HomeMy WebLinkAboutPE 2.83.43; LA COSTA MEADOWS UNIT 4 LOT 704; Engineering Applicationbvt, NO. ?3Z
# 4 M47
Application for Grading Permit
CITY OF CARLSBAD
ENGINEERING DEPARTMENT
1200 Elm Avenue
438.5541
PE NO. 23.43
Validation by Finance
Department
Building Permit Plan Check No.
FOR APPLICANT TO FILL IN
Site Address 00,
7135 Babilonia Street
Surety Company Bond No.
Legal Description Map No.
Lot 704 7367
Surety Address
Subdivision Name
La Costa Meadows Unit No. 4
Date Filed Rec'd by
Owner Phone
Mr. & Mrs. Herbert Nagnes
Cash deposit Rec'd by Date filed
$
Owner's Address
2612 Obelisco Place, Carlsbad
The following documents are required and shall become a part
of the grading permit when they are approved.
_____ Grading plans ,. Specifications
____'oi report Geologic Report
Drainage structures ______ Other
Compaction report
Plans by Civil Engineer R.C.E.
Luke-Dudek, Greg Luke 4124873
Address Phone 575 Second Street. Encinitas.942-5147
Soil Engineer •F.CEG Phone
#1087 Leighton & Assoc—Greg Farranci 292-8030
Grading Contractor Phone SPECIAL CONDITIONS WHICH ARE MADE
A PART OF THIS PERMIT
Address - Authorized hours of operation:
7:00 AM to Sunset, Monday - Friday.
Party responsible for overall supervision
Haul routes are to be approved by City Engineer. Proposed use of grade site
Single Family Residential Adequate provisions shall be made for erosion and siltation
control. Number of cubic yards
Cut Fill Import Waste
All slopes shall be planted per City Code.
1 9660 9660 --F
All fills to be compacted to at least 90% of optimum
density unless noted otherwise.
Proposed Schedule of Start Finish
Operations (dates)
I hereby acknowledge that I have read the application and state that
the information I have provided is correct and agree to comply with
all City ordinances and State laws regulating excavating and grading,
and the provisions and conditions of any permit issued pursuant to
this application.
Signature of Permittee UnknOWn
Owner or authorized agent ____________________________
listed below.
Under City Code Sec. 11.06 170 this grading is:
U REGULAR GRADING - City inspector will make inspections
CONTROLLED GRADING - Private grading engineer shall
observe work, coordinate tests, make reports.
INSPECTION DATE INSP. SIGNATURE
Initial - site prep.
ENVIRONMENTAL CLEARA CE
- Date
j /3
EIALog No.
By p '134 &, •
Rough - prior to drains
Final - slopes planted
Compaction reports rec'd.
- Grading permit fee $ \3 Plan check fee $ go
Private engr. cert. rec'd. Permit Issued
hu Date Copies: White-Office; Green-Building;
Permit Expiration Date Yellow-Inspector; Pink-Permittee; Goldenrod-Finance
THIS FORM WHEN PROPERLY VALIDATED IS PERMIT TO DO THE WORK DESCRIBED
THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD