HomeMy WebLinkAboutPE 2.88.56; LA COSTA MEADOWS UNIT 4 LOT 704; Engineering ApplicationAl;iplicaitiionjor Gradihg,Permit PE No.
CITY'OF CARLSBAD,
ENGINEERING DEPARTMENT
2075 Las Palmas DHve
438-3550 Validation by Finance
Afflfflerd0ol 01 '05
Building Pe
I
rmit Plan Check No. Misc 200-0.0
FO,R APPLICANT TO FILL'IN
Site Address
AF11IL091h T S r t Compa y Bond No.
Rar~cos. 4 A W. 02 21
Legal, Descript' n -Map No.
PT 704
Surety Address -
'77 * Sd /4iio t,
Subdivision Ngn,
P~~
Date Filed jFkjQq by
Al -le /009
Owner Phone
Jowl
Cash deposit. Re" b Dote. e A. y
$
Owner'.sAddjess"
14o WWWW~04 J~Wlolrhi
The folr6 ing 09currientsare:req hall ~hecome a part
of the grading permit When th..eyare approved.
Grading plans Specifications
Soil report Geologic Report
r gostructures~ Di aina Other
Compaction, repor t
Plans by Civil Eng* eer R.C-E
Address Ph e
Soil Engineer R.C.E. Phone
Grading Contractor Phone SPECIAL CONDITIONS WHICH ARE MADE
A PART OF THIS:PERMIT.
Address 1 .-Authorized, hours of operation:
7.0 - 0 AM to Suns t Monday'- Friday.
y respon roverall supervision
S 2., Haul routes: are to be approved by City Engineer~
Proposed use:of r d i e a e sit
3. Adequate. provisions shall'be made for erosion 4nd-,siltation. Number of cubic ya'rds contrbl.
Cut Fill Import- Waste. - 4 All slopes shall..be planted,per City Code.. -
Proposed Schedule of Start' -Finish 5 All fills to be compacted to at least 90% of *optimum,
Operation s (dates) density unless noted otherwise-.
I hereby acknowledge that I have read theapplication and state that
the information I have provided is -correct and, agree to*comply With:
all City ordinances and State laws regulating~ excavatingond grading,
rhi issu p uantto:. and the provisions and conditions of any per t ed' 6f S
Under.City:Code Sec. 11.06 170 this grading is:
0 REGULAR GRADING City inspector will make inspections
,.this application. 7 .11stedbelow.'
,Signature of Perm ittee<2_m__~
0 CONTROLLED GRADING - Private grading engineer shall
IF ohwvei worki coordinate tests, make reports.
Owner or authoriz dagen-i w., INSPECTION DATE P S 0h,%TffA E
Initial - site prep,
-ENVIRONMENTAL CLEARANCE -
141'>P 0'6~3`-O Date 41 'Rough prior to drains 64011fa -
E [A Log No.
B MA Final - slop~tsplanted
Compaction reports rec'd.
PA9
ading permitfee $.2Lt).4DO~ Plan check.166 $
Private enbr. cert. rec'd. 1 . IIEPtnit Issued 119s, 1/1 1__~ ::- /// 42 by Uate !i~/ Copies: White-Office;.,dre64-Build66,
Permit Expiration Date
~
i
w
Yel low- Inspector; Pli Goldenrod-Fin'Ance
TH IS.:FO.RM WH EN PROPE R LY VAL I DATED 19 A PE RMIT.TO DO TH E WO R K D ESCR I BED
'THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD
CASE NO.
DATE: i L AM
ENVIRONMENTAL IMPACT ASSESSMENT, FORM -''PARTA ,
(To.be Completed by.APPLICANT)
Applicant: Kal
Address of Applicant:
Phone Number: (614 615
Name,'address and phone number of person to be contacted (i f other than
Applicant):
GENERAL INFORNATION: (Please'.be ,specific)
Project Description: -051014tz- PAH1(,J ggloyZE, ov
M? 0 412APIt4614
Project Location/Address: &01L091Ar '-!!2GX"
Assessor Parcel Number:
General Plan/Zone of Subject Property:
Local Facilities Manaqement Zone:
Is the site,with.in Carlsbad's Coastal Zone?
Please describe the area -S'-urrounding-the' site to the
North: ' WKiQ90L East:
South: West:
List all other applicable pe mits & approvals related t I o-this project:
ag_4104
2
(Please'be Soffic. Attach Additional -Pages or Exhibits. if necessary)
l.'- Pl ea-ii? descri,be the, project site, including distingutshing natural and
manmade characteristics. Also provide precise'slope analysis when a slope
of. 15-' or higher 'and 15% grade or greater,is present on the site.
Ak/)" LOCI
Please describe energy co,n~ervati.on measures incorporated into the design
and/or'operation of the projedti:
PLEASE ATTACH A PROJECT SUMMARY-SHEET WHICH-SHOWSTHE FOLLOWING:
a.,If a res,idential.Projedt ,ident.ify the number of.un.its, type~of units,
schedule of unit sizes, range of sale pri
I
ces, or ients, and type of
hou.sehol d s i ze expected, average dai 1 y traf f i c generati on (1 atest SANDAG
rates.).
If a co
c
ial projecti indicate the exact typej activity(ies),;
a
squar~ footage (of sal,es area, average ..daily traffic generation
(latest SANDAG rates), parking provided, and loading facilities.
If an i Utu r ~ia 1 project, indicate the exact.type or industry.(les),
average.- daily traffic generation (latest SANDAG... rates), estimated
employment per shift, time of shifts, and.loading.facilities.
If an i tional project, indicate the major project/-site W<.? ~ - imated *oc function, estimated 'employment per shift, est cupancy,
loading facilities, and, community benefitg~ to be deri.ved from the
project.
3
ROMMENTAL -IMPACT,ANALY-M
Please-Answer each of the following questions.by placing.a -check in the
appropriate space. Then, fully discuss and explain why '0'acih item was
checked yes or no. Provide supporting data if applicable. Attach
additional sheets as necessary.
NO
Could-the project significantly impact or change
presentor future land uses in the victnity of the
activity?
EXPLANATION:
Could the activity affect the use of a recreational
area, or area of' aesthetic value?
EXPLANATION:
Could the activity affect the functioning of'an
established community or neighborhood?
EXPLANATION:
-4) Could the activIty result -in the'displ,acement of
community residents?
EXPLANATION:.
4
LEI NO
Could the activity increase the number of low and
imoderate cost housing units in the cit.y?
EXPLANATION:
Could the act'ivity significantly affect,existing
housing or create a demand for additional housing?
EXPLANATION:
Are any of the natural or man-made.fea tures in the.
activity area unique, that is, not foqnd,,in other
parts of the county, state or nation?
EXPLANATION:
-8) Could the activity significantly affect an
historical,or archaeological s-ite or its settIngs?
EXPLANATION:
9) Could the activity significantly-affect the
potential use, ext
'
racti.qn, or conservation of'a
scarce natural resource!
EXPLANATIM,
5
M
Could the activity significantly.affect fish',
wildlife or plant resources?
EXPLANATION:
Are there any ra
-
re or endangered plant or animal
species in the actiVityarea?
EXPLANATION:
Could the activity change existing features of any.
of the city's stream, 1-agodns,~bays, tidel ands
or beaches?
IPYPIANATTnm-
Could the activity result in the erosion-or elimin-
ation of agricultural' lands?
EXPLANATION:
Could the activity serve to encourage development
of presently,undeveloped Areas-or intensify.-devellop-
ment of already developed.areis")
EXPLANATION:
6
NO
.15) Will -the activity require a vari a.nce from. estab--
1 i'shed environmental standards (ai r, water, 'noi..se,.
etci)?
EXPLANATION* .
J6) Is the activity carried out as' part of a largqr
project or series of projects?
EXPLANATION:
17) Wi
, 11
the activity -.require certification, authoriza-
tion or issuance-ol"a permit by any.l.ocal, state
or federal environmental control.agency?
EXPLANATION:
Will the aictivity.require- issuance of 4 variance.or.
conditional use permit by the,. C i ty?
.EXPLANATION:
Will the activity~ involve the iopl i c.at i on use, or
disposal of potentially hazardous.mAtitials?
EXPLANATION:
7
0
YES NO
Wil-l' the ~ctiVity involve construction of facilities
in a flood plain?
EXPLANATION:
Will the activity involve construction of facilities
in the area of an active fault?
EXPLANATION:
Could the activity result in the generation.of
significant amounts of dust?
EXPLANATION:
"I'
Will the activity involve the burning of brush,
trees.,* or other materials?
EXPLANATION:'
Could the activity result in a significant change
in*the quality of Any portion of the region's air
or water resources?. (Should note surface,.ground
water, off-shore.)
.EXPLANATION:
8.
NO
25) Will'-th.e project substantial-ly increase,fuel
consumption Celvctricity,~ofl'v natural gas, etc.
EXPLANATION:
26) Will the actilvity i.nvolve construction of facilities
~on a slope of 25 percent or greater?-*
EXPLANATION: "50" &!X100 65
27) Will there be a significant change to existing
land form?
Indicate estimated gracHng-to be done in
cubic yards:, -04 i Z5 a
Percentage of alteration to the present
land form: e0b 170
Maximum h ight of cut or* fill slopes: ILL, _Aa qLjwj:F—
EXPLANATION:
28) Will the activity result in substantial ~increases
in.the use~of utilit1es, sewers, drains or streets?
EXPLANATION:
YES NO
29) Will the project s:ignificantly increase wind or
water erosion of soils?
EXPLANATION:
Could the project significantly affect existing
fish or wildlife habitat?
EXPLANATION:
Will the project 'significantly produce new light
or gi.are?
EXPLANATION:
10
II. STATEMENT 0 ON-SIGNIFICANTANVIRONMENTAL EFFECTS
If you have'.answered yes to any,.of the questions in Sectjon I but think
the activity will have no significant environmental effects, indicate your
reasons below
III. COMMENTS OR ELABORATIONS TO ANY-OF THE QUESTIONS IN SECTION I
(If additional space. ls -needed. for answering any' questions, attach
additional sheets as needed.)
Signature
erso ompleting Report)':'
Date Signed
'Instruct.eia
LBS,-A h