Loading...
HomeMy WebLinkAboutPE 2.81.10; LA COSTA MEADOWS UNIT 4; Engineering ApplicationApplication for Grading Permit CITY OF CARLSBAD ENGINEERING DEPARTMENT 1200 Elm Avenue 438.5541 PE NO. ' 7 —'-"• Validation by Finance Department 5/20/812077 84,000 MC nin, n.,7 ini;'rr1 1i• Building Permit Plan Check No. FOR APPLICANT TO FIIA. IN Site Address c. 19 oed Surety Company ........- BondNo. - egacnp tion '_P7-559 Map No. Surety Address Subdivisio4, Name Date Filed Rec'd by Owner Phon J7q Cash deposit Rec'd by Date filed $ Owner's Address 679/ The following documents are required and shall become a part of the tling permit when they are approved. V'Grading plans Specifications '4oil report Geologic Report structures ___ Other Compaction report Plans by Civil Eineer R.C.E. &AC.) .7Lf/ )e(&J J fl 7 Address Phone * S1k or Drainaoe Soil Engineer R C.E. Phone /o3 . g Con ract Phone 'w --EtTtiThTIONS WHICH ARE MADE A PART OF THIS PERMIT s tParty esponsible for overall s f Authorized hours of operation: 7:00 AM to Sunset, Monday- Friday. 0 Haul routes are to be approved by City Engineer. Proposed use of grade site Adequate provisions shall be made for erosion and siltation control. Number of cubic yards Cut Fill Import Waste All slopes shall be planted per City Code. 1101 701- All fills to be compacted to at least 90% of optimum density unless noted otherwise. Proposed Schedule of Start Finish Operations (dates) P/ I hereby acknowledge that I have read the application and state that the information I have provided is correct and agree to comply with all City ordinances and State laws regulating excavating and grading, and the provisions and conditions of any permit issued pursuant to this application, Signature of Permittee ...,2 Owner or authorized agent 6t i? (Qik.2D Under City Code Sec. 11.06 170 this grading is: - - LI REGULAR GRADING - City inspector will make inspections listed below. LI CONTROLLED GRADING - Private grading engineer shall observe work, coordinate tests, make reports. INSPECTION DATE INSP. SIGNATURE Initial - site prep. ENVIRONMENTAL CLEARANCE - Date './t&'/L3 EIA Log No. ' By Rough - prior to drains Final - slopes planted Compaction reports rec'd. - yu Grading perm' fe Plan check fee $ Private engr. cert. rec Per mKI cT)k?Q - .... j , / / upi es. vv iii Le-..# ii U i. u Permit Expiration Date ___________________________________________ Yellow-Inspector; Pink-Permittee; Goldenrod-Finance THIS FORM WHEN PROPERLY VALIDATED IS PERMIT TO DO THE WORK DESCRIBED THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD