Loading...
HomeMy WebLinkAboutPE 2.89.25; CARLSBAD RESEARCH CENTER LOTS 33-37; Engineering ApplicationApplication for Grading Permit PE NO4- - CITY OF CARLSBAD \\\ ENGINEERING DEPARTMENT 1200 Elm Avenue UK Vq , - Tda ~~yF ii n a n 438-5541 001j, ment Bng Permit Plan Check o. 1393 t ~ r* -25 FOR APPLICANT TO FILL IN ..aO Site Address Surety Company 0 \-Bnd No. Farnsworth Court Afl)tICA) Ig3nO Legal Description Map No Jrety Address Lots 33-37 Map No. 1114 i WE OfFf ic L.cj cfZL%/) 1L aoi' Subdivision Name Date Filed R'd by Carlsbad Research Center _5M 913 e Owner Phone Cash deposit Recd by I Daie filed Wilma. Pacific (714) 851-1411 - Owner's Address The following documents are required and shall become a tart 1301 Dove Street,Suite 300 NJpOrt Beach,CA 92660 of the grading permit when they are approved. V Grading plans Specifications I. Soil report Geologic Report Plans by Civil Engineer R.C.E. Rick Engineering Co. (Barry. Bender) 28448 Address Phone 365 S.Pancho Santa Fe 1d. (619). 744-4800 ,Ste.100 v' Drainage structures . Other Compaction report Soil Engineer R.C.E. Phone San Diego Soils (619) 587-0250 Grading Contractor Phone Ccr+ Co ) LuS&v'i' X 333 SPECIAL CONDITIONS WHICH ARE MADE A PART OF THIS PERMIT Address 'S"', C4 . 'I&CA4CO S Authorized hours of operation: 7:00 AM to Sunset, Monday - Friday. Party responsible for overall 9upervision Haul routes are to be approved by City Engineer. "' . Proposed Use of grade site Light Industrial . Adequate provisions shall be made for erosion and siltation . Nui4nber of cubic yards control. Cut Fill Import Waste All slopes shall be planted per City Code. ,c21o0o ZlSOc Proposed Schedule of Start Finish . 5. All fills to be compacted to at least 90% of optimum Operations (dates) fiqi./ 9 )c .57/6 / ?O density unless noted otherwise. I hereby acknowledge that I have read the application and state that the i?iformation I have provided iet-ect and a r ly with all City ordinances and State IaA re J gexcvating and g74ng, Under City Code Sec. 11.06 170 this grading is: and the provisions and condi on ny p su suant o 2 REGULAR GRADING - City inspector will make inspections this application. listed below. CONTROLLED GRADING - Private grading engineer shall Signature of Permittee observe work, coordinate tests, make reports. a 14 e4 Owner or authorized agent rz~ OfIrL INSPECTION DATE INSP. SIGNATURE tiaI - site prep. ENVIRONMENTAL CLEARANCE - i/ /'? Date Rough to drains - prior ElA Log No: 223 Final - slopes planted By ________________ Compaction reports rec d. /17/jo Grading permit fee$ Plan check fee; J 9!' Permit iued / Pnvateengr.certred. by 'Y24P 'UW) - Date , . ,_.. Permit Expiration Date 0 Yellow-Inspector; Pink-Permittee; Goldenrod-Finanç ,64.. . (jfrtc) THIS FORM WHEN PROPERLY VALIDATED IS A PERMIT TO DO THE WORK DESCRIBED THIS PERMIT IS VALID FOR A SIX(6) MONTH PERIOD 0 91,93 CITY OF CARLSBAD ENGINEERING DEPARTMENT ..n _i • flWflfl I I H PREPARED BY:' -L-k L PROJECT NAME: ft:jj PAi4 DATE:________________ PE TENTATIVE PARCEL MAP FEE . . •. •• • • .. • . • '. . . • • . . • • . . • rJ//Ar ., MAP FEE (_____ LOTS)(PARCEL MAP/FINAL MAP NO. OF LOTS ). . . 14 (EXPEDITED/NOT EXPEDITED) PARCEL MAP EXTENSION FEE • . . . • . • . • , • • , , • , • . • • • . IMPROVEMENT PLAN CHECK FEE: A± r / DEPOSIT WITH SUBMITTAL ? RECEIPT NO, q,2_ILL ( tt)A (L1 )mp,i IMPROVEMENT DESCRIPTION BONDED _VALUE 1 ckc _Mi ' Rep p#rth_Lo" TOTAL: DCflIJTA1C <1 IMPROVEMENT INSPECTION FEE: 'TEN D t V1-Wfi2 _44C If 1Ztyp1) TOTAL: PARK-IN-LIEU FEE (CIRCLE ONE): DWELLING TYPE: SF OR DUPLEX AREA: 1 2 3 4 NUMBER OF UNITS: STREET LIGHT ENERGIZING: ()O13 uc VALUE cq _ OO I PERCENTAGE MF (<4 UNITS) MF (> 4 UNITS) MH X AREA FEETUNIT 775 : Sis fLOL4 L 5.800 LUMEN AT 81.00 9,500 LUMEN AT 111.06 16.000 LUMEN AT 152.10 - 20,000 LUMEN AT 169.38 TOTAL: GRADING PLAN CHECK FEE DEPOSIT ____ RECEIPT NO. iizJ4- (EXPEDITED/NOT EXPEDITED) GRADING PLAN CHECK FEE (22.500 CUBIC YARDS) GRADING CASH DEPOSIT . • . . • . • . • . • . . . • . • • . • . a DUPLICATE TRACING FEE . . • . . • . . • . • . . • • • • . . . . . . STREET SIGN DEPOSIT: AT AT AT TOTAL: 3 3 3 STREET STRIPING DEPOSIT . • . . • . • • . • . . . . . . . . . • . . • ____________________ FRONT LINE OR AREA FEES (TYPE ) . . . • . . • . . • • • • . . • 5 DRAINAGE AREA FEE (AREA NO. _______). . . . . • • . . . • . . . . . . . hDML_ TOTAL ACRES:________ X j P)7 AREA FEE I i Ft LESS VALUE 415&AS OF MASTER DRAINAGE IMPROVEMENTS NOTED IN MASTER DRAINAGE PLAN DOCUMENTS 'I I MULTIPLIED BY CURRENT INFLATION FACTOR. f 2 LINE VALUE X FACTOR AMOUNT X x 1TtTI L_ . 42 X -) DRAINAGE FEE DUE _____________ ADDITIONAL FEES: TYPE: 4J _PR&.'t1..) 47 • • • . •_____________ TYPE' _ V(2- 343 . . . . TOTAL FEES AND DEP,OSITS: . • • 42 __/). (IN ADDITION, A GRADING PERMIT FEE OF c_O4-cf_1LL.'A. IS DUE UPON ISSUANCE OF THE GRADING PERMIT.) c7-7 L ç SUBDIVISION LOG 1 9'' - STAFF ENGINEER: 4 Aj SUBDIVISION NO.: "94,2,5 SUBDIVISION NAME: OWNER/DEVELOPER: pPtIf#( - 3c i A4Z.4e_ __4-flu ADDRESS: t - PHONE: ENGINEER OF WORK: 2.I4K_ FIRM:____________________________________ ADDRESS: PHONE: TENTATIVE MAP APPROVAL: 1ST EXTENSION: 2ND EXTENSION: IMPROVEMENT PLAN NO.: GRADING PLAN NO.: 96 "AS BUILTS" APPROVED: GRADING PERMIT NO.: P R1.2-S EROSION CONTROL •PLAN- BONDS AND AGREEMENTS AGREEMENT TITLE EXPIRATION DATE FAITHFUL PERFORMANCE BOND AMT. LABOR & MATERIALS BOND ANT. MONUMEN- TATION BOND AMT. SECURITY TYPE (CASH, SURETY, LOC) COMMENTS 4it.LC Ii' PrZ-vVE1Y j ?fl?A t4 ____ SURETY COMPANY: ADDRESS: CONTACT: PHONE: EASEMENTS USE LOCATION RECORD NO. qeiz.. fR )t.- /Y'AJ St REPORTS TYPE OF REPORT STATUS (IN, N/A) CHECKED BY Title Report 141 Subdivision_Uuarantee Traverse Caics Hydraulic Calcs Hydrology Calcs Sewer Caics Water System Caics Soils Report WATER DISTRICT: SEWER DISTRICT: SCHOOL DISTRICT:______________________________ PLANNING AREA: DRAINAGE-AREA: SPECIAL ZONES:(ASSESSMENI, THOROUGHFARE, PLANNING ACTION:_____________________________ BRIDGE DISTRICTS: COMMENTS: