HomeMy WebLinkAboutPE 2.83.06; TEMPLIN HEIGHTS UNIT 2; Engineering ApplicationBuilding Permit Plan Check No
Application for Grading Permit 40
CITY OF CARLSBAD
ENGINEERING DEPARTMENT
1200 Elm Avenue
438-5541
PE NO. Z'. 04'
Validation by Fi ance
Dp e I11
FOR APPLICANT TO FILL IN
Site Address Surety Company Bond No.
Victoria East of Pontiac '. Co..
Legal Description Map No. Surety Address
Subdivision Map # 10129 Do
Subdivision Name Date Filed Rec'd by
Templin Heights Unit No. 2 3't 2.
Owner Phone Cash deposit Rec'd by Date filed
McMillin Development (619) 477 411$ 3,700.00
Owner's Address The following documents are required and shall become a part
2727 Hoover Ave., National City 92050 of the grading permit when they are approved.
Grading plans Specifications
Plans by Civil Engineer R.C.E.
Brian Smith 13817 Soil report Geologic Report Address Phone
2656 State St., Carlsbad 729 8981 / Drainage structures ______ Other
Compaction report Soil Engineer R.C.E. Phone
Krooskos_&_ Associates _11318283_6506
Grading Contractor Phone SPECIAL CONDITIONS WHICH ARE MADE
Templeton Grading 727 1347 A PART OF THIS PERMIT
Address
1010 Linda Vista Dr., San Marcos Authorized hours of operation:
7:00 AM to Sunset, Monday - Friday. Party responsible for overall supervision
Haul routes are to be approved by City Engineer. MeMillin Development Ed Elliott
Proposed use ofgrade site
construct single family dwellings Adequate provisions shall be made for erosion and siltation Number of cubic yards control.
Cut Fill Import Waste
All slopes shall be planted per City Code.
21,000 21,flfl0
Proposed Schedule of Start Finish All fills to be compacted to at least 90% of optimum
Operations (dates) 3/83 4/83 —I density unless noted otherwise.
I hereby acknowledge that I have read the application and state that
the information I have provided is correct and agree to comply with
all City ordinances and State laws regulating excavating and grading,
and the provisions and conditions of any permit issued pursuant to Under City Code Sec. 11.06 170 this grading is:
REGULAR GRADING - City inspector will make inspections this application. ,--,Listed below.
Signature of Permittee McMILLIN DEVELOPMENT, INC. ,CONTROLLED GRADING - Private grading engineer shall
observe work, coordinate tests, make reports.
Owner or authorized agent INSPECTION DATE INSP. SIGNATURE
Initial - site prep.
ENVIRONMENTAL CLEAAF 'CE -
Rough - prior to drains
El A Log No. E.S lZ_
By
Final - slo pes planted ko ___________
Compaction reports rec'd. Grading permit fee $ Plan check fee $
Permit Issued 1111,7.. Private engr. cert. rec'd.
UY UdW - ' Copies: White-Office; Green-Building;
Permit Expiration Date 2 4Ii93 Yellow-Inspector; Pink-Permittee; Goldenrod-Finance
THIS FORM WHEN PROPERLY VALIDATED IS PERMIT TO DO THE WORK DESCRIBED
THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD