Loading...
HomeMy WebLinkAboutPE 2.81.25; MEADOWBROOK; Engineering ApplicationBuilding Permit Plan Check No. - Application for Grading Permit CITY OF CARLSBAD ENGINEERING DEPARTMENT 1200 Elm Avenue 438-5541 PE No. Validation by Finance Department - 5/21/8(2147 127I.00 M E10T21L11 /2l/8I I271,00 'I' FOR APPLICANT TO FILL IN Site Address 3010 Alga Road, Carlsbad, California 92008 Legal Description Map No. Tract 80-25 10072 Subdivision Name . V Meadowbrook Owner V Phone The Anden Group 438-7902 Owner's Address V 3010 Alga Road, Carlsbad, California 92008 Plans by Civil Engineer R.C.E. Hunsaker & Associates . V Address 300.1 Red Hill,- -Building Vi --Phone Costa Mesa, California '92'62 6 754-1011 Soil Engineer . R.C.E. Phone Eberhart & Axten 438-9416 Grading Contractor Phone J. Teixeira Construction, Inc. 571-0382 Address 4675 Brinell Street, San Diego, Ca 92121 Party responsible for overall supervision Aka Anden Group oposed use of grade site Residential Buildings Number of cubic yards V Cut Fill Import Waste Proposed Schedule of Start Finish Operations (dates) I: I hereby acknowledge that I have read the application and state that the information I have provided is correct and agree to comply with all City ordinances and State laws regulating excavating and grading, and the provisions and conditions of any perpy issued pursuant to this application. 1 7/ ,'7 .. . Signature of Perrnittee "' )P 11. Owner or authorized agent ENVIRONMENTAL CLEARANCE-. V Date ElALogNo. By Grading permit fee $ J Plan check fee$ Z.00 it Issued by -- Date Permit Expiration Date Surety Company Bond No. LOPl een MTIJA-L C4cU47A1y 1f Surety Address . - Date Filed . V Rec'4y MMtct+ 3 0 / cj Cash deposit Rec'd by Date filed $ -.-------- The following documents are required and shall become a part of the grading permit when they are approved. Grading plans )( Specifications Soil report X3 Geologic Report ,ç Drainage structures ) Other p6/es ) Compaction report pr1- 3u?veq'. $;p4r4 19 M1T , Fo A1t'Y Z74/u IUIçCLS Ft01-011 SPECIAL CONDITIONS WHICH ARE MADE A PART OF THIS PERMIT Authorized hours of operation: 700 AM to Sunset, Monday - Friday. Haul routes are to be approved by City Engineer. Adequate provisions shall be made for erosion and siltation control. All slopes shall be planted per City Code. All fills to be compacted to at least 90% of optimum density unless noted otherwise. C/TI C., AITTUt CTO M&6 T- 32 at-, ,J4 4-4 i -t-A-T Ak ('lI;AJ TtI '1,T5 AJEC.55#zy mi To U5' O XpLo5'V5. Under City Code Sec. 11.06 170 this grading is: 0 REGULAR GRADING . City inspector will make inspections listed below. CONTROLLED GRADING . Private grading engineer shall observe work, coordinate tests, make reports. INSPECTION DATE INSP. SIGNATURE Initial - site prep. Rough - prior to drains inal - slopes planted V Compaction reports rec'd. private engr. cert. rec'd. Copies: White-Office; Green-Building; Yellow-Inspector; Pink-Permittee; Goldenrod-Finance THIS FORM WHEN PROPERLY VALIDATED IS A PERMIT TO DO THE WORK DESCRIBED THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD