Loading...
HomeMy WebLinkAboutPE 2.89.46; CLOUD RESIDENCE; Engineering Applicationell Application for Grading Permit PE NO. -CITY OF CARLSBAD ENGINEERING DEPARTMENT 438-3634 Validation by Cashier Project Engineer Initial . 2075 Las Palmas Drive Assessors Parcel No. 2V _ o 11/22/89 0001 01 05 0 O4 9 1566 FOR APPLICANT TO FILL IN FOR DEPARTMENT USE Site Address DATE lTlAL / Q//5 Secured Agreement Rec'd. n 1 (4 c.. Legal Description Map No. Cash Deposit Receipt No. 6407-'? l-,*1,42_ 'B,°° b b 0 Project Name Drawing No. I Building Permit Plancheck No. ze &ILi,IcI - 44iio 2,O/Th7fi'-' 3C,4 Owner Phone General Permit Requirements: a417v J/ Owner's Address . 1. All grading and erosion control work shall be done in accordance with 4f g City Ordinances, Plans by Civil Engineer Phone 2. Authorized hours of operation: 7:00 am. to Sunset, Monday through 5- Friday, excluding city recognized holidays. - Address Phone 3. Grading work shall not commence until after the pre-construction - conference has been held with the City Inspector V Soil Engineer CE / 4. All off-site haul routes require separate approval by the City Engineer ( Phone \411.t.11AAN Mut04 (714) ((.I Z907- 5. A right-of-way permit is required for all work done in the city right-of- Grading Contractor I Phone '1 5'6 3( way. c 4AA 2.10 d'.. t-1 ..L ii 24 Hr. Phone Special Requirements: Ad&ess 50 v./ VistA \A/t \iTA Pa%responsible,Jqr overall supervision Proposed ike of gracie site Af77v ,4J/79// Number of cubic yards Cut Fill Import Waste /0 Under City Code Sec. 11.06.170 this grading is: Proposed Schedule of Start Finish D Regular Grading - City Inspector will make inspections listed below. Operations (dates) )KControlled Grading - private grading engineer shall observe work, coordinate tests and make reports I hereby acknowledge that I have read the application and state that the information I have provided is correct and agree to comply with Inspection Date Insp. I ial all City ordinances and State laws regulatin exca ting and grading, and the provisions and conditi I/ziI 01 Signature of Permittee sof rmit ed pursuant to Initial - Site Prep. Rough - Grade S. this application. Owner or authorized agent Final - Slopes Planted Compaction Reports Read ENVIRONMENTAL CLEARANCE - Date___________________ Private Engr. Cert. Rec'd. 4 (2.fitç, EIA Log No. By ft A O.K. For Release Plan check fee $ 2 0 Grading permit fee $ '2Y Permit 154ed by I I / 89 by ________________ White - Office; Yellow - Inspector; Pink - Permittee Permit Expiration Date • Golden Rod - Finance; Green - Building THIS FORM WHEN PROPERLY VALIDATED IS A PERMIT TO DO THE WORK DESCRIBED THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD OR UNTIL THE EXPIRATION DATE SPECIFIED ABOVE. . . TELEPHONE 2O75 LAS PALMAS DRIVE . . . . . . . (619)438-1161 CARLSBAD, CALIFORNIA 92009-4859 r Ji' Office of the City Engineer • 11c r I LLLtU NUM ... .. .,.. .: • TO DEVELOPMENT PROCESSING SERVICES" FROM ENGINEERING INSPECTION DIVISION I DATE ROUGH GRADING APPROVAL FOR PROJECT NO ' (P .E. or TRACT #) 1'ATo (Project Name and Address) t41,. . . . . . .. (Developer's Name and Address) t> 04LgL Jgi IiJ We have Inspected the grading for Lots or Phase f4Jfr/ of the above mentioned project In addition, we have received rough grading I I certification from tIL.IAt"l tlUIt'O14 ,j the oi1s1Engineer, I ggq III dated and from the Supervision Grading Engineer, dated I2.JI'J , and are satisfied that the rough grading has been completed in accordance with City Standards.. Based on these certifications and our observation, we take no exception to the issuance of a building permit for Lets or Phase i4/.& of . .•. project Tel 0 0 from a grading .. 0 standpoint. - This release, however, is not intended to certify the project from . other engineering concerns including site development, water or. sewer availa-- 0 bility, or final grading. •0 0 0 . : . . 0 0 . .: We will need to be advised prior to the issuance of a Certificate of Occupancy so that we can verify that final grading and landscaping has been: completed 0 in accordance with the approved plans for the project O . •0 0 •. .. .. .....00 APPROVED Mis ________________ •0 Project Grading I Spector Sr Construction Inspector