HomeMy WebLinkAboutPE 2.85.26; LA COSTA HOTEL EXPANSION; Engineering Application4 pwci z67ø Application for Grading Permit 0
CITY OF CARLSBAD
ENGINEERING DEPARTMENT
1200 Elm Avenue
438-5541
PE NO. 2.85.26
19OU MP 0P**6;4.r3mT.(W TT.7, M9 T59.O 9L I
Building Permit Plan Check No.
FOR APPI WANT TO i:ii I IN
Site Address
2100 Costa fl1 Mr CA 92008 ,Crb1
Surety Company Bond No. _A9A- 7
Legal Description Map No.
Ass. Prce1 No- 716-123-03,04,05
Surety Address
Subdivision Name
T. Costa lintel and Spa
Date Filed Rec'd by
Owner Phone
Pn,1 Grham-Arjent 436-4252 ___________________________________________________________
Cash deposit Rec'd by Date filed
$
Owner's Address
7602 El Camino Real, Suite 210
The following documents are required and shall become a part
of the grading permit when they are approved.
XX Grading plans Specifications
XX Soil report Geologic Report
Drainage structures ____ Other
Compaction report
Plans by Civil Engineer R.C.E.
Robert A. Stockton 33591
Address Phone
3088 Pio Pico, Carlsbad,CA.,92008 ,729-4987
Soil Engineer R.C.E. Phone
Dan Eberhart 438-941.6
Grading Contractor Phone
Marnell Carrao Construdtion 438-8044
SPECIAL CONDITIONS WHICH ARE MADE
APART OF THIS PERMIT
Address
2001 Arenal Road, Carlsbad 92008
Authorized hours of operation:
7:00 AM to Sunset, Monday - Friday.
Party responsible for overall supervision
Jerry Dunaway Haul routes are to be approved by City Engineer.
Proposed use of grade site
Hotel Adequate provisions shall be made for erosion and siltation
control. Number of cubic yards
Cut Fill Import Waste All slopes shall be planted per City Code.
28,300 1 21,-700 '1 1 6,600
All fills to be compacted to at least 90% of optimum
density unless noted otherwise.
Proposed Schedule of Start Finish
Operations (dates) 7/1/8 5 12/1/85
I hereby acknowledge that I have read the application and state that
the information I have provided is correct and agree to comply with
all City ordinances and State laws regulating excavating and grading,
and the provisions and conditions of any permit issued pursuant to
this application,
Signature of Permittee D.
Owner or authorized agent Aci
Under City Code Sec. 11.06 170 this grading is:
LI REGULAR GRADING - City inspector will make inspections
listed below.
LI CONTROLLED GRADING - Private grading engineer shall
observe work, coordinate tests, make reports.
INSPECTION DATE . INSP. SIGNATURE
Initial - site prep.
ENVIRONMENTAL CLEARANCE -
Date t0 .
EIALogNo. Cu? '2E16
By
Rough - prior to drains
Final - slopes planted
Compaction reports rec'd. ' Grading permit fee $ /'.- Plan check fee $
Private engr. cert. rec'd. Permit Issed . - -
/i/.(
by 1— ___________________ ___________________ Date fdIF Copies: White-Office; Green-Building;
Permit Expiration Da( if Yellow-Inspector; Pink-Permittee; Goldenrod-Finance
THIS FORM WHEN PROPERLY VALIDATED IS A PERMIT TO DO THE WORK DESCRIBED
THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD
SUBDIVISION LOG
SUBDIVISION NO. DATE RECeWNED
OWNER % e ,'/ ENGINEER ,2'.
ADDRESS Zroo CoVq 04L , . ADDRESS e-
PHONE PHONE 7,19- J/797
TENTATIVE _PARCEL MAP SENT LETTERS
DATE PRELIM. DUE
PLANNING 0 FIRE 0 0 PRELIM. SENT
UTIL/MAINT. 0 CRMWD 0 0 FINAL DUE
PARKS 0 LCWD 0 FINAL SENT
REQUIREMENTS:
PLANNING REPORT FOR ___DATE TO DCC
DATE TO P.C. ACTION: 0 APPROVED 0 DENIED
DATE TO C.C. ACTION: 0 APPROVED 0 DENIED
O STREET DEDICATION DEED NO. RECORDED_____________________
O FUTURE IMPROVEMENT AGREEMENT. TO C.C.________________ 0 APPROVED
DOTHER
C.C. CONDITIONS:
TENATIVE PARCEL MAP
PRELIMINARY TITLE REPORT
GRADING PLAN
PUBLIC FACILITIES FEE AGREEMENT
EIGHT COPIES OF TENTATIVE PARCEL MAP
300' RADIUS MAP
PROPERTY OWNER'S LIST & ENVELOPES
ENVIRONMENTAL IMPACT ASSESSMENT
SCHOOL AND SEWER LETTER
TIME EXTENSION AGREEMENT'
1ST CHECK IN OUT_________
2ND CHECK IN OUT_________
3RD CHECK IN_________ OUT_________
APPROVED
FINALORPARCEL _MAP
1st Check IN OUT
2nd Check IN .
OUT_____
3rd Check IN .
OUT_____
'SIGNED BY C.E.
TO CITY CLERK
RECORDED
COPIES RECEIVED________________________________
BONDS
ENGINEER'S ESTIMATE $
GRADING & EROSION
MONUMENTATION
MATERIALS & LABOR
IMPROVEMENT AGREEMENT
FAITHFUL PERFORMANCE
AMOUNT II!
.0
0
0
0
0
0
BONDING CO.
ADDRESS
REPORTS
REQUIRED
TITLE REPORT 0
SUBDIVISION GUARANTEE 0
SOILS REPORT 0
ENGINEER'S ESTIMATE
TRAVERSE CALC. . 0
11
13 0
IMPROVEMENTPLANS
PROJECT NO. DRAWING NO.__________
1st Check IN OUT_____
2nd Check IN OUT_____
3rd Check IN OUT_____
SIGNED BY C.E.______________________________
SIGNED "AS-BUILT"____________________________
GRADING PLAWS 0ii&tJ$77
GRADING PERMIT NO.
1st Check IN _____ OUT
2nd Check IN
OUT_____
3rd Check
IN_____ OUT _____
SIGNED BY C.E.______
PERMIT iSSUED
DEPOSITSREQUIRED
ITEM AMOUNT PAID
TENT. EXAM FEE
PARKS-IN-LIEU FEE ' .
GRADING PERMIT FEE
o
o
FINAL MAP, FEE 13
IMP. PLAN CHECK FEE . . 0
' INSPECTION FEE' o
WATER CONNECTION DEPOSIT El
STREET SIGN DEPOSIT ' 0
STREET TREE DEPOSIT 0
GRADING PLAN CHECK FEE o
STREET LIGHT ENERGY FEE . o
DUPLICATE TRACING FEE 0
DRAINAGE AREA FEE ________
El
REVISED PLAN CHECK FEE 0
TOTAL DEPOSITS
COMMENTS OR PROBLEMS '
IN
0
1J
tJ
0
El