Loading...
HomeMy WebLinkAboutPE 2.83.33; LA COSTA MEADOWS UNIT 4 LOT 721; Engineering Applicationr To. C PA-r) Application for Grading Permit PE NO. - ' 4PAY CITY OF CARLSBAD ENGINEERING DEPARTMENT 1200 Elm Avenue I Validation by Finance 4385541 Department Building Permit Plan Check No. !/3 s FOR APPLICANT _TO_ FILL _IN Site Address -n i M6vAWTA ulk'/ Surety Company Bond No Legal Descrirition Map No Lxr4* 72 Surety Address Subdivision Name I Date Filed Rec'd by 0wner64py LIkM Pe Cap?it Rec'd by Date filed Owner's ..4/i) D CA cA)c -r The following documents are required and shall become a part of the grading permit when they are approved. Grading plans Specifications V" Soil report Geologic Report Drainage structures ______ Other Compaction report by Civil Engineer R.C.E. Pla, Pbu&)-o C 29f!.? Address /4s Phone Soil Engineer R.C.E. Phone na Contractor i) Phone SPECIAL CONDITIONS WHICH ARE MADE A PART OF THIS PERMIT __ Address Authorized hours of operation: 7:00 AM to Sunset, Monday - Friday. Party responsible for over II supervision \44! Wr-rALL cr t1c/2. kk Haul routes are to be approved by City Engineer. rop d use of gradi.W iJGi_ 1A)4)L'f DtL)/J& Adequate provisions shall be made for erosion and siltation control. Number of cubic yards Cut Fill Import Waste All slopes shall be planted per City Code. 5 qq 4 1 0,- .. Proposed Schedule of Start Finish Operations (dates) (1 ,4.:cJG 3 2$ ,4si&93 All fills to be compacted to at least 90% of optimum density unless noted otherwise. I hereby acknowledge that I have read the application and state that the information I have provided is correct and agree to comply with ,lI (tti ordinances and State ItAlC røni iktir,ri tv'n,,tinn and nr,rIinn '' "'"" Under City Code Sec. 11.06 170 this grading is: and the provisions and conditions of any Signature of Permittee A to E REGULAR GRADING - City inspector will make inspections this application. listed below. LI CONTROLLED GRADING - Private grading engineer shall observe work, coordinate tests, make reports. Owner or authoed \ INSPECTION DATE INSP. SIGNATURE Initial - site prep. ENVIRONM 'TALCLE RN - _____________________ Rough - prior to drains ElA'LogNo ) - Grading permit Permit Issued hv Permit Expiration Date' 10C.3 Plan check fee $ I 5 2" Compaction ports rec'd. T6-64L ' Private engrert. rec'd. Date Copies: White-Office; Green-Building; Yellow-Inspector; Pink-Permittee; Goldenrod-Finance THIS FORM WHEN PROPERLY VALIDATED IS PERMIT TO DO THE WORK DESCRIBED THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD