Loading...
HomeMy WebLinkAboutPE 2.83.06; TEMPLIN HEIGHTS UNIT 2; Engineering ApplicationBuilding Permit Plan Check No Application for Grading Permit 40 CITY OF CARLSBAD ENGINEERING DEPARTMENT 1200 Elm Avenue 438-5541 PE NO. Z'. 04' Validation by Fi ance Dp e I11 FOR APPLICANT TO FILL IN Site Address Surety Company Bond No. Victoria East of Pontiac '. Co.. Legal Description Map No. Surety Address Subdivision Map # 10129 Do Subdivision Name Date Filed Rec'd by Templin Heights Unit No. 2 3't 2. Owner Phone Cash deposit Rec'd by Date filed McMillin Development (619) 477 411$ 3,700.00 Owner's Address The following documents are required and shall become a part 2727 Hoover Ave., National City 92050 of the grading permit when they are approved. Grading plans Specifications Plans by Civil Engineer R.C.E. Brian Smith 13817 Soil report Geologic Report Address Phone 2656 State St., Carlsbad 729 8981 / Drainage structures ______ Other Compaction report Soil Engineer R.C.E. Phone Krooskos_&_ Associates _11318283_6506 Grading Contractor Phone SPECIAL CONDITIONS WHICH ARE MADE Templeton Grading 727 1347 A PART OF THIS PERMIT Address 1010 Linda Vista Dr., San Marcos Authorized hours of operation: 7:00 AM to Sunset, Monday - Friday. Party responsible for overall supervision Haul routes are to be approved by City Engineer. MeMillin Development Ed Elliott Proposed use ofgrade site construct single family dwellings Adequate provisions shall be made for erosion and siltation Number of cubic yards control. Cut Fill Import Waste All slopes shall be planted per City Code. 21,000 21,flfl0 Proposed Schedule of Start Finish All fills to be compacted to at least 90% of optimum Operations (dates) 3/83 4/83 —I density unless noted otherwise. I hereby acknowledge that I have read the application and state that the information I have provided is correct and agree to comply with all City ordinances and State laws regulating excavating and grading, and the provisions and conditions of any permit issued pursuant to Under City Code Sec. 11.06 170 this grading is: REGULAR GRADING - City inspector will make inspections this application. ,--,Listed below. Signature of Permittee McMILLIN DEVELOPMENT, INC. ,CONTROLLED GRADING - Private grading engineer shall observe work, coordinate tests, make reports. Owner or authorized agent INSPECTION DATE INSP. SIGNATURE Initial - site prep. ENVIRONMENTAL CLEAAF 'CE - Rough - prior to drains El A Log No. E.S lZ_ By Final - slo pes planted ko ___________ Compaction reports rec'd. Grading permit fee $ Plan check fee $ Permit Issued 1111,7.. Private engr. cert. rec'd. UY UdW - ' Copies: White-Office; Green-Building; Permit Expiration Date 2 4Ii93 Yellow-Inspector; Pink-Permittee; Goldenrod-Finance THIS FORM WHEN PROPERLY VALIDATED IS PERMIT TO DO THE WORK DESCRIBED THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD