Loading...
HomeMy WebLinkAboutPE 2.81.56; LA COSTA ESTATES NORTH LOT 68; Engineering Applicationd /ck \ 47 building Permit Plan I-4 0 Application for Grading Permit 1 CITY OF CARLSBAD ENGINEERING DEPARTMENT 1200 Elm Avenue 438•5541 PE NO. Ze8s inance 130 MC Department FOR APPLICANT TO FILL IN Site Address 1 PULKILz Surety Company Bond No. Legal Descriptio Map N* W Surety Address Subdivision Name LA 6oWA EWATIJ5 NC9-'tff Date Filed Rec'd by O &~TQIIF-Z Phone V- M2 &A'i i67t41 Cash deposit Rec'd by Date filed $ Owner's Address 9Vi9to2_fMV' (00 Q7?'L CA 'jo2IO The following documents are required and shall become a part of the grading permit when they are approved. Grading plans Specifications _____ Soil report Geologic Report Drainage structures ______ Other ___ Compaction report 1'Io Côm,ociion X'e o,..tin I?/. Plans by Civil Engineer R.C.E. _ 24'1 '( Address Phone M+' LMPIt 114 *7 Soil Engineer PW7t.4L1C4JaAI R.C.E. Phone 1'f4 CO#IS 1i ,S1Z29 Grading Contractor Phone -(o y2,t ',',LkQ(V SPECIAL CONDITIJS WHICH ARE MADE A PART OF THIS PERMIT Address 111 I Authorized hours of operation: 7:00 AM to Sunset, Monday - Friday. Party responsible for overall supervision 1 S i Haul routes are to be approved by City Engineer. Propned use of grade site WW tiL..FA.'4lci Adequate provisions shall be made for erosion and siltation control. Number of cubic yards Cut Fill Import Waste r4. All slopes shall be planted per City Code. 4C,OI4(aQ T- 5. All fills to be compacted to at least 90% of optimum density unless noted otherwise. Proposed Schedule of Start Finish Operations (dates) ?- JaK I , I hereby acknowledge that I have read the application and state that the information I have provided is correct and agree to comply with all City ordinances and State laws regulating excavating and grading, and the provisions and condif ns of any permit issued pursuant to Under City Code Sec. 11.06 170 this grading is: LI REGULAR GRADING - City inspector will make inspections this application. listed below. LI CONTROLLED GRADING - Private grading engineer shall Signature of Permittee observe work, coordinate tests, make reports. INSPECTION DATE INSP. SIGNATURE Owner or authorized agen Initial - site prep. ENVIRONMENTAL CLEARANCE - Date Rough - prior to drains ElALogNo. By /k Final - slopes planted Compaction reports rec'd. f(e..)$f —Pan check tee $ Grading per Private engr. cert. rec'd. Permiyf by Date U_ L1 Copies: White-Office; Green-Building; /1 Permit Expiration Date D ( Yellow-Inspector; Pink-Permittee; Goldenrod-Finance THIS FORM WHEN PROPERLY VALIDATED IS PERMIT TO DO THE WORK DESCRIBED THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD