Loading...
HomeMy WebLinkAboutPE 2.88.56; LA COSTA MEADOWS UNIT 4 LOT 704; Engineering ApplicationAl;iplicaitiionjor Gradihg,Permit PE No. CITY'OF CARLSBAD, ENGINEERING DEPARTMENT 2075 Las Palmas DHve 438-3550 Validation by Finance Afflfflerd0ol 01 '05 Building Pe I rmit Plan Check No. Misc 200-0.0 FO,R APPLICANT TO FILL'IN Site Address AF11IL091h T S r t Compa y Bond No. Rar~cos. 4 A W. 02 21 Legal, Descript' n -Map No. PT 704 Surety Address - '77 * Sd /4iio t, Subdivision Ngn, P~~ Date Filed jFkjQq by Al -le /009 Owner Phone Jowl Cash deposit. Re" b Dote. e A. y $ Owner'.sAddjess" 14o WWWW~04 J~Wlolrhi The folr6 ing 09currientsare:req hall ~hecome a part of the grading permit When th..eyare approved. Grading plans Specifications Soil report Geologic Report r gostructures~ Di aina Other Compaction, repor t Plans by Civil Eng* eer R.C-E Address Ph e Soil Engineer R.C.E. Phone Grading Contractor Phone SPECIAL CONDITIONS WHICH ARE MADE A PART OF THIS:PERMIT. Address 1 .-Authorized, hours of operation: 7.0 - 0 AM to Suns t Monday'- Friday. y respon roverall supervision S 2., Haul routes: are to be approved by City Engineer~ Proposed use:of r d i e a e sit 3. Adequate. provisions shall'be made for erosion 4nd-,siltation. Number of cubic ya'rds contrbl. Cut Fill Import- Waste. - 4 All slopes shall..be planted,per City Code.. - Proposed Schedule of Start' -Finish 5 All fills to be compacted to at least 90% of *optimum, Operation s (dates) density unless noted otherwise-. I hereby acknowledge that I have read theapplication and state that the information I have provided is -correct and, agree to*comply With: all City ordinances and State laws regulating~ excavatingond grading, rhi issu p uantto:. and the provisions and conditions of any per t ed' 6f S Under.City:Code Sec. 11.06 170 this grading is: 0 REGULAR GRADING City inspector will make inspections ,.this application. 7 .11stedbelow.' ,Signature of Perm ittee<2_m__~ 0 CONTROLLED GRADING - Private grading engineer shall IF ohwvei worki coordinate tests, make reports. Owner or authoriz dagen-i w., INSPECTION DATE P S 0h,%TffA E Initial - site prep, -ENVIRONMENTAL CLEARANCE - 141'>P 0'6~3`-O Date 41 'Rough prior to drains 64011fa - E [A Log No. B MA Final - slop~tsplanted Compaction reports rec'd. PA9 ading permitfee $.2Lt).4DO~ Plan check.166 $ Private enbr. cert. rec'd. 1 . IIEPtnit Issued 119s, 1/1 1__~ ::- /// 42 by Uate !i~/ Copies: White-Office;.,dre64-Build66, Permit Expiration Date ~ i w Yel low- Inspector; Pli Goldenrod-Fin'Ance TH IS.:FO.RM WH EN PROPE R LY VAL I DATED 19 A PE RMIT.TO DO TH E WO R K D ESCR I BED 'THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD CASE NO. DATE: i L AM ENVIRONMENTAL IMPACT ASSESSMENT, FORM -''PARTA , (To.be Completed by.APPLICANT) Applicant: Kal Address of Applicant: Phone Number: (614 615 Name,'address and phone number of person to be contacted (i f other than Applicant): GENERAL INFORNATION: (Please'.be ,specific) Project Description: -051014tz- PAH1(,J ggloyZE, ov M? 0 412APIt4614 Project Location/Address: &01L091Ar '-!!2GX" Assessor Parcel Number: General Plan/Zone of Subject Property: Local Facilities Manaqement Zone: Is the site,with.in Carlsbad's Coastal Zone? Please describe the area -S'-urrounding-the' site to the North: ' WKiQ90L East: South: West: List all other applicable pe mits & approvals related t I o-this project: ag_4104 2 (Please'be Soffic. Attach Additional -Pages or Exhibits. if necessary) l.'- Pl ea-ii? descri,be the, project site, including distingutshing natural and manmade characteristics. Also provide precise'slope analysis when a slope of. 15-' or higher 'and 15% grade or greater,is present on the site. Ak/)" LOCI Please describe energy co,n~ervati.on measures incorporated into the design and/or'operation of the projedti: PLEASE ATTACH A PROJECT SUMMARY-SHEET WHICH-SHOWSTHE FOLLOWING: a.,If a res,idential.Projedt ,ident.ify the number of.un.its, type~of units, schedule of unit sizes, range of sale pri I ces, or ients, and type of hou.sehol d s i ze expected, average dai 1 y traf f i c generati on (1 atest SANDAG rates.). If a co c ial projecti indicate the exact typej activity(ies),; a squar~ footage (of sal,es area, average ..daily traffic generation (latest SANDAG rates), parking provided, and loading facilities. If an i Utu r ~ia 1 project, indicate the exact.type or industry.(les), average.- daily traffic generation (latest SANDAG... rates), estimated employment per shift, time of shifts, and.loading.facilities. If an i tional project, indicate the major project/-site W<.? ~ - imated *oc function, estimated 'employment per shift, est cupancy, loading facilities, and, community benefitg~ to be deri.ved from the project. 3 ROMMENTAL -IMPACT,ANALY-M Please-Answer each of the following questions.by placing.a -check in the appropriate space. Then, fully discuss and explain why '0'acih item was checked yes or no. Provide supporting data if applicable. Attach additional sheets as necessary. NO Could-the project significantly impact or change presentor future land uses in the victnity of the activity? EXPLANATION: Could the activity affect the use of a recreational area, or area of' aesthetic value? EXPLANATION: Could the activity affect the functioning of'an established community or neighborhood? EXPLANATION: -4) Could the activIty result -in the'displ,acement of community residents? EXPLANATION:. 4 LEI NO Could the activity increase the number of low and imoderate cost housing units in the cit.y? EXPLANATION: Could the act'ivity significantly affect,existing housing or create a demand for additional housing? EXPLANATION: Are any of the natural or man-made.fea tures in the. activity area unique, that is, not foqnd,,in other parts of the county, state or nation? EXPLANATION: -8) Could the activity significantly affect an historical,or archaeological s-ite or its settIngs? EXPLANATION: 9) Could the activity significantly-affect the potential use, ext ' racti.qn, or conservation of'a scarce natural resource! EXPLANATIM, 5 M Could the activity significantly.affect fish', wildlife or plant resources? EXPLANATION: Are there any ra - re or endangered plant or animal species in the actiVityarea? EXPLANATION: Could the activity change existing features of any. of the city's stream, 1-agodns,~bays, tidel ands or beaches? IPYPIANATTnm- Could the activity result in the erosion-or elimin- ation of agricultural' lands? EXPLANATION: Could the activity serve to encourage development of presently,undeveloped Areas-or intensify.-devellop- ment of already developed.areis") EXPLANATION: 6 NO .15) Will -the activity require a vari a.nce from. estab-- 1 i'shed environmental standards (ai r, water, 'noi..se,. etci)? EXPLANATION* . J6) Is the activity carried out as' part of a largqr project or series of projects? EXPLANATION: 17) Wi , 11 the activity -.require certification, authoriza- tion or issuance-ol"a permit by any.l.ocal, state or federal environmental control.agency? EXPLANATION: Will the aictivity.require- issuance of 4 variance.or. conditional use permit by the,. C i ty? .EXPLANATION: Will the activity~ involve the iopl i c.at i on use, or disposal of potentially hazardous.mAtitials? EXPLANATION: 7 0 YES NO Wil-l' the ~ctiVity involve construction of facilities in a flood plain? EXPLANATION: Will the activity involve construction of facilities in the area of an active fault? EXPLANATION: Could the activity result in the generation.of significant amounts of dust? EXPLANATION: "I' Will the activity involve the burning of brush, trees.,* or other materials? EXPLANATION:' Could the activity result in a significant change in*the quality of Any portion of the region's air or water resources?. (Should note surface,.ground water, off-shore.) .EXPLANATION: 8. NO 25) Will'-th.e project substantial-ly increase,fuel consumption Celvctricity,~ofl'v natural gas, etc. EXPLANATION: 26) Will the actilvity i.nvolve construction of facilities ~on a slope of 25 percent or greater?-* EXPLANATION: "50" &!X100 65 27) Will there be a significant change to existing land form? Indicate estimated gracHng-to be done in cubic yards:, -04 i Z5 a Percentage of alteration to the present land form: e0b 170 Maximum h ight of cut or* fill slopes: ILL, _Aa qLjwj:F— EXPLANATION: 28) Will the activity result in substantial ~increases in.the use~of utilit1es, sewers, drains or streets? EXPLANATION: YES NO 29) Will the project s:ignificantly increase wind or water erosion of soils? EXPLANATION: Could the project significantly affect existing fish or wildlife habitat? EXPLANATION: Will the project 'significantly produce new light or gi.are? EXPLANATION: 10 II. STATEMENT 0 ON-SIGNIFICANTANVIRONMENTAL EFFECTS If you have'.answered yes to any,.of the questions in Sectjon I but think the activity will have no significant environmental effects, indicate your reasons below III. COMMENTS OR ELABORATIONS TO ANY-OF THE QUESTIONS IN SECTION I (If additional space. ls -needed. for answering any' questions, attach additional sheets as needed.) Signature erso ompleting Report)':' Date Signed 'Instruct.eia LBS,-A h