HomeMy WebLinkAboutPE 2.81.59; CHESTNUT AVENUE; Engineering ApplicationApplication for Grading Permit
CITY OF CARLSBAD
ENGINEERING DEPARTMENT
1200 Elm Avenue
438.5541
PE NO.
Validation by Finance
Department
3/29 /821172 87OO M 000..172 3' , /29/ 13p A7flfl TI
Building Permit Plan Check No.
FOR APPLICANT TO FILL IN
Site Address Surety Company Bond No. 394837
307 Chestnut Ave Robert F. Driver Co./INSURANCE W. OF VfT
Legal Description Map No. 1 r6ty Address
Lot 24 Blk. P of Palisades 1747 . Cedar St. San Diego, CA 92112
Subdivision Name Date Filed Rec'd by
Owner Phone Cash deposit Rec'd by Date filed
STAVER 942 -3256 .$
Owner's Address IThe following documents are required and shall become a part
1240 Melba Rd. Encinitas, CA 92024 of the grading permit when they are approved.
Grading plans Specifications
_____ Soil report Geologic Report
Plans by Civil Engineer R.C.E.
Brian Smith 13,817
Address Phone
2656 State St. Carlsbad, CA 729-8981 Drainage structures Other
Compaction report Soil Engineer R.C.E. Phone
San Dieguito Engineering 756-3064
Grading Contractor Phone SPECIAL CONDITIONS WHICH ARE MADE
Stan Bechtel 755-0754 . A PART OF THIS PERMIT
Address Authorized hours of operation: 629 So. Cedros Avenue, Solana Beach 7:00 AM to Sunset, Monday - Friday.
Party responsible for overall supervision
Torrey Pacific Development / Jim Stayer Haul routes are to be approved by City Engineer. Proposed use of grade Site
apartment project AIequate provisions shall be made for erosion and siltation Number of cubic yards control.
Cut Fill Import Waste All slopes shall be planted per City Code.
0 900 900 0
All fills to be compacted to at least 90% of optimum Proposed Schedule of Start Finish
Operations (dates) 3/22/82 5/22/82 density unless noted otherwise.
I hereby acknowledge that I have read the application and state that
the information I have provided is correct and agree to comply with
all City ordinances and State laws regulating excavating and grading, Under City Code Sec. 11.06 170 this grading is:
and the provisions and conditions of any permit issued pursuant to L REGULAR GRADING - City inspector will make inspections
this application, listed below.
LI CONTROLLED GRADING - Private grading engineer shall
Signature of Permittee observe work, coordinate tests, make reports.
INSPECTION DATE INSP. SIGNATURE
Owner or authorized agent
Initial - site prep.
ENVIRONMENTAL CLEARANCE -
Date 2 _____________________
Rough - prior to drains
EIA Log No. 7 Final- slopes planted
By
Compaction reports rec'd.
Grading permit ee 2..... Plan check fee $
engr. cert. rec'd. Permit Issuej,j}J A Private
DY LJdL ' 1 Copies White-Office; (ireen-Building;
Permit Expiration Date 2 ''— Yellow-Inspector; Pink-Permittee; Goldenrod- Finance
THIS FORM WHEN PROPERLY VALIDATED IS A PERMIT TO DO THE WORK DESCRIBED
THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD