Loading...
HomeMy WebLinkAboutPE 2.89.08; VISTA DE LA VALLE; Engineering Applicationj Application for Grading Permit NO. C .0 IT)~: IF CARLSBAD .ENG4NEER ING- DEPAiRTMENT 1200 Elm Avienue Validation by Finance 438-5541 Department I /A*") /00 AAAI Building Permit Plan: Check No. V.L V:~ Mi 990-00 FOR APPLICANT TO FILL IN Site Address CT-88-2 Surety Company Bond No. S,25 —3 9,,0 7S Legal Description Map No. 1.67-1250-03 Surety Address Subdiv 9 [sion Name VISTA-DE LA VALLE Date Filed Recd" 0 y 9 Owner Phone ...WESCO DEVELOPMENT CORPORATION 213/539-957) sh deposit Rec'd by Date filed - e2d2 ?A~9 Address 905" 72601 Airport Drive, :Ste 2'50,- -Torrance, . wing documents are requi red The rollo and,shall b6come'Fa part of the grading permit when they are approved. Grading,plans _J~ ~Specifi.cations Soil report Geologic Report Drainage structures. Other Compaction report Plans by Civil Engineer R.C.E. - Ba-rry -C. Bender 28448 I __P__ San Ma rcos.92 0 6.9 7447- 800, Address hone 36'5~S-Rancho Santa F e., Rd,#10011- Soil Engineer R.G.E. Phone -E.N. Ketchum 26267 944-1,836 ir Gra ng Pgntractr Phone oq~ SPECIAL CONDITIONS WHICH ARE MADE A PART OF THIS PERMIT' Address operation: 7:00 AM to Sunset, Monday - Friday. Party responsible for [overall supervision jLrj 11 L4 ~'2. Haul routes are to be approved by City Engineer. WESCO DEVELOPMENT-CORPORATION Proposed I use of Sindle Family- Residential 9 Adequate provisions shall be made for erosion and siltation control. Number of'cubic yards Cut Till,. Import Waste All slopes shall be planted per City Code. 62,506 62,500 0- 0 Pro-posedschedule-6f Starfi. inish. Operation's (dates) If. r. 5/ -3b T6 5~ -All. fills to be compacted to at -least 90% of optimum density unless noted otherwise. 1 hereby acknowledge that I have read4he application.and state.that: the information I have,provided, is correct and agree to comply with all City ordinances and State laws regulating excavating and grading, and the-.provisions and conditions of'ahy permit,issued pursuant, to this application. Signature of Permittee. Under City Code Sec. 11.06 170 this grading is: El REGULAR GRADING --City inspector will make inspections listed below. 2C CONTROLLED GRADING - Private grading engineer shall observe work, coordinate tests, make reports. Owner or authorized agent INSPECTION DATE INSP. SIGNATURE Initial - site prep. ENV I RONMENTAL CLEARANCE- Date . Rougo - prior to dr ains EIA Log No. Y C.&O Final - slopes planted Z7 Compaction reports rec'd. ae Gradin ermit fee $ 990, Plan check fee do Ar/ el'.4— cert. rec'd. Permit ksj~ed .Ar. II /jo UY --- %A!;,-, fcc! Copies: White-Office; Green-Building; Permit Expiration Date Yellow-inspec'tor; Pink-Permittee; Goiden'rod-Finance 1-44 V/ PA,t:,/ P. _,F TH IS FORM,WHEN P, ROPERLY VALIDATI RpMtT TO DO THE WORK DESCUED LOISO 7-31 ..-;TH,IS PERMIT IS VALID FO.R A SIX (6).MONTH PER IOIJ 207 LA DRIVE TELEPHbNE 5 (619)438-1161 CARCS IFFORNIA92009-4859 L C Offi iffice of t e City Engineer TRU of Tartsbab TO: DEVELOPMENT PROCESSING SERVICES FROM: ENGINEERING INSPECTION.. DIVISION DATE: lyla fl~ 3 C) /Y~ 0 ROUGH GRADING APPROVAL FOR PROJECT NO. (P'.E. or TRACT #) V;,sf. J~, kow 1-7- 015~ '(Developer's Name and Address) We have inspected the grading for Lots -7 —,,3 11 or Phase of. the above mentioned project. In addition, we have received rough grading certification from the Soils Engineer, dated and from and are satisfied the Supervision Grading Engineer, dated a OF that the rough grading has been completed in accordance with City Standards. Based on, these certifications and our observation, we tak no exception to the issuance of a building permit for Lots hSi3v or Phase of project from a grading standpoint. This release,- however, is not intended to. certify the project from other engineering concerns including site development, water or sewer.availa- bility, or final grading. We will need to be advised prior to the issuance of a Certificate of Occupancy so that we can verify that final grading and landscaping has been completed in accordance with the approved plans for the project. APPROVED: Project GrIZing Inspector Sr. Construction Inspector (Prloject Name and ,-Addres v. Co -79 / F11 1,11~AAI.1- A ;,-z>,, ft C.1-TY OF CA.RLSBAB GR-ADING INSPECTION CHECK-LIST FOR PARTIAL SITE RELEASE PROJECT INSPECTOR: A I DATE: Fe.L. 20 PROJECT ID: 40-a de- /01 GRADING PERMIT NO.: LOTS REQUESTED FOR RELEASE: I- 014~1 7=31 N/A Not Applicable complete 0 Incomplete or unacceptable 1 at. 12nd. I V/ 1. Site access torequested lots adequate and logically grouped Site -erosion control measures adequate 10- e/4'Ps/a.., Iq .4./ 0 Ix ADJ . 4S, , Overall site adequate for health, safety and welfare of pub-lic.-7 - Letter of request for partial release submitted 5: 8-1/2i' X 11". site plan showing requested lots submitted 6. Com action report from soils engineer submitted P V 7. -Engineer-of-work certification of work done and padrelevations All S. Geologic engineer's letter if unusual geologic or subsurface 7/;] conditions exist V/ 9. -- Project conditions of approval checkedfor conflicts 10. Can water service be installed prior-to bringing,building combustibles on stte. Partial release of grading for the above stated lots is approved for the purpose of building permit issuance. Issuance of building permits is still subject to all normal City requirements required pursuant to the building permit process. Partial -release of the, site is denied for the following reasons: PROJECT INSFECTOR DATE PROJECTENGINEER DATE OR INSPECTOR ft CITY OF CARLSBAD ENGPJCONSTRUCTION GRADING INSPECTION-CHECKLIST FOR PARTIAL SITE RELEASE - PROJECT INSPECTOR 41 A / LtA d w ;l DATE: Fe L. 2, 0 I_i_qo PROJECT ID: yil~-fa de- /A V41te 'l GRADING PERMIT N0&:FF2_.8(?08 LOTS REQUESTED FOR RELEASE: L N/A = Not Applicable = Complete 0 = Incomplete or unacceptable Site access to requested lots adequate and logically grouped Site erosion control measures adequate M & Overall site adequate for health, safety and welfare of pub-lic Letter of request for partial release submitted 5: 8-1/211 X 111, site plan showing requested lots submitted 6.. Compaction report from soils engineer submitted Engineer-of -work certification of work done and pad ~elevations Geologic engineer's letter if unusual geologic or subsurface conditions exist -Project conditions of approval checked for conflicts Can water service be installed prior to bringing-building combustibles an site.. I __/ f Partial release of grading for the above stated lots is approved for the purpose of building.permit issuance. Issuance of building permits is still subjectlo all normal City requirements required pursuant to the building permit process. I Partial-release of the site is denied for the following reasons: PROJECT INSFECTOR DATE PROJECT ENGINEER DATE SENIOR INSPECTOR 2075 LAS PALMAS DRIVE CARLSBAD, CALIFORNIA 92009-4859 Office of the City Engineer TdLi of (fartsbab TO: DEVELOPMENT PROCESSING SERVICES FROM: ENGINEERING INSPECTION DIVISION DATE: t 0 TELEPHONE (619) 438-1161 ROUGH GRADING APPROVAL FOR PROJECT NO.- RE 2. 9.~.09 (P. E. or TRACT ,roject Nbme and Address oper-S Name anci Aaares We have inspected the, grading for Lots or Phase of the above mentioned project. In addition, we have received rough -grading certification from Ke_h,444-0. the Soils Engineer, dated rpt, t,6_ and from J R the Supervision Grading Engineer, dated and are satisfied that the rough grading has been completed in accordance with City Standards. Based on these certifications and our observation, we take no exception to the issuance of a building permit for Lots or Phase of project from a grading standpoint. This release, however, is not intended to certify the project from other engineering concerns including site development, water or sewer availa- bility, or final grading. We will need to be advised prior to the issuance of a Certificate of Occupancy so that we can verify that.final grading and landscaping has been completed in accordance with the approved plans for the project. APPROVED: V Project Gading Inspector /S r. Construction Inspector