HomeMy WebLinkAboutPE 2.86.22; PANNONIA; Engineering ApplicationApplication for Grading Permit
;70-. CITY OF CARLSBAD.
ENGINEERING DEPARTMENT
1200 Elm Avenue
438-&G44 b
Building Permit Plan Check No. ________________
I
PE NO.
Validation by Finance
Department
FOR APPLICANT TO FILL IN
Site Address
85-18 'iri
Surety Company Bond No.
Amer Motorists Ins Co 35m-690-483 00
Legal Description Map No. . Surety Address
2900 W. Broadway Los. Angeles 90041
Subdivision Name
Pannonia
Date Filed Rec'd by
7-16-86 Dave Houser
Owner . Phone
Skyline Estates, Inc. 729-7118
Cash deposit Rec'd by Date filed
.$ 20,000.00 Dave Houser 7-16-86
Owner's Address .
580-A Beech Ave Carlsbad
The following documents are required and shall become a part
of the grading permit when they ved.
L. rading plans :7Specif
____c' report Geologic Report
Drainage structures ______ Other
Compaction report
IGC 3UU.uu
Plans by Civil Engineer R.C.E.
O'Day & Associates
Address Phone
7750 El Camino. Real 944-1010
Soil Engineer R.C.E. Phone
Geotechnical Explorations
Grading Contractor Phone
Pahia Corporation . 292-1390
SPECIAL CONDITIONS WHICH ARE MADE
A PART OF THIS PERMIT
Address . . .
680 Convoy, San Diego, CA
CHEK 3UUUU Authorized hours of operation:
7:00 AM to Sunset, Monday - Friday.
Party responsible for overall supervision
Norguist Development
.
Haul routes are to be approved by City Engineer.
Proposed use of grade site
67 SFD . . Adequate provisions shall be made for erosion and siltation
control. Number of cubic yards .
Cut 92,800Fill139,4001mp0rt46,600 Waste All slopes shall be planted per City Code.
All fills to be compacted to at least 90% of optimum
density unless noted otherwise.
Proposed Schedule of Start Finish
Operations (dates) 9-2-86 10-10-86
I hereby acknowledge that I have read the application and state that
the information I have provided is correct and agree to comply with
all City ordinances and State laws regulating excavating and grading,
and the provisions and conditions of any permit issued pursuant to
this application.
Signature of Permittee
Owner or authorized agent
Under City Code Sec. 11.06 170 this grading is: - -.
U REGULAR GRADING - City inspector will make inspections
listed below.
,CONTROLLED GRADING - Private grading engineer shall
observe work, coordinate tests, make reports.
INSPECTION DATE INSP. SIGNATURE
Initial - site prep.
ENVIRONMENTAL CLEARANCE
- Date j I 1 6 __________________
EIA Log No. C-r 85-1 E5
By ____________________
*9—"t Rough - prior to drains / —I—. /
Final . slopes planted
Compaction reports rec'd.
,, 7/1/7 Grading permit fee $ Plan check fee $ fr
Private engr. cert. rec'd.
Permit Issued -
by Date '142 Copies: White-Office; reen-Building
Permit Expiration Date 3' Yellow-Inspector; Pink-Permittee; Goldenrod-Finance
THIS FORM WHEN PROPERLY VALIDATED IS PERMIT TO DO THE WORK DESCRIBED
THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD
1200 ELM AVENUE
CARLSBAD, CA 92008-1989.
Office of the City Engineer
o C4-
-, *.
'Foc"
TELEPHONE
(619) 438-5541
TO: BUILDING DEPARTMENT
FROM: ENGINEERING DEPARTMENT •..
DATE:
ROUGH GRADING APPROVAL FORPROJECT NO.
(TRACT or P.E. #)
JAJtM//4 - - ck,v /iU
(PROJECT NAME ANDADDRESS)
(DEVELOPER'S NAME AND ADDRESS)
We have inspected the grading for lots 37 or phase
of the above mentioned project. In addition, we have.received 'rough
grading certification from. the Soils
Engineer, dated f—/f-7_, and from Z~4W EX
the Supervising Grading Engineer, dated f—/cP—f7 , and are, satis-
fied that the rough grading has been completed in accordance with City
standards.
Based on these certifications and our observation, we take no exception to
the issuance of a building permit for lots 7-çf or phase
of project e r f-/ IF J —2---- • from a grading
standpoint. This release, however, is not intended to. certify the project
from other engineering concerns-including site development, water or sewer
availability', or final grading. • .
Prior to the issuance of a certificate of occupancy, we need to be advised
so that we can verify that final grading and landscaping has been complet-
ed in accordance with the approved 'plans for the project.
APPROVED: . C*
13 7/
Project Grading Inspector , 0C4V2VZruction Inspector
cc: Developer
. --
1200 ELM AVENUE
CARLSBAD, CA 92008-1989
Office of the City Engineer
City at Cartbab
TO: BUILDING DEPARTMENT
FROM: ENGINEERING DEPARTMENT
DATE:
TELEPHONE
(619) 438-5541
ROUGHGRADING APPROVAL FOR PROJECT NO.
(TRACT or P.E. #)
/4VA.J6'1C//i4 - Ev
(PROJECT NAME NAME AND ADDRESS)
4'/?L r
(DEVELOPERS NAME AND ADDRESS)
We have inspected the grading for lots/—j77-Vd1 rs 0 0or phase
of the above mentioned project. In addition, we have received rough
?grading certification from
, the Soils
Engineer, dated /2-?-1 , and from r,JL7-AJrc
the Supervising Grading Engineer, dated /2—-2 , and are satis-
fied that the rough grading has been completed in accordance with City
standards.
Based on these certifications and our observation, we take no exception to
the issuanceof a building permit for lots ç2- or phase
of project from a grading
standpoint. This release, however, is not intended to certify the project
from other engineering concerns including sitedevelopment, water or sewer
availability, or final grading.
Prior to the issuance of a certificate of occupancy, we need to be advi
s
e
d
so that we can verify that final grading and landscaping has been complet
-
ed in accordance with the approved plans for the project
/ -I 3 • S
APPROVED: S
S / _-•2_--___) ,
roject Grading Inspector Sr. Construc4'n inctor
cc: Developer
1200 ELM AVENUE TELEPHONE CARLSBAD, CA 92008•1989 (619) 438•5541
Office of the City Engineer •.
Citp at Qtartbab
TO: BUILDING DEPARTMENT
FROM: ENGINEERING DEPARTMENT
DATE: / -/ -i
ROUGH GRADING APPROVAL FOR PROJECT NO. c 7 ff-7i
(TRACT or P.E. #)
(PROJECT NAME AND ADDRESS)
(DEVELOPER'S NAME NAME AND ADDRESS)
We have inspected the grading for 1otsJ2_maJ -*9, 1or phase
of the above mentioned project. In addition, we have received rough
grading certification , the Soils
Engineer, dated/.-?%-?, and from 4c'c
the Supervising Grading Engineer, dated /'.-'.-7 , and are satis-
fied that the rough grading has been completed in accordance with City
standards.
Based on these certifications and our observation, we take no exception to
the issuance of a building permit for phase
of project from a grading
standpoint. This release, however, is not intended to certify the project
from other engineering concerns including site development, water or sewer
availability, or final grading.
Prior to the issuance of a certificate of occupancy, we need to be advised
so that we can verify that final grading and landscaping has been complet-
ed in accordance with the approved plans for the project.
APPROVED
/ Project Grading Inspector /Sr. Construc n Inspector
cc:- Developer