HomeMy WebLinkAboutPE 2.84.33; PALOMAR AIRPORT BUSINESS PARK UNIT 2; Engineering ApplicationVL
TI
Project Engineer Initial____________________________
Application for Grading Permit
CITY OF CARLSBAD
ENGINEERING DEPARTMENT
2075 Las Palmas Drive
438-3634
PE NO. 2'84'3
22 22z4
,ier
N co
Assessors Parcel No.
FOR APPLICANT TO FILL IN
Address
Description Map No.
r 'Z42 1
Project Name
' Owner Phone
01) CR
Owner's Address
#2?a04g O'(Ar 4'zJ9,a
Pf ne Ppaby Civil En
tDA IL #
Address _-.. Phone 4 2
Phone
Contractor Phone
24 Hr.
Address
Party reponble for overall supervision
Proposed use of grade site
Number of cubic yards
Cut Fill Import Waste
Proposed Schedule of Stast
Operations (dates) w I4J4/
I hereby acknowledge that I have read the application and state that
the information I have provided is correct and agree to comply with
all City ordinances and State laws regulating excavating and grading,
and the provisions and conditions of any permit issued pursuant to
this application.
-
FOR DE' MENT USE
IN
Secured Agreement Rec'd.
Cash Deposit Receipt No.
'77303
Drawing No. Building Permit Plancheck No.
General Permit Requirements:
All grading and erosion control work shall be done in accordance with
City Ordinances,
Authorized hours of operation: 7:00 am. to Sunset, Monday through
Friday, excluding city recognized holidays.
Grading work shall not commence until after the pre-construction
conference has been held with the City Inspector
All off-site haul routes require separate approval by the City Engineer
A right-of-way permit is required for all work done in the city right-of-
way..
Special Requirements:
crfi-/
Under City Code Sec. 11.06.170 this grading is:
D Regular Grading - City Inspector will make inspections listed below.
Controlled Grading - private grading engineer shall observe work,
coordinate tests and make reports
Inspection Date Insp. Initial
Initial - Site Prep.
Rough - Grade
Final - Slopes Planted
Signature of Permittee
Owner or authorized a
ENVIRONMENTAL CLEAR 'CE -
Compaction Reports Read
17)
EIA Log No. j ' / ,P Private Engr. Cert. Rec'd.
By
OX. For Release
Grading permit fee $ 0 & Plan check fee $ 395, aa
Permit Issued Copies:
by White - Office; Yellow - Inspector; Pink - Permittee
Permit Expiration Date Golden Rod - Finance; Green - Building
THIS FORM WHEN PROPERLY VALIDATED IS A PERMIT TO DO THE WORK DESCRIBED
THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD OR UNTIL THE EXPIRATION DATE SPECIFIED ABOVE.
Application for Grading Permit
CITY OF CARLSBAD
ENGINEERING DEPARTMENT
1200 Elm Avenue
438-554
Building Permit Plan Check No.
FOR APPLICANT TO FILL IN
pE NO. 81-3
Validation by Finance
Department
Site Address
I'A/A-L2 'IIQA 160 tnlr,Lefr4 lzooe'
Surety Company Bond No.
i44 ,ç4J,Q7j'
n Map No. Legal D17
1-*4 'ï U.1rrJo4 2-,, IL2.'
Surety Address
Su division Name Date Filed Rec'd by
-r
Owner Phone
s.1-1v orit1
Cash deposit Rec'd by Date filed
$
Owner's Address
o4I'.4'..kr ''fr44 t7lE11c, '1-Ic'1 The following documents are required and shall become a part
of the grading permit when they are approved.
L/"Grading plans _V"Specifications
"Soil report Geologic Report
Drainage structures ______ Other
___ Compaction report
Plans by Civil Engineer f R.C.E.
Address Phone
ItOAi(r. pr 1E'.k 1
Soil Engineer R.C.E. Phone
E2J1-c' ieci (it*)iiizi K
Grading Contractor Phone SPECIAL CONDITIONS WHICH ARE MADE
A PART OF THIS PERMIT
to to V'r#, Authorized hours of operation:
7:00 AM to Sunset, Monday - Friday.
Party responsible for overall upervision
Haul routes are to be approved by City Engineer.
Ibroposed use of grade site
Adequate provisions shall be made for erosion and siltation
control. Number of cubic ya(ds
Cut C.'Y Fill C'( Import Waste \)4. All slopes shall be planted per City Code.
-- 7251occ
/5. All fills to be compacted to at least 90% of optimum a Fi ish Proposed Schedule of St t
Operations (dates) density unless noted otherwise.
I hereby acknowledge that I have read the application and state that
the information I have provided is correct and agree to comply with
all City ordinances and State laws regulating excavating and grading,
and the provisions and conditions of any permit issued pursuant to Under City Code Sec. 11.06 170 this grading is:
D REGULAR GRADING - City inspector will make inspections
this application, listed below.
Signature of Permittee ____________
0 CONTROLLED GRADING - Private grading engineer shall
observe work, coordinate tests, make reports.
Owner or authorized agent f,41'4it417 INSPECTION DATE I INSP. SIGNATURE
/ Initial - site prep.
ENVIRONMENTAL CLEARANCE -
Date _____________________
Rough. prior to drains
EIALog No. ____________
By Final . slopes planted
Compaction reports rec'd.
Grading permit fee $ Plan check fee $
Private engr. cert. rec'd. Permit Issued
by Date Copies: White-Office; Green-Building;
Permit Expiration Date Yellow-Inspector; Pink-Permittee; Goldenrod-Finance
THIS FORM WHEN PROPERLY VALIDATED ISA PERMIT TO DO THE WORK DESCRIBED
THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD
S
2075 LAS PALMAS DRIVE TELEPHONE
(619)438-1161 CARLSBAD, CALIFORNIA 92009-4859
Office of the City Engineer
(!Iit ul (1IarliUai I G I
TO: DEVELOPMENT PROCESSING SERVICES
FROM: ENGINEERING INSPECTION DIVISION
DATE: 2//7/7
33
ROUGH GRADING APPROVAL FOR PROJECT NO.
(P. E. or TRACT #)
(Project Name and 'Address)
ee,u7210E
'
/2/
(Developer'il Name and Address,
We have inspected the grading for Lot$ 3 7 ' or Phase
of the above mentioned project. In addition, we have received rough grading
certification from S JA'C, ' ., the Soils Engineer,
dated and from cy itrs
.the Supervision 'Grading Engineer, dated /2/7/?o' ' , and are satisfied
that the rough grading has, been completed in accordance with City Standards.
Based on these. certifications and our observation, we take, no exception to the
issuance of a building permit fo1 Lot ''3 7 or, Phase - of
project u1vir7r CT i%
,/P1?hf133, /r37w1-from a grading
standpoint. This release, however, is not intended to certify the project from
other engineering concerns including site development, water or sewer availa-
bility, or final grading.
We will need to be advised prior to the issuance of a Certificate of Occupancy
so that we 'can verify that final grading and landscaping has been completed
in accordance with the approved plans for the project.
APPROVED-
( Grading Inspector Sr. C strCction Inspector Project 4