Loading...
HomeMy WebLinkAboutPE 2.87.14; PALOMAR AIRPORT BUSINESS PARK LOT 11; Engineering Application/Va, .2,1-7 A PN i~- Building Permit Plan Check No. Application for Grading Permit to CITY OF CARLSBAD ENGINEERING DEPARTMENT 1200 Elm Avenue 438-SW 3S's I apt9~ PE NO. dO II Valiclat o Fina Depa rtr FOR APPLICANT TO FILL IN co Site Address L t) T- I I P/ALI0 114 AR, af4 1; 1 AJ rf _< e A t V_ PIP PC-CT Surety Company 10A. - -_ / A~Y Legal Description,,., *.4 e_7,7 q_ / M, p No. 3 9 Surety Addre Subdivision Name PAI-61,I_ 04 Date Filed Rec'd by Owner Phone DA L)j 5 - M40AIA A 55 0 C47rik Cash deposit Rec'd by Date filed .$ /APO J:g -14 ng:7 , Owner's Address qp4/,~,7 ~fwmr~,IA 7'tM4:,e'L,144 13 T eA. The following documents arVfequired and shill become a part of the grading permit when they are approved. _ZGrading plans Specifications Soil report Geologic Report rainage structures Other :~~Ccompaction report Plans by Civil Engineer Ff.C.E - ca/ /7. C.U). 001,5 -74--% %A Address VT Phone .0 7- 1? ?6 ,Soil Engineer R.C.E. Phone ZITHA.-I F VFDL"*_) 2-112- 'M Grading ontractor RVRA" L Ag~VA"40 Phone SPECIAL CONDITIONS WHICH ARE MADE . APARTOF THIS PERMIT Address M I L4-&5;w6eCV— 1-4 4L )OF- r.42!!~ e1&44=&_2 Authorized hours of operation: 7:00 AM to Sunset, Monday - Friday. Party responsible forlovierall supervision Haul routes are to be approved by City Engineer. Proposed use of grade site Adequate provisions shall be made for erosion and siltation control. Number of cubic yards Cut Fill Import Waste All slopes shall be planted per City Code. ,~,3vr_4 gso c) _T_ All f ills to be compacted to at least 90% of optimum density unless noted otherwise. Proposed Schedule of Start Finish Operations (dates) 72-3—.97 I hereby acknowledge that I have read the application and state that the information I have provided is correct and agree to comply with all City ordinances and State laws regulating excavating and grading, and the provisions and conditions of any permi iss ed pursuant to this application. ZZ: Signature of Permittee Owner or authorMe a n =:Z~~~nnq r- Under City Code Sec. 11.06 170 this grading is: El REGULAR GRADING - City inspector will make inspections Ilwad below. P<ONTROLLED GRADING - Private grading engineer shall observe work, coordinate tests, make reports. INSPECTION DATE INSP. SIGNATURE Initial - site prep. 97 ENVIRONMENTAL CLEARANCE - Date ~k,b EIALogNo. 1110-n-'I By Rough - prior to drains - - V Final - slopes planted compaction reports rec'd. V Id Grading permit fee $ 006:~WPIan check fee $,~~7 Private engr. cert. rec'd. / Permit Issued ,0% t-f ~4 by ___4g2 Msg-- s2- 62 Z 1~~4 _j Copies: White-Office; dreen-Building; C/ Permit Expiration Date Yellow-inspector; Pink-Permittee; Goldenrod-Finance THIS FORM WHEN PROPERLY VALIDATED IS A PERMIT TO DO THE WORK DESCRIBED THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD 1200.ELIM AVENUE CARLSBAD, CA 92008-1989 Office of the City Engineer Citp,of Carl9bab TO: BUILDING DEPARTMENT FROM: ENGINEERING DEPARTMENT -DATE: JcA. 1z 7,1097 TELEPHONE (619) 438-5541 ROUGH GRADING APPROVAL FOR PROJECT NO. (TRACT~or P.E.'#) / &4;10~14f' a-1— .2-2 A, ~_ , Lex,~ /'~~ ~,w A* S 4 (,PROJECT I NAME LAD ADDRESS) I-,6t 'q 2,3 fo (DFVFIO-P'FR'S NAME AND ADDRESS)- We have inspected the grading- for lot/ 1Z -((,,7. -1-9-1 —or phase of the above mentioned project. In addition, we have received rough grading certification from .. JOI-7-1 the Soils Engineer, dated and from vew-n 0 p, the Supervising Grading Engineer, dated 7, and are sa,tis- fied that the rough grading has been completed in accordance with City standards. Based -on these certifications and our Observation, we take no exception to the issuance of a building permit for-lotX or phase of project. Z7. 97, 14- from a grading standpoint. This release, however, is .not intended to certify the project from other engineering concerns including site development, water or sewer availability, or final grading. Prior:to the issuance of a certificate of occupancy, we need to be advised so that we can-verify that final grading and landscaping has been complet- ed in accordance with the approved plans for the project. APPROVED: Project"'Gradia Inspector Sr. Construction Inspector cc: Developer ENGINEERING FEE: 1,75. 0 0 RECEIPT NO: - ENVIRONMENTAL IMPACT ASSESSMENT FORM Part'I (To .Be Complete d by APPLICANT) CASE NO: DATE: Applicant: SHARRAT CONSTRUCTION' Address of Applicant:- 40427 C*armelita Circle Rancho'California, CA 92390 Phone Number; 619 756-4539 Name, address and phone number of person to.be contacted (if other than .Applicant,): PROPERTY DEVELOPMENT ENGINEERS, INC., 1859 S. Escondido Blvd., Esc., CA 92025. GENERAL INFORMATION: Description of Project:, Grading for & Construction' of a 17,162 sq.ft. 2-story industrial Building Project Locati:on/Address: Lot 1 11 of Map- No.' 9389, Trac . t 79-1 Las Palmas Dr., CArlsbad, CA 92009 .Assessor Parcel Number:' 213 050 36 Zone~of Subject Property: (PM) Pla~nedlndustrial. Proposed Use of Site: Samkl-In~ustrial List all-other applicable applications r.elated to this project: Building Permit Application 2. Describe the activity ar i a, including distiguishing natural'and man-e made characteristics; also-provide -precise slope analysis' when appropriate. This project is located"in the Palomar Airport Industrial,Park..* The natural characteristics have been eliminated by previous subdivision-grading. the Northerly Manmade charact; rist:Lcs consist of .1) 3` wide concrete browditch along property line (flowing East to West). 2)Agraded' pad -with a slope avg. of 1.7%. 3)2:1 cut slopes along the Easterly"& Southerly property lines. 3— Describe energy conservation measures incorporated into the design and/or oper'ation *of the project. None., If residential, include the number of units,.schedule of unit sizes range of sale prices or rents, and type of household size'expected.", N/A If commercial, indicate the type,'whether neig-hborhood, city.or regionally oriented, square footage of'sales area, and loading facilities. N/A .6 If industrial,.indicate type, estimated employment per shift, and loading facilities. SmallIndustrial Occupancy Qroup B,2 50.persons max. per shift (total bldg.). Loading facilities consist of one truck ramp sloping then leveling @ 4'+. below. Fini,shed floor & typical level loading areas with.roll up doors. 7. If inst itutional,~ indicate the major function,'estimated employment per shift, estimated occupancy, loading facilities,.and commuh-ity benefit,s to be derived from the project. N/A -2- I ENVIRONMENTAL IMPACT, ANALYSIS Answer the following questions by placing 'a check in-the appropriate space., (Discuss all items.checked "yes". Attach additional sheets a's necessary.)' YES No .1 Could the project significantly,change present land uses in the vicinity of thb activity? X Could- 'the activity affect, the use 'of a recreational area, or area of important aesthetic value? X Could the activity affect the functioning of an established community or neighborhood? X Could the activity result in the displacement. of community residents-? X~ Could the activity increase the number of low and' modest cost housing units in the city). X Could,the activity decrease the number of Iow and: -modest cost housing units in the city? X Are any of the natural or man-made features in the activity area unique, that is, not found in other parts of the county, state or nation? X, Could the activity significantly affect an historical or archaeological site or its settings'? X ..9) Could the activity significantly affect the potential use, extraction, or conservation of a scarce natural resource? X Does the activity signi'ficantly affect the potential use, extract ion, or conservation of a scarce natural resource? X Could the activity significantly aff ect fish,*' wildlife or plant-life? X Are there any rare or endangered' plant species in the activity area?, X Could the activity change existing features of any of the city's-lagoons, bays, or tidelands? X C , ould the activity change existing features of any of the city's beaches?, X ,15) Could the-activity result in the erosion or elimination of agricultural lands? X_ 16) Could the activity serve to encourage development of presently-undeveloped areas or: intensify develop- ment of already developed areas? -3- YES NO '17,) Will the activity require a variance from established.environmental standards (air, water, noise, etc.)?, X Will the activity require. certification, authoriza- tion.or issuance of a permit by'any'local, state or federal environmental control, agency? X A Will the activity require issuance of a variance. or conditional use permit by the City? X Will the activity involve the application, use, or disposal of potentially;hazardous materi,als? X Will the activity involve construction.of facil ;ties in a flood dain?- P X Will.the activity involve,construction of facilities in the area of an'active fault? X Will the activity involve construction of facilities 'on a slope of, 25 percent or gr''ater? e X Could .the activity result in the generation of significant amounts ofhoise? X Could.the activity result in -the generation of significant amounts of dust? X Will the,activity involve the.burning of brush, trees,:or other materials? X , 27) Could the activity result in a significant change in the quality of any portion of t.he region's air or wat,er resources? (Should note surface, ground water,'F off-shore.) ~X 28) will t,he project substantially increase fuel consumption (electricity', oil, natural g6s, etc.)? X 29) Will there be a significant change to existing 1-and form? X Indicate estimated grading to be done in* cubic yards.: 650 Percentage of alteration to the present land form: 5% Maximum height of cut or fill slopes: 12' existing & 3' new -- 15' overall 30) Will the activity result in substantial increases in the use.of utilities, sewers,,drains or streets? X 31) Is the activity carried out as part of a larger projec.t or series of projects? a X -4- STATEMENT OF_NON-SIGNIFICANT ENVIRONMENTAL EFFECTSF.... f If you have answered yes to one,or more,of the questions in Section I but you-think'the activity will have no significant environmental effects, indicate your 'reasons below:- N/A N COMMENTS OR ELABORATIONS,TO ANY OF THE QUESTIONS IN SECTION I (If additional space is I needed foi'answering any questions, attach additional sheets as needed.) Signature (Perl;on Completincy Report) Date Signed