Loading...
HomeMy WebLinkAboutPE 2.84.50; LA COSTA SOUTH UNIT 4 LOTS 260 & 261; Engineering ApplicationApplication,for Grading Permit CITY OF CARLSBAD ENGINEERING DEPARTMENT 456~- Zt3z4t-: 1200 Elm Avenue 438-5541 Building Permit Plan Check No. PE NO.Z. 93.50 Validation by Finance Department h , Ilya W1Q1 ! F IT gi H . ~00 PIC R APPLIL CANT'TO FILL IN~ Site Address o?7/ 6 S Company Bond N Legal Description Map No. t64 e La el 44 Z-4 Surety Address Subdivision Name Date, Filed Owner Zzit: -n~o 41 wl,&'044 PhoneV 1.~Ot a e/ s~WW'llAt- ykg Cas osit Rec'd by Date filed . I - Owner's Address "W4 If.6- 47~0i V,0 04 YA44 e-4 A /The following documents ate required and shall become a 'part of the grading permit when they are approved. Grading plans Specif ications Sol epo~t__ _47 Geologic Report lJ_rW~_nadC_stFujctures Other Compaction report Plans by Civil 07gineer- 'RAIE. Ru - Ts,,^f Cy CE .2 S"08& Address Phone -7430 Soil Engineer R.C.E. Phone Grading Contrac or Phone J~bc-6 44(c_—Z-~_3 / '--____&_ECL&L-GeNVTr_10_NS WHICH ARE MADE A PART OF THIS PERMIT Address -a 93 cky~& ITVP"~d 1 Authorized hours of operation: 7:00 AM to Sunset, Monday - Friday. - Party respon ibi for o rail supervi o If ad - ~~ . Haul routes are'to be approved by City Engineer. ropos?4 use of grade sit6l a Adequate provisions shall be made for erosion and siltation con I trol. Nurnber,of,&biCyaffis Cut Fill Import Waste 1* All slopes shall be planted per City Code. (_30 43 ( Z -7-20 Proposed Schedule of Start Finish Operations (dates) 5. All fills to be compacted toat least 90% of optimum density unless noted otherwise. I hereby acknowledge that I have read the application and state that. the information I hive pr6y.ided'is correct and agreeto comply with all City ordinances and State laws regulating excavating and grading, and the provisions and conditions of any permit issued pursuant to this application. Signature of Permittee Owner or authorized agen Under City Code Sec. 11.06 170 this grading is: 71;EGULAR GRADING - City inspector will make inspections listed below. 0 CONTROLLED GRADING - Private grading engineer shall observe work, coordinate tests, make, reports. INSPECTION DATE INSP. SIGNATURE Initial - site prep. ENVIRONMENTAL CLEARANCE - Date EIA Log No. By Rough - prior to drains Final -slopes planted Compaction reports rec'd. Grading permit fee $ Plan check fee, $ TO Private engr. cert. rec'd. Per ued MiAs 7 ~_ Dy LjaTe re / 1 1 a Copies: White-Office; Green-Building; 6go 44 Permit Expiration Date .-e-- Yellow-inspector; Pink-Permittee; Goldenrod-Finance THIS FOR, M WHEN PROPERLY VALIDATED IS A PERMIT TO DO THE WORK DESCRIBED THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD