HomeMy WebLinkAboutPE 2.81.25; MEADOWBROOK; Engineering ApplicationBuilding Permit Plan Check No. -
Application for Grading Permit
CITY OF CARLSBAD
ENGINEERING DEPARTMENT
1200 Elm Avenue
438-5541
PE No.
Validation by Finance
Department
- 5/21/8(2147 127I.00 M
E10T21L11 /2l/8I I271,00 'I'
FOR APPLICANT TO FILL IN
Site Address
3010 Alga Road, Carlsbad, California 92008
Legal Description Map No.
Tract 80-25 10072
Subdivision Name . V
Meadowbrook
Owner V Phone
The Anden Group 438-7902
Owner's Address V
3010 Alga Road, Carlsbad, California 92008
Plans by Civil Engineer R.C.E.
Hunsaker & Associates . V
Address 300.1 Red Hill,- -Building Vi --Phone
Costa Mesa, California '92'62 6 754-1011
Soil Engineer . R.C.E. Phone
Eberhart & Axten 438-9416
Grading Contractor Phone
J. Teixeira Construction, Inc. 571-0382
Address
4675 Brinell Street, San Diego, Ca 92121
Party responsible for overall supervision
Aka Anden Group
oposed use of grade site
Residential Buildings
Number of cubic yards V
Cut Fill Import Waste
Proposed Schedule of Start Finish
Operations (dates) I:
I hereby acknowledge that I have read the application and state that
the information I have provided is correct and agree to comply with
all City ordinances and State laws regulating excavating and grading,
and the provisions and conditions of any perpy issued pursuant to
this application. 1 7/ ,'7 .. .
Signature of Perrnittee
"'
)P 11.
Owner or authorized agent
ENVIRONMENTAL CLEARANCE-.
V Date
ElALogNo.
By
Grading permit fee $ J Plan check fee$ Z.00
it Issued
by -- Date
Permit Expiration Date
Surety Company Bond No.
LOPl een MTIJA-L C4cU47A1y 1f
Surety Address .
-
Date Filed . V Rec'4y
MMtct+ 3 0 / cj
Cash deposit Rec'd by Date filed
$ -.--------
The following documents are required and shall become a part
of the grading permit when they are approved.
Grading plans )( Specifications
Soil report X3 Geologic Report
,ç Drainage structures ) Other p6/es
) Compaction report pr1- 3u?veq'.
$;p4r4 19 M1T , Fo A1t'Y
Z74/u IUIçCLS Ft01-011
SPECIAL CONDITIONS WHICH ARE MADE
A PART OF THIS PERMIT
Authorized hours of operation:
700 AM to Sunset, Monday - Friday.
Haul routes are to be approved by City Engineer.
Adequate provisions shall be made for erosion and siltation
control.
All slopes shall be planted per City Code.
All fills to be compacted to at least 90% of optimum
density unless noted otherwise.
C/TI C., AITTUt CTO M&6 T- 32 at-, ,J4 4-4 i -t-A-T Ak ('lI;AJ TtI
'1,T5 AJEC.55#zy mi To U5' O XpLo5'V5.
Under City Code Sec. 11.06 170 this grading is:
0 REGULAR GRADING . City inspector will make inspections
listed below.
CONTROLLED GRADING . Private grading engineer shall
observe work, coordinate tests, make reports.
INSPECTION DATE INSP. SIGNATURE
Initial - site prep.
Rough - prior to drains
inal - slopes planted V
Compaction reports rec'd.
private engr. cert. rec'd.
Copies: White-Office; Green-Building;
Yellow-Inspector; Pink-Permittee; Goldenrod-Finance
THIS FORM WHEN PROPERLY VALIDATED IS A PERMIT TO DO THE WORK DESCRIBED
THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD