Loading...
HomeMy WebLinkAboutPE 2.83.48; THE VILLAS AT CALAVERA HILLS VILLAGE J; Engineering Application.'Application for Grading Permit PE NO. CITY OF CARLSBAD ENGINEERING DEPARTMENT 1200 Elm Avenue 2.3 A 438-5541 Validation by Finance Department ir=E75' PA 10 Building Permit Plan Check No. JA FOR APPI l(ANT TO FII I IN Site Address Northwest Corner of the intersection of Elm and Tamarack Avenue Surety Company Bond No. IVtMI I#J 5. CO 7 31 3 t Legal Description py-Ijofl of Lot J Map No. 823 Rancho Aqua Hedionda Surety Address 7-5-0 i31- i 4II ?I j' _____________________________________ Subdivision Name The Villas at Calavera Hills Carlsbad Tract 82-16 Date Filed ec'd by t Owner Phone Treetops Unlimited (619) 299-5100 Cash deposit Re 'd by Date filed $ I 21 I C / QL j L' 3 Owner's Address 3900 Harney St. San Diego, CA. 92110 The following documents are required and shall become a part of the grading permit when they are aPProved..(. Grading plans Specitic.àrons Soil report '.-' Geologic Report Drainage structures _____ Other Compaction report Plans by Civil Engineer R.C.E. 20984 Rick E -igineering Co. Jerald L. Van t Address Phone (619) 5620 Friars Pd. San Diego, CA. 92110 291-0707 Soil Engineer Robert Russe1C.E. 32142Phone (619) So. Calif. Soils&Testing Inc. 280-4231 Grading Contractor Phone (619) Cameron Bros. Const. co.,, Inc. 2783050 SPECIAL CONDITIONS WHICH ARE MADE A PART OF THIS PERMIT Address 7766 Balboa Ave., .V. 92111 Authorized hours of operation: 7:00 AM to Sunset, Monday - Friday. Party responsible for overall supervision John Cajrieron Haul routes are to be approved by City Engineer. Proposed use of grade site Residential Subdivision Adequate provisions shall be made for erosion and siltation control. Number of cubic yards Cut Fill Import Waste All slopes shall be planted per City Code. 474,500 213,700 -0- 260,800 All fills to be compacted to at least 90% of optimum Proposed Schedule of Start Finish Operations (dates) density unless noted otherwise. I hereby acknowledge that I have read the application and state that the information I have provided is correct and agree to comply with all City ordinances and State laws regulating excavating and grading, and the provisions and conditions of any permit issued pursuant to Under City Code Sec. 11.06 170 this grading is: - - U REGULAR GRADING - City inspector will make inspections this application. isted below. CONTROLLED GRADING - Private grading engineer shall Signature of Permittee '1F1___ 2~. observe work, coordinate tests, make reports. Owner or authorized agent INSPECTION DATE INSP. SIGNATURE Initial - site prep. ENVIRONMLTAL CLEARANCE - Ic-I Date Rough - prior to drains EIA Log No. &2- By a Final - slopes planted Compaction reports rec'd. Grading permit fee $945.00 Plan check fee $ 254.00 Private engr. cert. rec'd. Permit,J.sud , , - - by (ALtV Date L-0-1 - Copies: White-Office; Green-Building; Permit Expiration Date ______________________________________________ Yellow-Inspector Pink-Permittee Goldenrod-Finance 5 5E I 6-tJ eb o1F jw-z i THIS FORM WHEN PROPERLY VALIDATED IS A PERMIT TO DO THE WORK DESCRIBED THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD 7fl41' FIL_&