HomeMy WebLinkAboutPE 2.82.1; PAPAGAYO BY THE BAY LOT 4; Engineering ApplicationApplication for Grading Permit
CITY OF CARLSBAD
ENGINEERING DEPARTMENT
1200 Elm Avenue
4385541
Building Permit Plan Check No.
PE NO. 292 .
Validation by Finance
Department
l/I5/82 cCiLI
001 60G i/I/ 8P I;5.00 ;ic
F3LesO0 T&
FAR APPI I(ANT TA FILL IN
Site Address
4J14 A-L,'
Surety Company Bond No.
Legal Description Map No. Surety Address
Subdivision Name
61 Yh Bf/le
Date Filed Rec'd by
Owner Phone '& III
A-Yo 7 - - ±L
Cash deposit Rec'd by Date filed
$
Owner's Address The following documents are required and shall become a part
of the grading permit when they are approved.
Grading plans Specifications
_____ Soil report Geologic Report
Drainage structures ____ Other
Compaction report
Plans by Civil Engineer R.C.E.
4.— t//LL_-.3>
Address Phone
, 8C5D
7 .c -n30
Soil Engineer R.C.E. Phone
c4-L
Grading Contractor
-
(1/I64y 1'e
IV Cei)
SPECIAL CONDITIONS WHICH ARE MADE
A PART OF THIS PERMIT
Address Z7 je...-Jta.. 4142-d
_______________________________________ 3o?Th-TT 'Y Jr
1. Authorized hours of operation:
7:00 AM to Sunset, Monday - Friday.
I if Party responsible for ov
Haul routes are to be approved by City Engineer.
Proposed use of grade site
C.Ø(J"bOtY1.4,JiU(V1 Adequate provisions shall be made for erosion and siltation
control. Number of cubic yards
Cut Fill Import Waste All slopes shall be planted per City Code.
/O,000
All fills to be compacted to at least 90% of optimum
density unless noted otherwise.
Proposed Schedule of Start Finish
Operations (dates) Z34., /l...M-(2_L0 /3
I hereby acknowledge that I have read the application and state that
the information I have provided is correct and agree to comply with
all City ordinances and State laws regulatipj excavating and grading,
and the provisions and °
this application.
Signature of Permittee
f'b iz'r
Owner or authorized agent
- - - Under City Code Sec. 11.06 170 this grading is:
REGULAR GRADING - City inspector will make inspections
listed below.
0
E CONTROLLED GRADING - Private grading engineer shall
observe work, coordinate tests, make reports.
INSPECTION DATE INSP. SIGNATURE
Initial - site prep.
ENVIRONMENTAL CLEARANCE
- // Date
EIA Log No.Axit, P Final
By
Rough - prior to drains
- slopes planted
Compaction reports rec'd.
Grading permit fee $ / / $IOT _-, Plan check fee $
Private engr. cert. rec'd. Permit Issued
Date Copies: White-Office; Green-Building;
Permit Expiration Date Yellow-Inspector; Pink-Permittee; Goldenrod-Finance
THIS FORM WHEN PROPERLY VALIDATED IS A PERMIT TO DO THE WORK DESCRIBED
THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD