Loading...
HomeMy WebLinkAboutPE 2.83.43; LA COSTA MEADOWS UNIT 4 LOT 704; Engineering Applicationbvt, NO. ?3Z # 4 M47 Application for Grading Permit CITY OF CARLSBAD ENGINEERING DEPARTMENT 1200 Elm Avenue 438.5541 PE NO. 23.43 Validation by Finance Department Building Permit Plan Check No. FOR APPLICANT TO FILL IN Site Address 00, 7135 Babilonia Street Surety Company Bond No. Legal Description Map No. Lot 704 7367 Surety Address Subdivision Name La Costa Meadows Unit No. 4 Date Filed Rec'd by Owner Phone Mr. & Mrs. Herbert Nagnes Cash deposit Rec'd by Date filed $ Owner's Address 2612 Obelisco Place, Carlsbad The following documents are required and shall become a part of the grading permit when they are approved. _____ Grading plans ,. Specifications ____'oi report Geologic Report Drainage structures ______ Other Compaction report Plans by Civil Engineer R.C.E. Luke-Dudek, Greg Luke 4124873 Address Phone 575 Second Street. Encinitas.942-5147 Soil Engineer •F.CEG Phone #1087 Leighton & Assoc—Greg Farranci 292-8030 Grading Contractor Phone SPECIAL CONDITIONS WHICH ARE MADE A PART OF THIS PERMIT Address - Authorized hours of operation: 7:00 AM to Sunset, Monday - Friday. Party responsible for overall supervision Haul routes are to be approved by City Engineer. Proposed use of grade site Single Family Residential Adequate provisions shall be made for erosion and siltation control. Number of cubic yards Cut Fill Import Waste All slopes shall be planted per City Code. 1 9660 9660 --F All fills to be compacted to at least 90% of optimum density unless noted otherwise. Proposed Schedule of Start Finish Operations (dates) I hereby acknowledge that I have read the application and state that the information I have provided is correct and agree to comply with all City ordinances and State laws regulating excavating and grading, and the provisions and conditions of any permit issued pursuant to this application. Signature of Permittee UnknOWn Owner or authorized agent ____________________________ listed below. Under City Code Sec. 11.06 170 this grading is: U REGULAR GRADING - City inspector will make inspections CONTROLLED GRADING - Private grading engineer shall observe work, coordinate tests, make reports. INSPECTION DATE INSP. SIGNATURE Initial - site prep. ENVIRONMENTAL CLEARA CE - Date j /3 EIALog No. By p '134 &, • Rough - prior to drains Final - slopes planted Compaction reports rec'd. - Grading permit fee $ \3 Plan check fee $ go Private engr. cert. rec'd. Permit Issued hu Date Copies: White-Office; Green-Building; Permit Expiration Date Yellow-Inspector; Pink-Permittee; Goldenrod-Finance THIS FORM WHEN PROPERLY VALIDATED IS PERMIT TO DO THE WORK DESCRIBED THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD