Loading...
HomeMy WebLinkAboutPE 2.9.25; LA COSTA SOUTH UNIT 5; Engineering Applicationpplica-1-ion for Grading Permits TY OF-CARLSBAD .95 PUBLIC WORKS & BUILDING DEPARTMENT , 1200 Elm Avenue 729-1181 PERMIT NO. I.S (letter code + number) L= I ot SEP 2O-771 b * *8)400 contract FOR APPI WANT TO Fill IN Site Addrs S Surety Bond Bond No. Legal Description Map No. Surety Company 70 600 Subdivision Name Surety Address Owner Phone 4919 0/1 Date Filed Rec'd by )wner's Address V /375—io/ 7Ii'ia-. Cash deposit Rec'd by Date filed la s by Civil Engineer R.C.E.The /-L,l_z7T ( 4/08' following documents are required and shal become a part of the grad permit when they are approved. Grading plans j/o#' Specifications Soil report Vicinity map Address Phone /4c (' te//ld- 1/0 19 Soil Engineer R.C.E. Phone /?'-?2' 60 iv Drainage structures Retaining walls ,Compaction report _Other Grading Contractor Phone LJ- ' C ¼ddress Check if supervised SPECIAL CONDITIONS WHICH ARE MADE grading A PART OF THIS PERMIT arty responsible for overall supervision ci frt'?ypt- t -ey c I. Authorized hours of operation: 7:00 AM to ropoced 'dse of grade site 5:00 PM, Monday-Friday. (i,vri- //-p7 R4 1)6-_ Haul routes are to be approved by City Jumber of cubic yards . Engineer. Cut Fill Import Waste Adequate provisions shall be made for erosion and siltation control. All slopes shall be planted per direction of Parks & Recreation Director. 9. A Total / 3 Compacted fills (yes or no) -e fl-i Proposed Schedule of Start Finish Operations (dates) /.2/77 £14 q77 I hereby acknowledge that I have read the appl ica- tion and state that the information I have provide is correct and agree to comply with all City - INSPECTION DATE INSPECTOR'S SIGNATURE Ground preparation ordinances and State laws regulating excavating and grading, and the provisions and conditions of any permit issued pursuant t this application. Rough grading Compaction report rec'd. Signature of -Planting & drainage Owner or authorized agent_______________________ Final certification rec'd. Grading permit fee $ 84 Work completed Surety bond released Permit Validation by Date_______ Permit Expiration Date '77 THIS FORM WHEN PROPERLY VALIDATED BY SIGNATURE IS A PERMIT TO DO THE WORK DESCRIBED THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD