Loading...
HomeMy WebLinkAboutPE 2.81.48; PALOMAR INDUSTRIAL NORTH; Engineering ApplicationApplication for Grading Permit CITY OF CARLSBAD ENGINEERING DEPARTMENT Jo. 2 IS - '7A 1200 Elm Avenue 438.5541 PE No., 1 /1 3 /6 12135 263Oo BP: ,I 1/I/ Uu TI.' Validation by' 'Finance - Department Building Permit Plan Check No. FOR APPLICANT TO FILL IN Site Adr // i Pt 4 Surety Company Bond No. 1. Legal lbescription Map No. Surety Address Sukiivision Name AZ ,yççt Date Filed Rec'd by Owner PhdW / Cash deposit Rec'd by Date filed $ Owner's res The following documents are required and shall become a part i1', of the grading permit when they are approved. Grading plans Specifications Civil Engineer r R.C.E. ,ig H—eltz Soil report Geologic Report Address Phone - Drainage structures ______ Other Compaction report Soi n e gwd4 . R.C.E. 9y Ph z_51)5 , oe Y5. SPECIAL CONDITIONS WHICH ARE MADE A PART OF THIS PERMIT Address,ll ff&' , / Authorized hours of operation: all supervisiof Party 7:00 AM to Sunset, Monday - Friday. ye 2bI I Haul routes are to be approved by City Engineer. Proposed use of grade site 74f 3 % Number of cubic yards &P Adequate provisions shall be made for erosion and siltation control. Cut Fill Import Waste All slopes shall be planted per City Code. C5 SSIO -&— I Proposed Schedule of , start Finish ,. All fills to be compacted to at least 90% of optimum density unless noted otherwise. Operations (dates) I hereby acknowledge that I have read the application and state that the information I have provided is correct and agree to comply with all City ordinances and State laws regulating excavating and grading, - Under City Code Sec. 11.06 170 this grading is: and the provisions and co ditions of any permit issued pursuant to 0REGULAR GRADING - City inspector will make inspections this application. listed below. E)CONTROLLED GRADING - Private grading engineer shall ______ Signature of observe work, coordinate tests, make reports. INSPECTION DATE INSP. SIGNATURE Owner or authorized agent Initial - site prep. ENVIRONMENTAL CLEARANCE - - i . Rough - prior to drains /4 )Date EIA Log No. Final - slopes planted By v i Ian check fee $ Grading pe)1 Compaction reports rec'd. Permit 113 Private engr. cert. rec'd. - ate by Copies: White-Office; Green-Building; Permit Expiration Date Yellow-Inspector; Pink-Permittee; Goldenrod-Finance THIS FORM WHEN PROPERLY VALIDATED IS A PERMIT TO DO THE WORK DESCRIBED THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD