HomeMy WebLinkAboutPE 2.82.37; PATIO HILLS|LA COSTA MEADOWS #3; Engineering ApplicationApplication for Grading Permit rj PE NO. z37
Building Permit Plan Check No. e 3,33
CITY OF CARLSBAD
ENGINEERING DEPARTMENT
1200 Elm Avenue
438-5541 Validation by Finance
pt, 56
85 6 3/16/33
WLi.0C tic
'114.00 T1..
FOR APPLICANT TO FILL IN
Site Address e oE4)/
Surety Company Bond No.
Legal Description t4.&,Q /4IJf Map No.
/ SuretyAddress
Subdivision Name
0_ LLc ;17L,/7I, Date Filed Rec'd by
Owner )
1/0 /)6146W0149
Phon 79g Cash deposit Rec'd by Date filed
$
Owner's Address
' £Zec?jIt?z P The following documents are required and shall become a part 4i4t/h.L!7 i.fi11 € of the grading permit when they are approved.
Grading plans Specifications
Soil report Geologic Report
Drainage structures ___ Other
report
PI by vil R.C.E.
Address Phone
4? 616-6 Z!IU IF
Sil Engineer R C.E. Phone Compaction
72 03 ZoIC
Contractor Phone ,C SPECIAL CONDITIONS WHICH ARE MADE
___ A PART OF THIS PERMIT
Address 2401 &a 7 g1 1. Authorized hours of operation:
7:00 AM to Sunset, Monday - Friday.
1 2. Haul routes are to be approved by City Engineer. Pasty respoDQbIer
overall supervision
U/i'-o ,L.;) .eAV_,A 0
Ppposed use of grade site
1 7 Adequate provisions shall be made for erosion and siltation Number of cubic yards control.
Cut Fill Import Waste
All slopes shall be planted per City Code.
/w
Proposed Schedule of Start Finish
Operations (dates) .'-cP3
All fills to be compacted to at least 90% of optimum
density unless noted otherwise.
I hereby acknowledge that I have read the application and state that
the information I have provided is correct and agree to comply with
all City ordinances and State laws regulating excavating and grading, Under City Code Sec. 11.06 170 this grading is: and the provisions and conditions of any permit issued pursuant to REGULAR GRADING - City inspector will make inspections this application. listed below.
Signature of Permittee fl CONTROLLED GRADING - Private grading engineer shall
observe work, coordinate tests, make reports.
INSPECTION DATE INSP. SIGNATURE Owner or authorized agent V,1? (Qe,Lti/Z3
Initial - site prep.
ENVIRONMENTAL CLEARANCE.
V Date Rough . prior to drains
'Log E IA No.
By Final . slopes planted
Grading permit f $ Plan check fee $ Compaction reports rec'd.
Per
by ______________________________ _______ Date ____
Private Private engr. cert. rec'd.
V
.flJ1JIa. VV III LC'.JI I It..C, '.JU CCI UUIIUII 19,
Permit Expiration Date Yellow-Inspector; Pink-Permittee; Goldenrod-Finance
THIS FORM WHEN PROPERLY VALIDATED ISA PERMIT TO DO THE WORK DESCRIBED
THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD