HomeMy WebLinkAboutPE 2.89.05; PALOMAR AIRPORT BUSINESS PARK; Engineering ApplicationA~ 4
Building Permit Plan Check No
Application for Grading Permit l4tA4,
CITY OF CARLSBAt'
ENGINEERING DEPARTMENT
eVID Las r-aimas Drive
438-3550 Validation by Finance
74281
Department
06/07/89 o0o, 01.
PE NO.
-DWCD , I_Z98
05
FOR APPLICANT TO FILL IN
Site Address
CAMINO VIDA ROBLE & LAS PALMAS DR.
Legal Description Map No.
LOT 4 C.T. 8o-33 10061
Subdivision Name
PALOMAR AIRPORT BUSINESS PARK
Owner Phone
HAWTHORNE MACHINERY (619)277-2260
Owner's Address
4200 KEARNY MESA RD.
Plans by Civil Engineer R.C.E.
HENRY WORLEY ASSOC. INC. 18673
Address - Phone 7875 CONVOY CT. SAN DIEGO, CA. (619)571-7728
Soil Engineer R.C.E. Phone
BENTON ENGIINEERING INC. 10332 (619)565-1955
Grading Contractor Phone
Q & Do in
Address
54tt,~00ā_ā NL-, ~Vsml
y responsib"r overall supervision
(Ldmzt) C rXed - --ED
Proposed use of grade site
INDUSTRIAL FACILITY
Number of cubic yards
Cut Fill Import Waste
17824 2483 15341
Proposed Schedule of Start Finish
Operations (dates) MARCH 89 JUNE 89
I hereby acknowledge that I have read the application and state that
the information I have provided is correct and agree to comply with
all City ordinances and State laws regulating excavating and grading,
and the provisions and conditions of any permit issued pursuant to
this application.
Signature of Permittee
Owner or authorized agent VI_ o,, LJJy,0,, XGMT
ENVIRONMENTAL CLEARANCE -
Date
EIA Log No. ME& DE:C,
(;~,Q P S 9- ā /~ By 4 2R y- Eā
Grading permit fee $_q,?O, L20 Plan check fee $
Per ' Is u
by
Permit Expiration Date
J- Surety Company f /,VVe-%end No. 577 - VV
Surety Address
0-5-6? 2F
Date Filed -Aec'd by
&1 471
Casli deficisit Rec'd by Date filed
$.,2,aj 44A'& 0"Z , 5 -/.; Z -- Aq 9
The following documents are required and shall bicome 'a part
of thergrading permit when they are approved.
Lf Grading plans k__ Specifications
Soil report Geologic Report
Drainage structures Other
Iff Compaction report
SPECIAL CONDITIONS WHICH ARE MADE
A PART OF THIS PERMIT
1 . Authorized hours of operation:
7:00 AM to Sunset, Monday - Friday.
Haul routes are to be approved by City Engineer.
Adequate provisions shall be made for erosi6n and siltation
control.
All slopes shall be planted per City Code.
All fills to be compacted to at least 90% of optimum
density unless noted otherwise.
Under City Code Sec. 11.06 170 this grading is:
E) REGULAR GRADING - City inspector will make inspections
listed below.
IR CONTROLLED GRADING - Private grading engineer shall
observe work, coordinate tests, make reports.
INSPECTION DATE INSP. SIGNATURE
Initial - site prep. 6 / 4~
Rough - prior to drains -7119'10 ~Cf LZ4-
Final - slopes planted
Compaction reports rec'd.
Private engr. cert. rec'd.
Copies: White-Office; Green-Building;
Yellow-inspector; Pink-Permittee; Goldenrod-Finance
THIS FORM WHEN PROPERLY VALIDATED IS APERMIT TO DO THE WORK DESCRIBED
THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD
_X
2 LMAS DRIVE TELEPHONE
0 ,-(619)438-1161 CA CALIFORNIA 92009-4859
Office of the City Engineer
TitLi f C
TO: DEVELOPMENT PROCESSING SERVICES,
FROM: ENGINEERING INSPECTION DIVISION
DATE:
ROUGH GRADING APPROVAL FOR PROJECT NO.
(P. E. or TRACT #
(Pro:recFi Name and Address)
(DzUoper's Name and -Address)
We have inspected the grading for Lot$ Cr,60-33 or Phase
of the above-mentioned project. In addition, we have received rough grading
certification from g5~e,,, 74,9m the Soils Engineer,
dated 1-7 1 /,~Jj and from eye
the Supervision Grading Engineer, dated a lq,_fg and are satisfied
that the Irough grading hasbeen completed in accordance with City Standards.
Based on these certifications and our olb-selrvationl- we take no exception to the
issuance of a building permit for Lot~ or Phase of
project from a grading
standpoint.' This release, -however, is not -intended to certify the project from
other engineering concerns including site development, water or sewer availa-
bility, or final grading.
We will need to be advised prior to the issuance of a: Certificate of Occupancy
so that we can verify that final grading and landscaping has been completed
in accordance with the approved plans for the project.
APPROVED:
Project Graeing Inspector Sr. Construction Inspector