HomeMy WebLinkAboutPE 2.89.28; LA COSTA VALLEY TERRACE; Engineering ApplicationProject Engineer A.N.V.
0 Application for Grading Permit PE No. 2.89.28
CITY OF CARLSBAD
ENGINEERING DEPARTMENT
2075 Las Palmas Drive I Validation by Cashier 438-3634
Cti/7RP
Assessors Parcel No. 215-240-12 & 13
FOR APPLICANT TO FILL IN . FOR DEPARTMENT
Site Address
Caringa & ALtisma Way
DATE INITIAL
Secured Agreement Rec'd. Feb. 7, 1990 A.N.V.
Legal Description Map No.
Lots 240 & 241 6730
Ci0Deposft 91212 A1tbOl -810-0000-8232
$5,255 91212 /LCCt# 001-810-0000-8831 Project Name
La Costa Valley Terrace .
Drawing No.
302-2A
Building Permit Plancheck No
Owner Phone
Peter McWilliams 714-250-7010
General Permit Requirements:
All grading and erosion control work shall be done in accordance with
City Ordinances,
Authorized hours of operation: 7:00 a.m. to Sunset, Monday through
Friday, excluding city recognized holidays.
Grading work shall not commence until after the pre-construction
conference has been held with the City Inspector
All off-site haul routes require separate approval by the City Engineer
A right-of-way permit is required for all work done in the city right-of-
way..
Owner's Address '
2101 Business Center Drive Suite 110
Plans by Civil Engineer Phone
Hunsaker & Associates 619-558-4500
Address Phone
10179 Huennekens Street
Soil Engineer R.C.E. Phone
T.Y. Langpap 20427 558-6900
Grading Contractor
Fallon Development
I Phone 436-8700
24 Hr. Phone 741-3609 Instructions: Special Aeqtnrements: Address
2235 Encinitas Blvd. #215 Refund: $1,401.05 Acct # 001-810-0000-8831
Party responsible for overall supervision
James Levindofske Against both Plan Check fees.
Proposed use of grade site
Condominiums Collect: $415.00 due balance of grading permit fee. Acct # 001-810-0000-8232 Number of cubic yards 5% Shrinkage
Cut Fill Import Waste
8000 7600 0 0 Under City Code Sec. 11.06.170 this grading is:
D Regular Grading - City Inspector will make inspections listed below.
D Controlled Grading - private grading engineer shall observe work,
coordinate tests and make reports
Proposed Schedule of Start Finish
Operations (dates)
I hereby acknowledge that I have read the application and state that
the information I have provided is correct and agree to comply with
all City ordinances and State laws regulating excavating and grading,
and the provisions and conditions of any permit issued pursuant to
this application.
Owner or authorized agent
Inspection Date Insp. Initial
Initial - Site Prep. 7
Signature of Permittee
Rough - Grade
Final - Slopes Planted
Compaction Reports Read
ENVIRONMENTAL CLEARANCE
-
Date Private Engr. Cert. Rec'd. EIA Log Na. /4" By
O.K. For Release /(.-'v Grading pe\nit fee $ Jf6.5 00 Plan check fee $3 853.05 ,... ô% Permit Iss
17
Copies:
by lA ACUA Date White. Office; Yellow - Inspector; Pink - Permitte7 . p-
Permit Expiration Date Golden Rod - Finance; Green - Building
THIS FORM WHEN PROPERLY VALIDATED IS A PERMIT TO DO THE WORK DESCRIBED
THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD OR UNTIL THE EXPIRATION DATE SPECIFIED ABOV
p
2O75 LAS PALMAS DRIVE
CARLSBAD, CALIF0NIA920094859
Office of the City Engineer -
atitu uf (art,3tIa1
TO: DEVELOPMENT PROCESSING SERVICES
FROM: ENGINEERING INSPECTION DIVISION
DATE 96
TELEPHONE
(619)438-1161
ROUGH GRADING APPROVAL FOR PROJECT NO. e.s9.5
- (P.E.' or TRACT #)
"J (Project Namd and Address) ' '
(L)eveloper's Name and Address)
We have inspected the. grading for L9/ PAj,ç, .or Phase
of the the above mentioned project. ,In addition, we ,have received rough grading
certification from ,' the Soils Engineer,
dated &&3 ( , and from
the Supervision Grading Engineer, dated
-. (. g , and 'a re satisfied
that the rough grading has been completed in accordance with City Standards.
Based on these certifications and our observation, we' takeno exception to the
issuance of a building permit for Los f'PAA S'7 'or Phase ''/4- of
PIG 1-" project , Ci- ç- .29 from a grading
standpoint. 'This release, however, is not intended to certify; the project from'
other engineering concerns including site development, water or sewer availa-
bility, or final grading.
We will need to be advised prior to the issuance of a Certificate of Occupancy'
so that we can verify that final grading and landscaping has been completed
in accordance with the approved plans for the project
APPRO D:
je—ct ~Wing
,
Inspector
ontionIpector
0,
'4. '. ...,. '.
CITY OF CARLSBAD
GRADING INSPECTION CHECKLIST-
FOR PARTIAL SITE RELEASE
PROJECT INSPECTOR: DATE: ___q.t(_t 0 .
PROJECT ID: GRADING PERMITNO.,: PIE 2'
LOTS REQUESTED FOR RELEASE: F ' • '
N/A Ndt Applicable
Complete
0 Incomplete or unacceptable
1st. 2nd.
1. Site access to requested lots adequate, and logically grouped'
0 / 2 Site erosion control measures adequate :
Overall site adequate for health, ;safety and welfare of pub-lic
Letter of request for partial release submitted
' 0
8-1/2" Xii" site plan showing requested lots submitted
6.. Compaction report from soils engineer submitted
Engineer-of-work certification of wOrk done and pad elevations -
Geologic engineer's letter .if unusual geologic or subsurface
conditions exist
O 9•1 Project conditions of approval checked for conflicts
() 10. Can water .servicebe installed prior. to' bringing building
combustibles on site.
1-7f
Partial release of grading for the' above' stated lots is 'approved
- for the purpose of building permit issuance. Issuance of building
- - permits is still subject to all normal City requirements required
pursuant to the building permit pr0ce35.
': , •
Partial release of the site is denied for the' following. reasons:
0,
,
0 0
FN0JEC1 INS OR
IOFR
: I
NSPECTOR
.
. ',;y 4 . . TELEPHONE
2O75 LAS PALMAS DRIVE . 4Y (619)438-1.161
CARLSBAD, CALIFORNIA 92009-4859 . . . . .
Office of the City. Engineer
Iitj of 11ar1ba1
TO: , DEVELOPMENT PROCESSING SERVICES .;
.• ••. . •' . S
FROM ENGINEERING INSPECTION DIVISION
• DATE: . L , .tgo '
ROUGH GRADING APPROVAL FOR PROJECT NO.
. '' . S. , ' . . '. P.- E. or TRACT #
iris
. . . .J(Project Name and AddressP
TJC 3c ( #15
(Developer's Name and Address)
We have inspected the grading for s ' I 7iRs4. '7' ' or Phase
of the above' mentioned, project. In addition, we have. received rough grading
certification from GEcCc.J . . ' ' , the Soils Engineer, .
dated .L'è and from 1-lu AkR ' ekSbtô'-ac,,
the Supervision Grading Engineer, dated /Y4J 10) , 'and are satisfied
that the rough' grading has been completed in accordance with City Standards.
Based on'these certifications and our observation, we take no exception to the
issuance of a'buildjng per it for øt '/47 or Phase - of
,project 4.4 Jft .
.. " from a grading"
standpoint. This release, however, is not, intended to certify the project from
other engineering concerns including.site development, water or sewer' availa-
, bility, or final grading. • .
•
' ' ' . S • 5'
We will need' to be advised prior to the issuance of a Certificate of Occupancy
so that 'we can verify that final grading and landscaping has, been completed 5'
in accordance with the approved plans for the project
APPROVED:
Protect Gra' I Inspector .. •' • Sr. Construction Inspector .
1
CITY OF CARLSBAD
GRADING", INSPECTION CHECKLIST 0
FOR PARTIAL SITE RELEASE
PROJECT INSPECTOR: (1kP cFFh DATE: (O
PROJECT ID: j_, _de S GRADING PERMIT
LOTS REQUESTED FOR RELEASE:'
N/A = Not Applicable • •.
I Complete 0;
• 0 Incomplete or unacceptable
1st 2nd
•
• /'
/
'
1. Site'acces to requested lots adequate and logically -grouped.
' '
2 Site erosion control measures adequate
3.'Overall site adequate for health, safety and welfare of ubiic
Letter of request for partial release submitted
5 8-1/2" X 11" site plan showing requested lots submitted
O
.
_
/ 6 Compaction report from soils engineer submitted
7. Engineer-of-work certification of work done and pad elevations
8.' Geologic engineer's letter if unusual geologic or subsurface
conditions exist '
9. Project conditions of approval checked for conflicts -
' ,/ • 10. Can water service be installed pridto -bringing building' 7 0 •.combustibleson site. i •
• ',
7
Partial release of.rading for the above' stated lots is approved
for the building issuance., Issuance purpose of permit - of building
• • 'permits is,still subject to. all normal.City requireme'nts required
pursuant,' to the building permit process. -
S
• •
Partial release of the site is denied for the following reasons
*PROjE3T NS TOR. IDA : PROJECT ENGINEER DATE
%E
1
ThItECTOR