HomeMy WebLinkAboutPE 2.81.56; LA COSTA ESTATES NORTH LOT 68; Engineering Applicationd
/ck
\
47
building Permit Plan I-4
0 Application for Grading Permit
1 CITY OF CARLSBAD
ENGINEERING DEPARTMENT
1200 Elm Avenue
438•5541
PE NO. Ze8s
inance 130 MC
Department
FOR APPLICANT TO FILL IN
Site Address
1 PULKILz
Surety Company Bond No.
Legal Descriptio Map N*
W
Surety Address
Subdivision Name LA 6oWA EWATIJ5 NC9-'tff
Date Filed Rec'd by
O &~TQIIF-Z Phone
V- M2 &A'i i67t41
Cash deposit Rec'd by Date filed
$
Owner's Address 9Vi9to2_fMV' (00
Q7?'L CA 'jo2IO The following documents are required and shall become a part
of the grading permit when they are approved.
Grading plans Specifications
_____ Soil report Geologic Report
Drainage structures ______ Other
___ Compaction report
1'Io Côm,ociion X'e o,..tin I?/.
Plans by Civil Engineer R.C.E.
_ 24'1 '( Address Phone M+' LMPIt 114 *7 Soil Engineer PW7t.4L1C4JaAI R.C.E. Phone
1'f4 CO#IS 1i ,S1Z29
Grading Contractor Phone -(o y2,t ',',LkQ(V SPECIAL CONDITIJS WHICH ARE MADE
A PART OF THIS PERMIT
Address
111 I Authorized hours of operation:
7:00 AM to Sunset, Monday - Friday.
Party responsible for overall supervision
1 S i Haul routes are to be approved by City Engineer.
Propned use of grade site
WW tiL..FA.'4lci Adequate provisions shall be made for erosion and siltation
control. Number of cubic yards
Cut Fill Import Waste r4. All slopes shall be planted per City Code.
4C,OI4(aQ T-
5. All fills to be compacted to at least 90% of optimum
density unless noted otherwise.
Proposed Schedule of Start Finish
Operations (dates) ?- JaK I ,
I hereby acknowledge that I have read the application and state that
the information I have provided is correct and agree to comply with
all City ordinances and State laws regulating excavating and grading,
and the provisions and condif ns of any permit issued pursuant to
Under City Code Sec. 11.06 170 this grading is:
LI REGULAR GRADING - City inspector will make inspections
this application. listed below.
LI CONTROLLED GRADING - Private grading engineer shall
Signature of Permittee observe work, coordinate tests, make reports.
INSPECTION DATE INSP. SIGNATURE
Owner or authorized agen
Initial - site prep.
ENVIRONMENTAL CLEARANCE -
Date Rough - prior to drains
ElALogNo.
By /k
Final - slopes planted
Compaction reports rec'd. f(e..)$f —Pan check tee $ Grading per
Private engr. cert. rec'd. Permiyf
by Date U_ L1 Copies: White-Office; Green-Building;
/1 Permit Expiration Date D ( Yellow-Inspector; Pink-Permittee; Goldenrod-Finance
THIS FORM WHEN PROPERLY VALIDATED IS PERMIT TO DO THE WORK DESCRIBED
THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD