Loading...
HomeMy WebLinkAboutPE 2.84.33; PALOMAR AIRPORT BUSINESS PARK UNIT 2; Engineering ApplicationVL TI Project Engineer Initial____________________________ Application for Grading Permit CITY OF CARLSBAD ENGINEERING DEPARTMENT 2075 Las Palmas Drive 438-3634 PE NO. 2'84'3 22 22z4 ,ier N co Assessors Parcel No. FOR APPLICANT TO FILL IN Address Description Map No. r 'Z42 1 Project Name ' Owner Phone 01) CR Owner's Address #2?a04g O'(Ar 4'zJ9,a Pf ne Ppaby Civil En tDA IL # Address _-.. Phone 4 2 Phone Contractor Phone 24 Hr. Address Party reponble for overall supervision Proposed use of grade site Number of cubic yards Cut Fill Import Waste Proposed Schedule of Stast Operations (dates) w I4J4/ I hereby acknowledge that I have read the application and state that the information I have provided is correct and agree to comply with all City ordinances and State laws regulating excavating and grading, and the provisions and conditions of any permit issued pursuant to this application. - FOR DE' MENT USE IN Secured Agreement Rec'd. Cash Deposit Receipt No. '77303 Drawing No. Building Permit Plancheck No. General Permit Requirements: All grading and erosion control work shall be done in accordance with City Ordinances, Authorized hours of operation: 7:00 am. to Sunset, Monday through Friday, excluding city recognized holidays. Grading work shall not commence until after the pre-construction conference has been held with the City Inspector All off-site haul routes require separate approval by the City Engineer A right-of-way permit is required for all work done in the city right-of- way.. Special Requirements: crfi-/ Under City Code Sec. 11.06.170 this grading is: D Regular Grading - City Inspector will make inspections listed below. Controlled Grading - private grading engineer shall observe work, coordinate tests and make reports Inspection Date Insp. Initial Initial - Site Prep. Rough - Grade Final - Slopes Planted Signature of Permittee Owner or authorized a ENVIRONMENTAL CLEAR 'CE - Compaction Reports Read 17) EIA Log No. j ' / ,P Private Engr. Cert. Rec'd. By OX. For Release Grading permit fee $ 0 & Plan check fee $ 395, aa Permit Issued Copies: by White - Office; Yellow - Inspector; Pink - Permittee Permit Expiration Date Golden Rod - Finance; Green - Building THIS FORM WHEN PROPERLY VALIDATED IS A PERMIT TO DO THE WORK DESCRIBED THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD OR UNTIL THE EXPIRATION DATE SPECIFIED ABOVE. Application for Grading Permit CITY OF CARLSBAD ENGINEERING DEPARTMENT 1200 Elm Avenue 438-554 Building Permit Plan Check No. FOR APPLICANT TO FILL IN pE NO. 81-3 Validation by Finance Department Site Address I'A/A-L2 'IIQA 160 tnlr,Lefr4 lzooe' Surety Company Bond No. i44 ,ç4J,Q7j' n Map No. Legal D17 1-*4 'ï U.1rrJo4 2-,, IL2.' Surety Address Su division Name Date Filed Rec'd by -r Owner Phone s.1-1v orit1 Cash deposit Rec'd by Date filed $ Owner's Address o4I'.4'..kr ''fr44 t7lE11c, '1-Ic'1 The following documents are required and shall become a part of the grading permit when they are approved. L/"Grading plans _V"Specifications "Soil report Geologic Report Drainage structures ______ Other ___ Compaction report Plans by Civil Engineer f R.C.E. Address Phone ItOAi(r. pr 1E'.k 1 Soil Engineer R.C.E. Phone E2J1-c' ieci (it*)iiizi K Grading Contractor Phone SPECIAL CONDITIONS WHICH ARE MADE A PART OF THIS PERMIT to to V'r#, Authorized hours of operation: 7:00 AM to Sunset, Monday - Friday. Party responsible for overall upervision Haul routes are to be approved by City Engineer. Ibroposed use of grade site Adequate provisions shall be made for erosion and siltation control. Number of cubic ya(ds Cut C.'Y Fill C'( Import Waste \)4. All slopes shall be planted per City Code. -- 7251occ /5. All fills to be compacted to at least 90% of optimum a Fi ish Proposed Schedule of St t Operations (dates) density unless noted otherwise. I hereby acknowledge that I have read the application and state that the information I have provided is correct and agree to comply with all City ordinances and State laws regulating excavating and grading, and the provisions and conditions of any permit issued pursuant to Under City Code Sec. 11.06 170 this grading is: D REGULAR GRADING - City inspector will make inspections this application, listed below. Signature of Permittee ____________ 0 CONTROLLED GRADING - Private grading engineer shall observe work, coordinate tests, make reports. Owner or authorized agent f,41'4it417 INSPECTION DATE I INSP. SIGNATURE / Initial - site prep. ENVIRONMENTAL CLEARANCE - Date _____________________ Rough. prior to drains EIALog No. ____________ By Final . slopes planted Compaction reports rec'd. Grading permit fee $ Plan check fee $ Private engr. cert. rec'd. Permit Issued by Date Copies: White-Office; Green-Building; Permit Expiration Date Yellow-Inspector; Pink-Permittee; Goldenrod-Finance THIS FORM WHEN PROPERLY VALIDATED ISA PERMIT TO DO THE WORK DESCRIBED THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD S 2075 LAS PALMAS DRIVE TELEPHONE (619)438-1161 CARLSBAD, CALIFORNIA 92009-4859 Office of the City Engineer (!Iit ul (1IarliUai I G I TO: DEVELOPMENT PROCESSING SERVICES FROM: ENGINEERING INSPECTION DIVISION DATE: 2//7/7 33 ROUGH GRADING APPROVAL FOR PROJECT NO. (P. E. or TRACT #) (Project Name and 'Address) ee,u7210E ' /2/ (Developer'il Name and Address, We have inspected the grading for Lot$ 3 7 ' or Phase of the above mentioned project. In addition, we have received rough grading certification from S JA'C, ' ., the Soils Engineer, dated and from cy itrs .the Supervision 'Grading Engineer, dated /2/7/?o' ' , and are satisfied that the rough grading has, been completed in accordance with City Standards. Based on these. certifications and our observation, we take, no exception to the issuance of a building permit fo1 Lot ''3 7 or, Phase - of project u1vir7r CT i% ,/P1?hf133, /r37w1-from a grading standpoint. This release, however, is not intended to certify the project from other engineering concerns including site development, water or sewer availa- bility, or final grading. We will need to be advised prior to the issuance of a Certificate of Occupancy so that we 'can verify that final grading and landscaping has been completed in accordance with the approved plans for the project. APPROVED- ( Grading Inspector Sr. C strCction Inspector Project 4