HomeMy WebLinkAboutPE 2.89.08; VISTA DE LA VALLE; Engineering Applicationj
Application for Grading Permit NO.
C .0 IT)~: IF CARLSBAD
.ENG4NEER ING- DEPAiRTMENT
1200 Elm Avienue Validation by Finance 438-5541 Department
I /A*") /00 AAAI
Building Permit Plan: Check No. V.L V:~
Mi 990-00
FOR APPLICANT TO FILL IN
Site Address
CT-88-2
Surety Company Bond No.
S,25 —3 9,,0 7S
Legal Description Map No.
1.67-1250-03
Surety Address
Subdiv
9
[sion Name
VISTA-DE LA VALLE
Date Filed Recd" 0 y
9
Owner Phone
...WESCO DEVELOPMENT CORPORATION 213/539-957)
sh deposit Rec'd by Date filed - e2d2 ?A~9
Address 905"
72601 Airport Drive, :Ste 2'50,- -Torrance,
. wing documents are requi red The rollo and,shall b6come'Fa part
of the grading permit when they are approved.
Grading,plans _J~ ~Specifi.cations
Soil report Geologic Report
Drainage structures. Other
Compaction report
Plans by Civil Engineer R.C.E. - Ba-rry -C. Bender 28448 I
__P__ San Ma rcos.92 0 6.9 7447- 800, Address hone
36'5~S-Rancho Santa F e., Rd,#10011-
Soil Engineer R.G.E. Phone
-E.N. Ketchum 26267 944-1,836
ir
Gra ng Pgntractr Phone
oq~
SPECIAL CONDITIONS WHICH ARE MADE
A PART OF THIS PERMIT'
Address operation:
7:00 AM to Sunset, Monday - Friday.
Party responsible for [overall supervision jLrj 11 L4
~'2. Haul routes are to be approved by City Engineer. WESCO DEVELOPMENT-CORPORATION
Proposed I use of
Sindle Family- Residential 9 Adequate provisions shall be made for erosion and siltation
control. Number of'cubic yards
Cut Till,. Import Waste All slopes shall be planted per City Code.
62,506 62,500 0- 0
Pro-posedschedule-6f Starfi. inish.
Operation's (dates) If. r. 5/ -3b T6
5~ -All. fills to be compacted to at -least 90% of optimum
density unless noted otherwise.
1 hereby acknowledge that I have read4he application.and state.that:
the information I have,provided, is correct and agree to comply with
all City ordinances and State laws regulating excavating and grading,
and the-.provisions and conditions of'ahy permit,issued pursuant, to
this application.
Signature of Permittee.
Under City Code Sec. 11.06 170 this grading is:
El REGULAR GRADING --City inspector will make inspections
listed below.
2C CONTROLLED GRADING - Private grading engineer shall
observe work, coordinate tests, make reports.
Owner or authorized agent INSPECTION DATE INSP. SIGNATURE
Initial - site prep.
ENV I RONMENTAL CLEARANCE-
Date . Rougo - prior to dr ains
EIA Log No.
Y C.&O
Final - slopes planted Z7
Compaction reports rec'd. ae Gradin ermit fee $ 990, Plan check fee
do
Ar/ el'.4—
cert. rec'd. Permit ksj~ed
.Ar. II
/jo
UY --- %A!;,-, fcc! Copies: White-Office; Green-Building;
Permit Expiration Date Yellow-inspec'tor; Pink-Permittee; Goiden'rod-Finance
1-44 V/ PA,t:,/ P. _,F
TH IS FORM,WHEN P, ROPERLY VALIDATI RpMtT TO DO THE WORK DESCUED LOISO 7-31
..-;TH,IS PERMIT IS VALID FO.R A SIX (6).MONTH PER IOIJ
207 LA DRIVE TELEPHbNE
5 (619)438-1161 CARCS IFFORNIA92009-4859
L C Offi iffice of t e City Engineer
TRU of Tartsbab
TO: DEVELOPMENT PROCESSING SERVICES
FROM: ENGINEERING INSPECTION.. DIVISION
DATE: lyla fl~ 3 C) /Y~ 0
ROUGH GRADING APPROVAL FOR PROJECT NO.
(P'.E. or TRACT #)
V;,sf. J~, kow
1-7- 015~ '(Developer's Name and Address)
We have inspected the grading for Lots -7 —,,3 11 or Phase
of. the above mentioned project. In addition, we have received rough grading
certification from the Soils Engineer,
dated and from
and are satisfied the Supervision Grading Engineer, dated a
OF
that the rough grading has been completed in accordance with City Standards.
Based on, these certifications and our observation, we tak no exception to the
issuance of a building permit for Lots hSi3v or Phase of
project from a grading
standpoint. This release,- however, is not intended to. certify the project from
other engineering concerns including site development, water or sewer.availa-
bility, or final grading.
We will need to be advised prior to the issuance of a Certificate of Occupancy
so that we can verify that final grading and landscaping has been completed
in accordance with the approved plans for the project.
APPROVED:
Project GrIZing Inspector Sr. Construction Inspector
(Prloject Name and ,-Addres
v. Co -79 / F11 1,11~AAI.1- A ;,-z>,,
ft
C.1-TY OF CA.RLSBAB
GR-ADING INSPECTION CHECK-LIST
FOR PARTIAL SITE RELEASE
PROJECT INSPECTOR: A I DATE: Fe.L. 20
PROJECT ID: 40-a de- /01 GRADING PERMIT NO.:
LOTS REQUESTED FOR RELEASE: I- 014~1 7=31
N/A Not Applicable
complete
0 Incomplete or unacceptable
1 at. 12nd. I
V/ 1. Site access torequested lots adequate and logically grouped
Site -erosion control measures adequate 10- e/4'Ps/a.., Iq .4./ 0 Ix
ADJ . 4S, ,
Overall site adequate for health, safety and welfare of pub-lic.-7 -
Letter of request for partial release submitted
5: 8-1/2i' X 11". site plan showing requested lots submitted
6. Com action report from soils engineer submitted P
V 7. -Engineer-of-work certification of work done and padrelevations
All S. Geologic engineer's letter if unusual geologic or subsurface
7/;] conditions exist
V/ 9. -- Project conditions of approval checkedfor conflicts
10. Can water service be installed prior-to bringing,building
combustibles on stte.
Partial release of grading for the above stated lots is approved
for the purpose of building permit issuance. Issuance of building
permits is still subject to all normal City requirements required
pursuant to the building permit process.
Partial -release of the, site is denied for the following reasons:
PROJECT INSFECTOR DATE PROJECTENGINEER DATE
OR INSPECTOR
ft
CITY OF CARLSBAD
ENGPJCONSTRUCTION GRADING INSPECTION-CHECKLIST
FOR PARTIAL SITE RELEASE -
PROJECT INSPECTOR 41 A / LtA d w ;l DATE: Fe L. 2, 0 I_i_qo
PROJECT ID: yil~-fa de- /A V41te 'l GRADING PERMIT N0&:FF2_.8(?08
LOTS REQUESTED FOR RELEASE: L
N/A = Not Applicable
= Complete
0 = Incomplete or unacceptable
Site access to requested lots adequate and logically grouped
Site erosion control measures adequate M &
Overall site adequate for health, safety and welfare of pub-lic
Letter of request for partial release submitted
5: 8-1/211 X 111, site plan showing requested lots submitted
6.. Compaction report from soils engineer submitted
Engineer-of -work certification of work done and pad ~elevations
Geologic engineer's letter if unusual geologic or subsurface
conditions exist
-Project conditions of approval checked for conflicts
Can water service be installed prior to bringing-building
combustibles an site..
I __/ f
Partial release of grading for the above stated lots is approved
for the purpose of building.permit issuance. Issuance of building
permits is still subjectlo all normal City requirements required
pursuant to the building permit process. I
Partial-release of the site is denied for the following reasons:
PROJECT INSFECTOR DATE PROJECT ENGINEER DATE
SENIOR INSPECTOR
2075 LAS PALMAS DRIVE
CARLSBAD, CALIFORNIA 92009-4859
Office of the City Engineer
TdLi of (fartsbab
TO: DEVELOPMENT PROCESSING SERVICES
FROM: ENGINEERING INSPECTION DIVISION
DATE: t 0
TELEPHONE
(619) 438-1161
ROUGH GRADING APPROVAL FOR PROJECT NO.- RE 2. 9.~.09
(P. E. or TRACT
,roject Nbme and Address
oper-S Name anci Aaares
We have inspected the, grading for Lots or Phase
of the above mentioned project. In addition, we have received rough -grading
certification from Ke_h,444-0. the Soils Engineer,
dated rpt, t,6_ and from J R
the Supervision Grading Engineer, dated and are satisfied
that the rough grading has been completed in accordance with City Standards.
Based on these certifications and our observation, we take no exception to the
issuance of a building permit for Lots or Phase of
project from a grading
standpoint. This release, however, is not intended to certify the project from
other engineering concerns including site development, water or sewer availa-
bility, or final grading.
We will need to be advised prior to the issuance of a Certificate of Occupancy
so that we can verify that.final grading and landscaping has been completed
in accordance with the approved plans for the project.
APPROVED:
V
Project Gading Inspector /S
r. Construction Inspector