HomeMy WebLinkAboutPE 2.89.39; CHRYSLER DEALER LOT 7; Engineering ApplicationApplication for Grading Permit 1 PE No. 2.89.39
CITY OF CARLSBAD Draw # 304.3
ENGINEERING DEPARTMENT
2075 Las Palmas Drive
Project Engineer Initial
I
438-3634
Assessors Parcel No. 1. I - bI 2 I 0971110/26/8? 0001 01 05
FOR APPLICANT TO FILL IN FOR DEPARTMENT USE
Site Address . DATE .QTIAL
Lot 7 - Car Country Dr. -!!E-7
Legal Description Map No. aShDePOSif) itiptNo
Lot 7, CT 87-3 Map No. 12242 .60
Project Name Drawing No. I Building Permit Plancheck No.
Carlsbad Tract 87-3
Owner Phone General Permit Requirements:
Chrysler Realty Corp. (714)552-9091
Owner's Address 1. All grading and erosion control work shall be done in accordance with
15 Brookdale, Irvine, CA 92714 City Ordinances,
Plans by Civil Engineer Phone 2. Authorized hours of operation: 7:00 am. to Sunset, Monday through
Kahr and Assoc., Charles S. Kahr Friday, excluding city recognized holidays.
Address Phone (61 9) 3. Grading work shall not commence until after the pre-construction
4401 Manchester Ave. Encinitas, CA 632-1941 conference has been held with the City Inspector
Soil Engineer Joe Franzone R.C.E. Phone 4. All off-site haul routes require separate approval by the City Engineer
Leighton & Assoc. 39552 (619) 292-8030 5. A right-of-way permit is required for all work done in the city right-of-
/GrangCoa7 jP 7Lft. 53 way.
£ li-8 c. _(24HrPhone-74% Special Requirements: 'Address
3 ti. A r2 5-0-
Party responsible for overall supervision C 0 $.Qtt WAL NAM4 1 ATAL rr
Darryl Odum for Chrysler
Proposed use of grade site
Car Dealership
Number of cubic yards
Cut Fill Import Waste
2860 T1080 0 1780 Under City Code Sec. 11.06.170 this grading is:
Proposed Schedule of Start Finish 0 Regular Grading - City Inspector will make inspections listed below.
Operations (dates) Sept 15, 1989 Oct 1 1989 .Controlled Grading - private grading engineer shall observe work,
coordinate tests and make reports
I hereby acknowledge that I have read the application and state that
the information I have provided is correct and agree to comply with Inspection - Date Insp. Initial
all City ordinances and State laws regulating excavating and grading, /2
and the provisions and conditions of any permit issued pursuant to Initial - Site Prep.
this application.
Rough - Grade J/t/
,
/,
6 19
Final - Slopes Planted rorauthonzed age
ENVIRONMENTAL CLEARANCE. &-bo ft Date
EIA Log NO
OBy 0 A4kAA-
3rading rmit fee ! 2%00 CP Plan check fee 94
JWunitAssued
by
Date 10 z, )
,PermitExpifatiDate II - t5 A
Compaction Reports Read
Private Engr. Cert. Rec'd.
O.K. For Release
Copies:
White - Office; Yellow - Inspector; Pink - Permittee
Golden Rod - Finance; Green - Building
THIS FORM WHEN PROPERLY VALIDATED IS A PERMIT TO DO THE WORK DESCRIBED
THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD OR UNTIL THE EXPIRATION DATE SPECIFIED ABOVE.
.•
. TELEPHONE 2O75LASPALMAS DRIVE S. • ..
. (619)438.1161 CA R LS BA D, CA L I FO R N I A 92009-4859
1 .
. :_o.o .
Office of the City. Engineer . . . ..
(1:1. it uf QIarhtha
TO: DEVELOPMENT PROCESSING SERVICES'-
FROM': ENGINEERING INSPECTION DIVISION
DATE: .' ..•• . ..'
.. . :' •,
ROUGH GRADING APPROVAL FOR PROJ ECT NO..
(P .E. or. TRACT #)
/, 7L J127 /L
(Project Name and Address) . •. . . . . . . .• . -.
/ x icez c,,tJs7
(IyeIoper's Name and Address)
2D' C-7 7
We have inspected the grading. for Lots. .7_._or ase
of the above mentioned project. In addition, we have received .rough grading
certification from j_________., .the Soils Engineer,
dated //-2fr'--0_., and from qZ —
the Supervision Grading Engineer, dated //-2-? __, and are satisfied
that .the rough grading has been. completed in accordance with ,City. .Standards.
'Based on these certifications and our observation, we take no exception to the
. • issuance of a building permit for Lots ' or Phase •• of
project ( 'z ____ from a grading
standpoint. This release, however, is not intended to certify the project from .
'other engineering concerns including site. development, water or sewer availa-
bility, .or final grading. . . . . ..
S
.
We will need to be advised prior to the issuance of a Certificate of Occupancy
so that we can verify that final grading and' landscaping has been'completed
in accordance with the approved plans for the project
APPROVED:' 'S •
S
'' ' ' . ' •''
:.. '. .,: ' : '
Project Grading Inspector Sr Construction Inspector