractor Phone . 44.c7(,7 Address . Check if supèrvised /418" ,/Vl l(A.. grad ing . SPECIAL CONDITI0NS,WHICH ARE MADE A PART OF THIS PERMIT 'arty responsible for overall supervision .1. Authorized hours of operation: 7:00 AM to 'róposed use of grade ste . 5:00 PM, Monday-Friday. Haul routes are to be approved by City lumber of cubic yards . . •. . . . Cut Fill Import Waste. . Engineer.. .. ; Adeguateprovisiohs shall be -made for erosion and siltation-control. All slopes shall be planted -per direction • . . 7 of ,Parks & Recreation Director. - . . -. . - . Total . - * Compacted-fills Pr no) A4)t C7. 06"'61 _4b4 Proposed Schedule of Start Finish Operations (dates) I hereby acknowledge that have read the applica- tion and state that the information I have provided is correct and.agree to comply with all City . ordinances and State laws.regulating excavating,and grading, and the provision7and conditio9sof 'an permit issued pursuant t is appl ca i . Signature of Permitt Owner orauthorized aaent INSPECTION DATE INSPECTOR'S . SIGNATURE -. Ground preparation Rough grading Compaction report rec'd. Planting &drainage . . . -'---- - Final certification rec'd. Grading permit fee $ . H Work completed . . . urety bond released Permit Validation b on . y'44fl €Lf Date Permit Expiration Date 2. THIS FORM WHEN PROPERLY VALIDATED BY SIGNATURE IS A PERMIT TO-DO THE WORK DESCRIBED THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD