HomeMy WebLinkAboutPE 2.84.70; BROOKS WORTHINGTON; Engineering ApplicationIvo, 2-4 7 - 8
Building Permit Plan Check No
Application for Grading Permit
CITY OF CARLSBAD
ENGINEERING DEPARTMENT
1200 Elm Avenue
436-5541
PE NO. '~2' 84' 70
vanuation E)y rinaricu
Department
/'24-/db~§?7. .
Legal Description M No Surety Address Is 2 -t 5 egwa Ir Subdivision Name Date Ried Rec'd by
Owner Phone ignt-t-depol-I
I
Rec'd by Date filed $ I&C
Owner's.Address The following dotuments are required and shall become a part
24-7 icluwkxcr Ave- "b4 of the. grading permit when they are approved.
Plans bv Civil EngineVr R.C.E. a Grading pl ns — Specifications SIA ISen I--,'
Address Phone Soil report — Geologic Report
t5ea_ Drairfage structures — Other ~ZL dE~~ 77— Compaction report
1. Autnorizea nours OT operaiion:
7:00 AM to Sunset.,Mondav~ - Friday.
Proposed use of grade
Numberof cubic yards
Cut Fill Import Waste
1~0 Is60 m
Proposed Sch
-
edule of Start Finish
Operations (dates)
Haul routes are to be approved by City Engineer.
Adequate provisions Shall be macle Tor erosion ancl siltation
-nt-1 .
— —1. -V- -- — F--- F— -.y
-1 111- — — — — I-- -U W1 WFL111-111
riancitw i—lace nntad nthar—iC0
I hereby acknowledge that I have read the application and,state that
the information I have provided is correct and agree~to comply with
all City ordinances and State laws regulating excavating and gradingi
and t I h
.
e provisions and:conditions of any per m- i Under City Code Sec. 11,.0.6 170 this grading is, 1~4~ed pursuant to 0 REGULAR GRADING - City ~inspector will make inspections
this application. pited below.
ECONTROLLED GRADING - Private grading engineer shall
Signature of Permittee observe work, coordinate tests, make reports.
INSPECTION DATE INSP. SIGNATURE
Owner or authorized agent
Initial - site prep."
ENVIRONMENTAL CLEARANCE -
Date Rough - prior to cl~ains 2
E I A'Log No. Final - slopes planted VaoSua: f~r~ An
Grading Plan check fee $ Compaction reports rec'd. '71,~
Permit 'Private engr. cert. rec'd.
by Date N Copies~ White-Office; Green-Building;
Permit Expiration Date F/It- Yellow-inspector; Pink-Permittee; Goldenrod- Finance i V_ -
I
THIS FORMWHEN PROPERLY VALIDATED ISAPERMITTO DOTHEWORK DESCRIBED
THIS PERMIT IS VALID FOR A'SIX (6) MONTH PERIOD