Loading...
HomeMy WebLinkAboutPE 2.89.55; VIEWPOINT; Engineering ApplicationApplication for Grading Permit PE NO. / \ CITY OF CARLSBAD / ENGINEERING DEPARTMENT /.q/g 2075 Las Palmas Drive Validation by Cashier Project Engineer Initial f' / 438-3634 0896 10/25/89 0001 01 05 / Assessors Parcel No: 2135 — ___4/O Misc 1330.0 FOR APPLICANT TO FILL IN FOR DEPARTMENT USE Site Address RIJ4 ,-sr DATE INITIAL! Secured Agreement Rec'd. . Legal Description Map No. f.E./op- ___i rizsq&i E.s- 34/ . Cash Deposit 02 eipt No. r€c'J' __#~L _ Re /o6. do Project Name Vjpir' _. Drawing No. I Z%- 3C Building Permit Planche k No. Owner Phone LJEIr4A1.4 VJpo,iJr OIQP /B3-v'91 General Permit Requirements: All grading and erosion control work shall be done in accordance with City Ordinances, Authorized hours of operation: 7:00 am. to Sunset, Monday through Friday, excluding city recognized holidays. Grading work shall not commence until after the pre-construction conference has been held with the City Inspector All off-site haul routes require separate approval by the City Engineer 5.A right-of-way permit is required for all work done in the city right-of- way. Owner's Address L/4//JL/ rL4,..1 . .—.2//7 Plans by Civil Engineer Phone _ Address Phone £a. 0/7 2/ / Soil Engineer R.C.E. Phone 4'-(996 Grading Contractor ,'4246eL)JR. __24 I Phone 2_'.7_/ j/ Hr. Phone ,, Special Requirements: Address ,t111464fZ .s'b.?,4'.1/2 Party responsible for overall supervision 2 o Proposed use of grade site 2?ede,eogj .f' Number of of cubic yards Cut Fill Import Waste /?0 0 0 Under City Code Sec. 11.06.170 this grading is: D Regular Grading - City Inspector will make inspections listed below. 'Controlled Grading - private grading engineer shall observe work, coordinate tests and make reports Proposed Schedule of Start Finish Operations (dates).ao/g9 I hereby acknowledge that I have read the application and state that the information I have provided is correct and agree to comply with all City ordinances and State laws regulating excavating and grading, and the provisions and conditions of any permit issued pursuant to this application. Signature of Permittee Owner or authorized agent _ J ._ I/P Inspection Date lnsp.Initial Initial - Site Prep. Rough - Grade Final - Slopes Planted Compaction Reports Read ENVIRONMENTAL CLEARANCE - Date-/ Ajq EIA Log No. T S3 (f Private ii A By (4 _ Engr. Cert. Rec'd. __________________________ O.K. For Release Grading permit fee $ _ __/'33O Plancheckfee4 7-075 Permit Issued by Data, _ Copies: White - Office; Yellow - Inspector; Pink - Permittee Permit Expiration Date Golden Rod - Finance; Green - Building THIS FORM WHEN PROPERLY VALIDATED IS A PERMIT TO DO THE WORK DESCRIBED THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD OR UNTIL THE EXPIRATION DATE SPECIFIED ABOVE. Q 3- S - /, - TELEPHONE 2O75 LAS PALMAS DRIVE 4' . .' (619)438-1161 CARLS BAD, CAL1F0RN1A92009-4859 'l• ' -• ... Office of the City Engineer JC tiLJ UI irttw " TO DEVELOPMENT PROCESSING SERVICES ' FROM: ENGINEERING INSPECTION DIVISION DATE '' T! ROUGH GRADING APPROVAL FOR PROJECT NO. ía ' (V. E.. or TRACT #) iA/A. '.. (Project Name and Address) ig.• 'A IT7 L4LL p-b.' 'LTh Z (Developer's Name and Address) tv1'1- 1,F 1v1L [( We have inspected 'the grading for Lots'-Z. .7i-4 or Phase 2- .. of the above rnentionedproject. In additiOn, we have received rough grading certification from . . , the Soils Engineer, dated A061 , , and from 'I the Supervision Grading Engineer, dated Ni. t, [1C:and are satisfied that the rough grading has, been completed in accordance with City Standards.. Based on these. certifications and our observation, we take no exception to the Il -u0--"1 i•& issuance of abuiIding permit for 'Lots.i . 7 -u4I or Phase 4 of project \./t\J . . from a grading standpoint. This release, however, is not intended to certify the project from other engineering concerns including site development, water or sewer availa- bility, or final grading. . . . . . . We will need to be advised prior to the issuance of a Certificate Of'Occupancy so that we can verify that final grading and landscaping has been completed in accordance with the approved plans for the'project. APPROVED: ' '': ' ' . . ' " '. .'' • Project Grading , Inspector ., Sr. Construction, Inspector