Loading...
HomeMy WebLinkAboutPE 2.84.90; CALAVERA HILLS R.V. PARKING AND STORAGE; Engineering Application0 Application for Grading Permit 41 CITY OF CARLSBAD ENGINEERING DEPARTMENT 1200 Elm Avenue 438.5541 PE NO. Validation by Finance 3b&afêi33 , a 03 371 Building Permit Plan Check No FOR APPLICANT TO FILL IN Site Address 74*Z 4Ø gaeT,fop e4 e.Mas i%₮i Surety Company Bond No. ,4,,4'iCAAI Z6AA'cE — 4 q q Legal Description Map No. /b/27/1AJ or3 c ffz4Nc1,o 4o4 110/0A/D4 0753 Surety Address Subdivision Name rr-41rnmi 17t4c7' m,p G ,41/14L5 Lo 1— Date Filed Rec'd by Owner Phone *IbUT tY- 3c-9/& Cash d posit Rec'd by Date filed $ Nf owo i s o¼ Owner's Address O,T6: The following documents are required and shall become a part ing permit when they are approved. plans . Specifications Kilreport Geologic Report _,- Drainage structures ___ Other " Compaction report V Ins by Civil Engineer R.C.E.ading A ress Phone dd ,.)c"r 5i41 45 Soil Engineer R.C.E. Phone vp1&2./ C-. 11STiA/ 3(cO7 280 432I GradinContractor c- Phone & /O/f7f1 . SPECIAL CONDITIONS WHICH ARE MADE A PART OF THIS PERMIT Address ______ tivn-14~bnt -W z~/. _0 P`7 ______ Authorized hours of operation: 7:00 AM to Sunset, Monday - Friday. Party responsible for overall supervision 5CAIE Haul routes are to be approved by City Engineer. Proposed use of grade site 1/6-14'/CL Adequate provisions shall be made for erosion and siltation control. Number of cubic yards COMO Cut Fill Import Waste All slopes shall be planted per City Code. /97ôO /87w " All fills to be compacted to at least 90% of optimum density unless noted otherwise. Proposed Schedule of Start Finish Operations (dates) i~/,$ ._..4zY 7/ I hereby acknowledge that I have read the application and state that the information I have provided is correct and agree to comply with - V all ity oroinances and atate laws regulating excavating and graulny, Under City Code Sec. 11.06 170 this grading is: and the provisions and conditions of any permit issued pursuant to E REGJJLAR GRADING - City inspector will make inspections this application. li.std below. ONTROLLED GRADING - Private grading engineer shall Signature of Permittee /(1..0 observe work, coordinate tests, make reports. Owner or authorized agent PIO INSPECTION DATE I INSP SIGNATURE Initial - site prep. _______________________ _________ ,j21 Date _______________________ ENVIRONMENTAL CLEARANCE - Rough - prior to drains 3-13 5' EIA Log No. ___________ Final- slopes planted v 06 By Grading permit fee $ '7n Q_2... Plan check fee $ Compaction reports rec'd. by Perm /Expi ration Private engr. cert. rec'd. V — Date Copies: White-Office; Green-Building; 86. I 6 il et Yellow-Inspector; Pink-Permittee; Goldenrod-FinanQe t, THIS FORM WHEN PROPERLY VALIDATED IS PERMIT TO DO THE WORK DESCRIBED THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD