Loading...
HomeMy WebLinkAboutPE 2.87.53; CAR COUNTRY EXPANSION|CARLTAS; Engineering ApplicationApplication for Grading Permit CITY OF CARLSBAD ENGINEERING DEPARTMENT 1200 Elm Avenue 438-V541,3,S50 Building Permit Plan Check No. I M PENO. APA)a- Validation by Finahce Department FOR APPI IrA11JT TO FILL IN Site Address North of Palomar Airport Road Surety Company Bond No. East of Paseo Del Norte Legal Description Por. of lot "IV', Map No. 823. Surety Address RHO. Agpa ~edionda Subdivision Name Date Filed Rec'd by N/A Owner Phone Cash deposit Rec'd by Date filed Carltas Cg=my 944-4090 $ 'Owner's Address . . 92024 The following documents are required and shall become a part 4401 Manchester Ave., Suite 206, Encinitas, CA of the grading permit when they are approved. Grading plans - Speci . fications Plans by Civil Engineer R.C.E. 31756 Nolte and Associates Jams R. Hettin= - Soil report - Geologic Report Address Phone 278-9392 — Drainage structures - Other 975~ Claireniont Mesa Blvd Sm- Dipprc) Compaction report~ Soil Engineer R.C.E. Ph(Tne J,grneq, F _' Ca~yal I in 17551 224-2911 Grading Contractor Phone SPECIAL CONDITIONS WHICH ARE MADE To be determined N/A A PART OF THIS PERMIT Address Authorized hours of operation: NIA 7:00 AM to Sunset, Monday - Friday. Party responsible for overall supervision John Whi~p_ Car1t_-.qq Ca=any Haul. routes are to be approved by City Engineer. Proposed use'o~ grade site 1 Adequate provisions shall be made for erosion and siltation control. Fi I I P=r-.T-t- f-e-cip Ca-rj oharl- T-rat-~ A Number ot cubic yards Cut Fill Import Waste All slopes shall be planted per City Code. 13 -000. All fillsto be-compacted to at least-90%of optimum Proposed Schedule of Start Finish Operations (dates) Ap~ril .15, 1987 Oct. '15.- 1987 density unless noted otherwise. I hereby acknowle dge that I have read the application and state that the information I have provided is correct and agree to comply with a.11 City ordinances and State laws regulating excavating and grading, Under City Code Sec. 11.06 170 this grading is: and the provisions and conditions of any permit pursuant to 0 REGULAR.GRADING - City i.nspector will make inspections thisapplication. listed below. . GRADING - Private grading engineer shall .000NTROLLED Signature of Permittee I observe work, coordinate tests, make reports. A~agent INSPECTION DATE INSP. SIGNATURE Owner or authon-red Initial - site prep. ENVIRONMENTAL CLEARANCE - Date Rough - prior to drains EIA Log No. Final - slopes planted By Compaction reports rec'd. Grading permit fee $ Plan check fee $ I Private engr. cert. rec'd. Permit Issued by Date Copies: White-Office; Green-Building; Permit Expiration Date Yellow-Inspector; Pink-Permittee; Goldenrod- Finance THIS FORM WHEN PROPERLY VALIDATED IS A PERMIT TO DO THE WORK DESCRIBED THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD ENGINEERING DEPARTMENT .1200 Elm Avenue 438-5W Application for Grading Permit CITY OF CARLSBAD PE No. DW6*k 2 b 5 -2 A APIJ 2,11 - 0 4 - ZI Validation by Finance Department Building Permit Plan Check No. FOR APPLICANT TO FILL IN Jo. )y R :oAe—a part ions Report IADE ?er. and siltation timurn 1rading is: ake inspections ingineer shall S. SIGNATURE 1 1 Jenrod-Finan Building Permit Plan Check No J Application for Grading Permit JZP CITY OF CARLSBAD ENGINEERING DEPARTMENT 2075 Las Palmas Drive 438-3550 P E N 0. 9, -5 3 Validation by FinanV/ -07 Af Department 05/18 0101 Misc. 555-00 FOR APPLICANT TO FILL IN Site Address &4J SP46eo Dod-061_ 5,PJADMA110A Sur C ny e F'I Bond No. S/7214r)4q Legal R escr'ptio Map No. I S ety Address Po Y.52, 14 --b j? e2l Rnx I C514., H b) e?tof C2 Subdivision Na it Date ilec~ ekc'd by F~ Ovvn%e _j Phone Ca;hdep6sit Re)'d bi te fil d 4 f $ ~5 ;~;2 Wbecor~m~ne Owner's Address The folfowing documents aTe fe'qdired and shall part ,4401 N,-,ArL_S1nr_AV. Cru-1,14 of the grading permit when they are approved. - Grading plans Specifications Plan - ivil Engineer R.C.E k ) nh e, r- — Soil report Geologic Report Address Dne \J 9~66da,~remvJ -!*;,B)yJ ~Ljg-'1312_ Drainage structures Other Compaction report Soil Engin R.t:-- Phone ?_ 2!f- c7; LIS In in klpaj~~Valj_d L/Ap"_->0 Grading,Contractor 4hone SPECIAL CONDITIONS WHICH ARE MADE 3) A PART OF THIS PERMIT Address L_vLl, i6ly S 2 1 . Authorized hours of operation: 7:00 AM to Sunset, Monday - Friday. Party res ble oKverall supervision hIL) M -'5~f2 Haul routes are to be approved by City. Engineer. Proposed use of grade site C_ T_ i!~' I jP Co to ts, Adequate provisions shall be made for erosion and siltation control. Number of cubic yards Cut Fill Import Waste All slopes shall be planted per City Code. Proposed Schedule of I ~ Operations (dates) Atp Start Fi Ish be compacted to at least 90% of optimum ensity oted otherwise. I hereby acknowledge that I have read the application and state that the information I have provided is correct and agree to comply with all City ordinances and State laws regulating excavating and grading, and the provisions and: 7cn Vrni s ed pursuant to this application. Signature of Permitte 7 144 -4 0.) C4 I- VO 01 . City de Sec. 11.06 170 this grading is: RAD - City inspector will make inspections Mel bw. 0 CONTROLLE ADING - Private grading engineer shall bserve w ordinate tests, make reports. Owner or authorized ~_N DATE INSP. SIGNATURE Initial - site prep. ENVIRONMENTAL CLEARANCE - EIA Log No. Date Z~Z/Z/Pg I BY Rough - prior to drains Final - slopes planted Compaction reports rec'd. Grading permit fee $ Plan check fee $ Private engr. cert. rec'd. Permi by Date S//-5/j08 If - Copies: White-Office; Green-Building; Permit Expiration Date Yellow-inspector; Pink-Permittee; Goldenrod- Finance THIS FORM WHEN PROPERLY VALIDATED IS A PERMIT TO DO THE WORK DESCRIBED THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD 2075 LAS PALMAS DRIVE CARLSBAD, CALIFORNIA 92009-4859 Office of the City Engineer TRU of (fartsbab TO: DEVELOPMENT PROCESSING SERVICES FROM: ENGINEERING DEPARTMENT DATE: TELEPHONE (619) 438-1161 ~7 ROUGH GRADING APPROVAL FOR PROJECT'NO.. (TRACT or P.E. #) L/ (PROJECT NAME AND ADDRESS) 114-01 I'la g)ck 06 C "t, 4L - (DEVELOPER'S f AND.ADDRESS) We have inspected the grading for lots or phase of the above mentioned project.- In addition, we have received rough grading certification from Z"qr_60k7 . kn Fe the Soils Engineer, dated 1JS'q and from 1)10v~"007o741' eor-iou-& Alalll_e4Asjo!~, the Supervision Grading Engineer, dated and are satisfied that the rough grading has been completed in accordance with City standards. Based on these certifications and our observation, we take no exception to the issuance of a building permit for lots /—/0 or phase of project /P. 9 7 from a grading standpoint. This f"elease, however, is not intended to certify the project from other engineering concerns including site development, water or sewer availability, or final grading. Prior to the issuance of a certificate of occupancy, we.need to be advised so that we can verify that final grading and landscaping has been completed in accordance with the approved plans for the project. APPROVED: V Project Grading Inspector 5r.- Construction Wpector FE . Project Engineer, t: Developer CITY Of CARLSBAD ENG-INEERING DEPARTMENT FEES D 4 DEPOSITS WORKSHEET PREPARED BY: PROJECT NAM E DATE. TENTAT-IVEi~AOCEL. MAP FEE . . . . ... .. .. . . A . . . . . . . . ,4-..MAP FEE,(— LOTS)(PARCEL MAP/FINAL, MAP NO. OF LOTS (EXPEDITED/NOT EXPEDITED) PARCEL -MAP EXTENSION FEE . . . . . .. IMPROVEMENT PLAN CHECK FEE: DEPOSIT WITH SUBMLTTAL RECEIPT'NO. IMPROVEMENT DESCRIPTION BONDED VALUE TOTAL:. IMPROVEMENT INSPECTION FEE: ITEM TOTAL: VALUE X PERCENTAGE X PERCENTAGE c PARK —IN —LIEU FEE (CIRCLE ONE): DWELLING TYPE: SF OR DUPLEX MF (<4 UNITS) MF (> 4 UNITS) MH AREA:. ' .1 2. 3 4 -NUMBE-R OF UNITS: X. AREA FEE75NIT STREET LIGHT ENERGIZING: 5,800 LUMEN AT 81.00 9,500 LUMEN AT 111.06- 16,000 LUMEN AT 152.10 = 20,000 LUMEN AT 169.38 = TOTAL: GRADING PLAN CHECK FEE DEPOSIT RECEIP'T-NO. Co l/ .(EXPEDITED/NOT EXPEDITED)' ..GRADING PLAN CHECK FEE 634-f, POD CUBIC ARDS) ~Zwa 2-A 04 GR'ADING. CASH DEPOSI . . . ... . . 3. DUPILICATE.TRACING FEE . . . . . . . . . .. . . . . . . . . . . ... . . STREET SIGN'DEPOSIT:- AT AT AT TOTAL:. STREET'STR-IPING DEPOSIT . . . . . . . . . . . . . . . . . . . . . . . . FRONT LINE OR AREA FE.E.S (TYPE ... . ... . . . . . . . . . . ... DR*AINAGE AREA FEE (AREA NO. . . . . . .. . TOTAL ACRES: X A R E'A FEE LESS VALUE OF.AASTER bRAINAGE~IMPROVEMENTS AS NOTED IN MASTER DRAINAGE PLAN DOCUMENTS MULTIPLIED BY CURRENT-INFLATION FACTOR.. _L I N E VALUE X FACTOR AMOUNT X X X TOTAL: DRAINAGE FEE DUE: . . . ADDITIONAL FEES' TYPE* TYPE: . ... . . . TOTAL FEES AND DEPOSITS:-.. (IN ADDI'TI.ON, A.GRADING PERMITFEE OF IS DUEUPON ISSUANCE OF THE. GRADING PERMIT.) t SnAD4-t-1-S-1-0* L 0 G STAFF-ENGINEER: C. koo F NO. SUBDIVISION NAME: OWNER/DEVELOPER: ADDRESS: P~ONE : 'ENGINEER OF WORK: ot:m FIRM: ADDRESS: PHONE: TENTATIVE MAP APPROVAL: 1ST EXTENSION: 2ND EXTENSION: IMPROVEMENT PLAN NO.: GRADING PLAN NO.: z A, "AS BUILTS" APPROVED: GRADING PERMIT NO.: EROSION CONTROL PLAN: BONDS AND AGREEMENTS 5 AGREEMENT TITLE EXPIRATION DATE FAITHFUL PERFORMANCE BOND AMT. LABOR & MATERIALS BOND AMT. MONUMEN- TATION BOND AMT. ISE URLJ-*--- =TYPEICASH? U~MW COMMENTS S-rV414PAZ —0— —a— 019 106, (OW/4 fb tq to 0" 2,0 5~_-z 5 T.,. 2A SURETY. COMPANY:— t ADDRESS: CONTACT: PH6NE: EASEMENTS REPORTS TYPE OF REPORT STATUS (IN, N/A). CHECKED BY Til;j v~ llqgAl Guarantee Traverse Calcs Hydraulic-Cal-cs HydroloqZ Carc—s Sewer.Calcs —water System Caics 5oils Report WATER DISTRICT: SEWER DISTRICT: SCHOOL DISTRICT: PLANNING AREA: DRAINAGE AREA: SPECIAL ZONES:(ASSESSME NT, THOROUGHFARE, PLANNING ACTION: BRIDGE DISTRICTS: COMMENTS: