Loading...
HomeMy WebLinkAboutPE 2.81.59; CHESTNUT AVENUE; Engineering ApplicationApplication for Grading Permit CITY OF CARLSBAD ENGINEERING DEPARTMENT 1200 Elm Avenue 438.5541 PE NO. Validation by Finance Department 3/29 /821172 87OO M 000..172 3' , /29/ 13p A7flfl TI Building Permit Plan Check No. FOR APPLICANT TO FILL IN Site Address Surety Company Bond No. 394837 307 Chestnut Ave Robert F. Driver Co./INSURANCE W. OF VfT Legal Description Map No. 1 r6ty Address Lot 24 Blk. P of Palisades 1747 . Cedar St. San Diego, CA 92112 Subdivision Name Date Filed Rec'd by Owner Phone Cash deposit Rec'd by Date filed STAVER 942 -3256 .$ Owner's Address IThe following documents are required and shall become a part 1240 Melba Rd. Encinitas, CA 92024 of the grading permit when they are approved. Grading plans Specifications _____ Soil report Geologic Report Plans by Civil Engineer R.C.E. Brian Smith 13,817 Address Phone 2656 State St. Carlsbad, CA 729-8981 Drainage structures Other Compaction report Soil Engineer R.C.E. Phone San Dieguito Engineering 756-3064 Grading Contractor Phone SPECIAL CONDITIONS WHICH ARE MADE Stan Bechtel 755-0754 . A PART OF THIS PERMIT Address Authorized hours of operation: 629 So. Cedros Avenue, Solana Beach 7:00 AM to Sunset, Monday - Friday. Party responsible for overall supervision Torrey Pacific Development / Jim Stayer Haul routes are to be approved by City Engineer. Proposed use of grade Site apartment project AIequate provisions shall be made for erosion and siltation Number of cubic yards control. Cut Fill Import Waste All slopes shall be planted per City Code. 0 900 900 0 All fills to be compacted to at least 90% of optimum Proposed Schedule of Start Finish Operations (dates) 3/22/82 5/22/82 density unless noted otherwise. I hereby acknowledge that I have read the application and state that the information I have provided is correct and agree to comply with all City ordinances and State laws regulating excavating and grading, Under City Code Sec. 11.06 170 this grading is: and the provisions and conditions of any permit issued pursuant to L REGULAR GRADING - City inspector will make inspections this application, listed below. LI CONTROLLED GRADING - Private grading engineer shall Signature of Permittee observe work, coordinate tests, make reports. INSPECTION DATE INSP. SIGNATURE Owner or authorized agent Initial - site prep. ENVIRONMENTAL CLEARANCE - Date 2 _____________________ Rough - prior to drains EIA Log No. 7 Final- slopes planted By Compaction reports rec'd. Grading permit ee 2..... Plan check fee $ engr. cert. rec'd. Permit Issuej,j}J A Private DY LJdL ' 1 Copies White-Office; (ireen-Building; Permit Expiration Date 2 ''— Yellow-Inspector; Pink-Permittee; Goldenrod- Finance THIS FORM WHEN PROPERLY VALIDATED IS A PERMIT TO DO THE WORK DESCRIBED THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD