HomeMy WebLinkAboutPE 2.89.33; VALLE CALAVERA VILLAGE Q; Engineering Application31-3 Application for Grading Permit I PENO.
CITY OF CARLSBAD
ENGINEERING DEPARTMENT
2075 Las Palmas Drive I
Validation by Finance 438-3550 Department
Building Permit Plan Check No.
FOR APPLICANT TO FILL IN
Site Address Surety Company Bond No.
1VoJtThZ47 ôt71/ 8F6Mt.4 .4f11$ I)4ójA- YP/,+,v h&
Legal Description Map No. Surety Address
fbh'o1'J fATIb --1TO 4#.JcHo
Sudivision Name 0G91' '7'1 04 J4AiDi(rO Date Filed Rec'd by
Owner Phone Cash deposit Rec'd by Date filed
i' W/LLI44,1 tyo,v 60. 101 /-Zoo _________________________________________ Owner's Addres q2,7..t The f>'fng documents are required and shall become a part
1k 'V3;o jJI/49-frL i3 O of the r ing permit when they are yØroved.
plans Specifications
5 il report Geologic Report
Plans by Civil Engineer R.C.E.
J9yç .31/757
/0/7 9 ,t J 5C WO '' o 1)
of
Address Phone Drainage structures ______ Other
Compaction report Soil Engineer R.C.E. Phone
..O. Sods #ijr?..y&— 3O?1 Z YO —'/3z/
Grading Contractor Phone SPECIAL CONDITIONS WHICH ARE MADE
A PART OF THIS PERMIT
Address Authorized hours of operation:
7:00 AM to Sunset, Monday. Friday. Party responsible for overall supervision
Haul routes are to be approved by City Engineer. Pr -use of grade site
NO wL' L.t1IS'J r .4tJiT3 Adequate provisions shall be made for erosion and siltation Number of cubic yards control.
Cut Fill Import Waste
All slopes shall be planted per City Code.
300 1 /;q,qOo 2O(D q 00 -
Proposed Schedule of Start Finish All fills to be compacted to at least 90% of optimum
Operations (dates) density unless noted otherwise.
I hereby acknowledge that I have read the application and state that
the information I have provided is correct and agree to comply with
all City ordinances and State laws regulating excavating and grading,
and the provisions and conditions of any permit issued pursuant to City Code Sec. 11.06 170 this grading is:
U A ULAR GRADING . City inspector will make inspections ,./dider this application. sted below.
CONTROLLED GRADING - Private grading engineer shall Signature of Permittee observe work, coordinate tests, make reports.
INSPECTION DATE INSP. SIGNATURE Owner or authorized agen t/ t_&
hitia! - site prep.
ENVIRONMENTAL CLEARANCE -
Date ____________________ Rough . prior to drains
EIA Log No.
By
Final . slopes planted
Grading permit fee $ Plan check fee $ Compaction reports rec'd.
Permit Issued Private engr. cert. rec'd.
by Date Copies: White-Office; Green-Building;
Permit Expiration Date Yellow-Inspector; Pink-Permittee; Goldenrod-Finance
THIS FORM WHEN PROPERLY VALIDATED IS A PERMIT TO DO THE WORK DESCRIBED
THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD