Building Permit Plan Check No. 86-324 II
Application for Grading Permit PE NO. 2. 86.47 A *
CITY OF CARLSBAD PEi77
ENGINEERING DEPARTMENTPXO // / 7 1200 Elm Avenue Validation by Finance 438-544.. S Department
FOR APPLICANT TO FILL IN
Site Address Surety Company Bond No.
RUTHERFORD ROAD Aetna Casualty S100277557
Legal Description Map No. Surety Address
212-067-26 . $54,212
Subdivision Name Date Filed Rec'd by
Carlsbad Research Center, Lot 9 g OUNt F4frfppJJ7 #O/29/ £tV
Owner Phone Cash deposit Rec'd by Date filed
Cardon Meadows Development Co. 587-0073 $5,000 ck. 1/23/87
Owner's Address The following documents are required and shall become a part
9339 Genesee, #250, San Diego, CA 92121 of the grading permit when they are approved.
Plans by Civil Engineer R.C.E. X Grading plans x Specifications Rick Engineering, RCE #23874, 744-4800 X Soil report Geologic Report Address Phone X Drainage structures ______ Other 365 S. Rancho Santa Fe Rd., #100, San Marcos X Compaction report Soil Engineer R.C.E.28110 Phone 587-0250
San Diego Geotechnical Consultants
Grading Contractor Phone SPECIAL CONDITIONS WHICH ARE MADE
Brown—Pardee—Haney, Lic. #458030 I A PART OF THIS PERMIT
Address 1. Authorized hours of operation:
9434 Chesapeak Dr., #1206, San Diego 7:00 AM to Sunset, Monday - Friday.
Party responsible for overall supervision
Cardon Meadows Development Co. 282930
2. Haul routes are to be approved by City Engineer. Proposed use of grade site lot
Office Bldgs. (3) A Adequate provisions shall be made for erosion and siltation Number of cubic yards control. tl Cut Fill Import
03
6,000 6,000
/
All slopes shall be planted per City Code.
Proposed Schedule of Start 1<. Finish X5. All fills to be compacted to at least 90% of optimum
Operations (dates) '9Lst1,Lci.1 density unless noted otherwise.
I hereby acknowledge that I have read the application and state that
the information I have provided is correct and agree to comply with
all City ordinances and State laws regulating excavating and grading, Under City Code Sec. 11.06 170 this grading is: and the provisions and conditions of any permit issued pursuant to LI REGULAR GRADING - City inspector will make inspections
this application. listed below.
CONTROLLED GRADING - Private grading engineer shall
Signature of Permittee ~~Z_ observe work, coordinate tests, make reports.
INSPECTION DATE INSP. SIGNATURE
Owner or authorized agent
Initial - site prep.
ENVIRONMENTAL CLEARANCE -
Date 12/17/79 Rough - prior to drains
ElA Log No. PE 2.86.47 Final slopes planted
By Seeman & Asso.
Compaction reports rec'd Grading permit fee $ 245 Do Plan check fee $
Permi Is
Private engr. cert. rec'd.
by
1 j,/2,1/g7P
Copies:Aite; Green-Building;
,Perjni piration Date 4 / / ( ector; Pink-Permittee; Goldenrod-Finance
Z 1gb THIS FORM WHEN PROPELYVAIIDAT/D IS EWORK DESCRIBED
THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD
Application for Grading PermiØ PE NO.
CITY OF CARLSBAD
ENGINEERING DEPARTMENT
1200 Elm Avenue I i... VdIIUdLIUIt U'j IlIIIu(.. 2fZ7j'7 438
___
Building Permit Plan Check No.
Department
FOR APPLICANT TO FILL IN
Site Address
y._ yaws y. 1p -
Surety Company Bond No.
A $ /06 -4 71 5 7
Legal Description Map No. 12-1 a 6)(P-1 - 24, Surety Address
. 2-
/
Subdivision Name ,ate Filed Rec'd by
KE.FUNDA-u'nteUaL ,e'izWe w
Owner Phone
G-J DEV . (13. W1-eo7 Cash deposit Rec'd by Date filed
$ 5Q00
Owner's Address
faoo
9'2.l !L1
c:1 (j P '9+4 t)I,CA The fllowing documents are required and shall become a part
of the grading permit when they are proved.
Grading plans Specifications
Soil report Geologic Report
, / Drainage structures _____ Other
"V Compaction report
Plans by Civil Engineer CE-t.137 R.C.E
Address Phon
zAuioflo 9,AJJTA 124 14 f4A
Soil Engineer R.C.EZI! Phone
kz.
Grading Contractor Phone
-)PAiW--I+As-)W "It A 45P23,6
SPECIAL CONDITIONS WHICH ARE MADE
APART OF THIS PERMIT
AAdress ?4 -/1_5A Z- !7_6 .D 3 Authorized hours of operation:
7:00 AM to Sunset, Monday - Friday.
Party responsible for overall supervision
&P4*J '4S'it9UG Haul routes are to be approved by City Engineer.
Proposed use of grade site
Oppic'L-A. Adequate provisions shall be made for erosion and siltation
control. Number of cubic yards
Cut Fill Import Waste All slopes shall be planted per City Code.
All fills to be compacted to at least 90% of optimum
density unless noted otherwise.
Proposed Schedule of Start Finish
Operations (dates)
I hereby acknowledge that I have read the application and state that
the information I have provided is correct and agree to comply with
all City ordinances and State laws regulating excavating and grading,
and the provisions and conditions of any permit issued pursuant to
this application,
Signature of Permittee
f
\Owner or authorized
Under City Code Sec. 11.06 170 this grading is: -
0 REGULAR GRADING - City inspector will make inspections
listed below.
CONTROLLED GRADING - Private grading engineer shall
7 observe work, coordinate tests, make reports.
INSPECTION DATE INSP. SIGNATURE
Initial - site prep.
ENVIRONMENTAL C iNCE
- Date I,4'7/71
EIA Log No. t'4
By
Rough - prior to drains i 7 g
Final . slopes planted (21/ff
________ Compaction reports rec'd. 4f/,7 Grading permit fee $ Z'/5 Plan check fee $
Private engr. cert. rec'd. /y7 Permit Issued - - -
by ______________________________ Date .' Copies: White-Office; Green-Building;/
'Ir / f 1 Yellow-Inspector; Pink-Permittee; Goldenrod-Finance Permit Expiration Date
THIS FORM WHEN PROPERLY VALIDATED IS A PERMIT TO DO THE WORK DESCRIBED
THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD