Loading...
HomeMy WebLinkAboutPE 2.89.41; CARLSBAD OAKS LOTS 37B & 37C; Engineering Application- Application for Grading Permit CITY OF CARLSBAD ENGINEERING DEPARTMENT 2075 Las Palmas Drive Project Engineer Initial /4kt'6 1Z,/ti7 438-3634 Assessors Parcel No. 7o9-_O%' ILl 4 1 PE NO.. w Validation by Cashier 12/22/99 0001 01 05 Mr FOR APPLICANT TO FILL IN FOR DEPARTMENT USE Site Address SOUTHWEST CORNER LOKER AVE. FAST & SEA OTTER LN. DATE INITIAL Secured Agreement Rec'd.57 Legal Description Map No. Cash Deposit Receipt No. LOTS 37B,37C TRACT 74-21 .15562 1fCt?JJ_/1-1-07 977Z Project Name Drawing No. I Building Permit Plancheck No. CARLSBAD OAKS -37 3o4 -(,, Owner Phone General Permit Requirements: CARLSBAD OAKSEAST,LTD.714-854-4600 Owner's Address All grading and erosion control work shall be done in accordance with 4199 CAMPUS DRIVE,#830 IRVINE, CA, 92715 City Ordinances, Plans by Civil Engineer Phone Authorized hours of operation: 7:00 am. to Sunset, Monday through _ W.R.HAYNES&CO. 714-852-8626 Friday, excluding city recognized holidays. Address Phone Grading work shall not commence until after the pre-construction 3829 BIRCH STREET NEWPORT BEACH, _CA, _92660 conference has been held with the City Inspector Soil Engineer R.C.E. Phone All off-site haul routes require separate approval by the City Engineer APPLIED GEOITECHNIcAL G.E._919 _71_4-669-8081 A right-of-way permit is required for all work done in the city right-of- Grading Contractor I Phone 71q -3133 way. LuS*P( C 1I'JS1T 24 Hr. Phone Address Special Requirements: tsm L q ftS(T IDt_/14Z/'COS Po...T 1ThTE IAL'T_Lo T Party responsible for overall supervision LUSARDI_ CONSTRUCTION _VPIJ(J )CAP Lt__0AWS ONLY Proposed use of grade site COMMERCIAL Number of cubic yards Cut Fill Import Waste 4600 1300 0 Under City Code Sec. 11.06.170 this grading is: Proposed Schedule of Start Finish 0 Regular Grading - City Inspector will make inspections listed below. Operations (dates) SEPT. 89 SEPT* 90 Controlled Grading - private grading engineer shall observe work, coordinate tests and make reports I hereby acknowledge that I have read the application and state that the information I have provided is correct and agree to comply with Inspection Date Insp.Initial all City ordinances and State laws regulating excavating and grading and the provisions and con ed conditions of," permit iss Initial - Site Prep. this application. Rough - Grade Signature of Owner or authorized agent___________________________________________ Final - Slopes Planted Compaction Reports Read ENVIRONMENTAL CLEARANCE - No-pa o Date EIA Log No. Private Engr. Cert. Rec'd. By O.K. For Release Gradinglermit fee $330_00_ Plan check fee s'5C.CO 9777 wt3 Permitlsed d KCFT Copies: by _ _k._/>/ White - Office; Yellow - Inspector; Pink - Permittee PermitExpirationDate __Q_p1ate Golden Rod - Finance; Green - Building THIS FORM WHEN PROPERLY VALIDATED IS A PERMIT TO DO THE WORK DESCRIBED / THIS PERMIT IS VALID FOR A SIX (6)' MONTH PERIOD OR UNTIL THE EXPIRATION DATE SPECIFIED ABOVE. . . TELEPHONE 2075LASPALMASDRIVE (619)438-1181 CARLSBAD, CALIFORNIA 92009-4859 Office of the City Engineer S •- QIit iif tartntia1 TO: DEVELOPMENT PROCESSING SERVICES FROM ENGINEERING INSPECTION DIVISION DATE ROUGH GRADING APPROVAL FOR PROJECT NO. or TRACT ( i 2!i• - S (Project Name and Address) • rz ps . d. 9e7/S (Develoer's Name and Addres). We have inspected the grading for Lots 37 or, Phase of the the above mentioned project In addition, we have received rough grading certification from/7,7Ze 2. iZ?y . ', the Soils Engineer, dated J1 2//Qq, and from the Supervision Grading Engineer, dated 7 j9), and are satisfied that the rough grading has been completed in accordance with.- City Standards. Based on these certifications and our observation, we take no exception to the issuance of a building permit for Lots. or Phase of • project (4ZeLs/4i2 . from a grading standpoint. This release, however, is not intended to certify the project from other engineering concerns including site development, water or sewer ávaila- bility, or final grading We will need to be advised prior to the issuance of *..a Certificate of Occupancy so that we can verify that final grading and landscaping has been completed S in accordance with the approved plans for the project APPROVED: - .. S • • •; Project Grading. Inspector - 'S r. Constru tion Inspector