Loading...
HomeMy WebLinkAboutPE 2.81.05; PASEO DE LA COSTA CONDOMINIUMS; Engineering Application Application for Grading Permit CITY OF CARLSBAD ENGINEERING DEPARTMENT 1200 Elm Avenue 438-5541 Building Permit Plan Check No Validation by Finance Department FOR APPLICANT TO FILL IN Site Address bQ JE LAAJS Surety Company Bond No. Map N &-go . Surety Address Ml SuT'jsion Name ( OLST-A 1ELS Date Filed Rec'd by Phone IAJA)E SP Phone -P// 5'-fl Cash deposit Rec'd by Date filed $ Owner's Addre 3ZDO ('bnci.. The following documents are required and shall become a part TtL_. (AAESA of the grading permit when they are approved. _____ Grading plans Specifications Civil PlarO Ent>61 &3gi-nee R.C.E. Soil report Geologic Report structures _____ Other Compaction report Addiess Phone , C070 Drainage Engineer RC .E , Phone . Grading Contractor Phone SPECIAL CONDITIONS WHICH ARE MADE / A PART OF_ THIS PERMIT ________________________________ Address Authorized hours of operation: 7:00 AM to Sunset, Monday. Friday. P$.y responsible for overall supervision #iJ( t4J (_,- Haul routes are to be approved by City Engineer. ProposAuse of grade site iVtk t (Jt Adequate provisions shall be made for erosion and siltation Number of cubic yards Cut jFill J 'O Import Waste control. All slopes shall be planted per City Code. _T Proposed Schedule of Start Finish All fills to be compacted to at least 90% of optimum Operations (dates) density unless noted otherwise. I hereby acknowledge that I have read the application and state that the information I have provided is correct and agree to comply with all City ordinances and Stat s regulating excavating and grading, Under City Code Sec. 11.06 170 this grading is: and the provisions and co ditions 0 any permit issued pursuant tq Li REGULAR GRADING - City inspector will make inspections this application, listed below. 01 11 000NTROLLED GRADING . Private grading engineer shall Signature of Permittee observe work, cobrdinate tests, make reports. Owner or authorized agent INSPECTION DATE INSP. SIGNATURE Initial . site prep. ENVIRONMENTAL CLEARANCE - Date M4/ii, ,çi / Cr 9R- A) Rough. prior to drains Final . slopes planted EIA Log No. (2 By £4vJLPA.o Compaction reports rec'd. Grading permit fe $ //4. - Plan check fee $ Permi Ose (1%A 1 Private engr. cert. rec'd. by -' - Date Il—I .'-1 1 1 Copies: White-Office; Green-Building; Permit Expiration Date Yellow-Inspector; Pink-Permittee; Goldenrod-Finance THIS FORM WHEN PROPERLY VALIDATED IS PERMIT TO DO THE WORK DESCRIBED THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD