Loading...
HomeMy WebLinkAboutPE 2.85.26; LA COSTA HOTEL EXPANSION; Engineering Application4 pwci z67ø Application for Grading Permit 0 CITY OF CARLSBAD ENGINEERING DEPARTMENT 1200 Elm Avenue 438-5541 PE NO. 2.85.26 19OU MP 0P**6;4.r3mT.(W TT.7, M9 T59.O 9L I Building Permit Plan Check No. FOR APPI WANT TO i:ii I IN Site Address 2100 Costa fl1 Mr CA 92008 ,Crb1 Surety Company Bond No. _A9A- 7 Legal Description Map No. Ass. Prce1 No- 716-123-03,04,05 Surety Address Subdivision Name T. Costa lintel and Spa Date Filed Rec'd by Owner Phone Pn,1 Grham-Arjent 436-4252 ___________________________________________________________ Cash deposit Rec'd by Date filed $ Owner's Address 7602 El Camino Real, Suite 210 The following documents are required and shall become a part of the grading permit when they are approved. XX Grading plans Specifications XX Soil report Geologic Report Drainage structures ____ Other Compaction report Plans by Civil Engineer R.C.E. Robert A. Stockton 33591 Address Phone 3088 Pio Pico, Carlsbad,CA.,92008 ,729-4987 Soil Engineer R.C.E. Phone Dan Eberhart 438-941.6 Grading Contractor Phone Marnell Carrao Construdtion 438-8044 SPECIAL CONDITIONS WHICH ARE MADE APART OF THIS PERMIT Address 2001 Arenal Road, Carlsbad 92008 Authorized hours of operation: 7:00 AM to Sunset, Monday - Friday. Party responsible for overall supervision Jerry Dunaway Haul routes are to be approved by City Engineer. Proposed use of grade site Hotel Adequate provisions shall be made for erosion and siltation control. Number of cubic yards Cut Fill Import Waste All slopes shall be planted per City Code. 28,300 1 21,-700 '1 1 6,600 All fills to be compacted to at least 90% of optimum density unless noted otherwise. Proposed Schedule of Start Finish Operations (dates) 7/1/8 5 12/1/85 I hereby acknowledge that I have read the application and state that the information I have provided is correct and agree to comply with all City ordinances and State laws regulating excavating and grading, and the provisions and conditions of any permit issued pursuant to this application, Signature of Permittee D. Owner or authorized agent Aci Under City Code Sec. 11.06 170 this grading is: LI REGULAR GRADING - City inspector will make inspections listed below. LI CONTROLLED GRADING - Private grading engineer shall observe work, coordinate tests, make reports. INSPECTION DATE . INSP. SIGNATURE Initial - site prep. ENVIRONMENTAL CLEARANCE - Date t0 . EIALogNo. Cu? '2E16 By Rough - prior to drains Final - slopes planted Compaction reports rec'd. ' Grading permit fee $ /'.- Plan check fee $ Private engr. cert. rec'd. Permit Issed . - - /i/.( by 1— ___________________ ___________________ Date fdIF Copies: White-Office; Green-Building; Permit Expiration Da( if Yellow-Inspector; Pink-Permittee; Goldenrod-Finance THIS FORM WHEN PROPERLY VALIDATED IS A PERMIT TO DO THE WORK DESCRIBED THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD SUBDIVISION LOG SUBDIVISION NO. DATE RECeWNED OWNER % e ,'/ ENGINEER ,2'. ADDRESS Zroo CoVq 04L , . ADDRESS e- PHONE PHONE 7,19- J/797 TENTATIVE _PARCEL MAP SENT LETTERS DATE PRELIM. DUE PLANNING 0 FIRE 0 0 PRELIM. SENT UTIL/MAINT. 0 CRMWD 0 0 FINAL DUE PARKS 0 LCWD 0 FINAL SENT REQUIREMENTS: PLANNING REPORT FOR ___DATE TO DCC DATE TO P.C. ACTION: 0 APPROVED 0 DENIED DATE TO C.C. ACTION: 0 APPROVED 0 DENIED O STREET DEDICATION DEED NO. RECORDED_____________________ O FUTURE IMPROVEMENT AGREEMENT. TO C.C.________________ 0 APPROVED DOTHER C.C. CONDITIONS: TENATIVE PARCEL MAP PRELIMINARY TITLE REPORT GRADING PLAN PUBLIC FACILITIES FEE AGREEMENT EIGHT COPIES OF TENTATIVE PARCEL MAP 300' RADIUS MAP PROPERTY OWNER'S LIST & ENVELOPES ENVIRONMENTAL IMPACT ASSESSMENT SCHOOL AND SEWER LETTER TIME EXTENSION AGREEMENT' 1ST CHECK IN OUT_________ 2ND CHECK IN OUT_________ 3RD CHECK IN_________ OUT_________ APPROVED FINALORPARCEL _MAP 1st Check IN OUT 2nd Check IN . OUT_____ 3rd Check IN . OUT_____ 'SIGNED BY C.E. TO CITY CLERK RECORDED COPIES RECEIVED________________________________ BONDS ENGINEER'S ESTIMATE $ GRADING & EROSION MONUMENTATION MATERIALS & LABOR IMPROVEMENT AGREEMENT FAITHFUL PERFORMANCE AMOUNT II! .0 0 0 0 0 0 BONDING CO. ADDRESS REPORTS REQUIRED TITLE REPORT 0 SUBDIVISION GUARANTEE 0 SOILS REPORT 0 ENGINEER'S ESTIMATE TRAVERSE CALC. . 0 11 13 0 IMPROVEMENTPLANS PROJECT NO. DRAWING NO.__________ 1st Check IN OUT_____ 2nd Check IN OUT_____ 3rd Check IN OUT_____ SIGNED BY C.E.______________________________ SIGNED "AS-BUILT"____________________________ GRADING PLAWS 0ii&tJ$77 GRADING PERMIT NO. 1st Check IN _____ OUT 2nd Check IN OUT_____ 3rd Check IN_____ OUT _____ SIGNED BY C.E.______ PERMIT iSSUED DEPOSITSREQUIRED ITEM AMOUNT PAID TENT. EXAM FEE PARKS-IN-LIEU FEE ' . GRADING PERMIT FEE o o FINAL MAP, FEE 13 IMP. PLAN CHECK FEE . . 0 ' INSPECTION FEE' o WATER CONNECTION DEPOSIT El STREET SIGN DEPOSIT ' 0 STREET TREE DEPOSIT 0 GRADING PLAN CHECK FEE o STREET LIGHT ENERGY FEE . o DUPLICATE TRACING FEE 0 DRAINAGE AREA FEE ________ El REVISED PLAN CHECK FEE 0 TOTAL DEPOSITS COMMENTS OR PROBLEMS ' IN 0 1J tJ 0 El