HomeMy WebLinkAboutPE 2.90.12; MEEHAN RESIDENCE; Engineering ApplicationO 2 — Application for Grading Permit PE NO. __________________
CITY OF CARLSBAD
ENGINEERING DEPARTMENT .
2075 Las Palmas Drive
. Validation by Cashier Project Engineer Initial Z, 438-3634
Assessors Parcel No. 2_10 _03'3
cAOf
_ . . . . .
(5/t1.'9) OCi1 01 05
FOR APPLICANT TO-FILL IN . FOR DEPARTMENT IJ5C •. 195..00
Site Address ,.-y . 7) DATE INITIAL
Secured Agreement Rec'd. _______7
Legal Description Mapp3 d/ '
Cash Deposit . . Receipt
. . __ Project Na216- Res _d 6k j &.
DrawingNo.1 . _Building Permit PlancheckNo.
prl")(,er (cj-7Phone _ reek) M CIA
Owner's
General Permit Requirements:
All grading and erosion control work shall be done in accordance with
City Ordinances, . . S
Authorized hours of operation: 7:00 am. to Sunset, Monday through
Friday, excluding city recognized holidays.
Grading work shall not commence until after the pre-construction
conference has been held with the City Inspector
All off-site haul routes require separate approval by the City Engineer
A right-of-way permit is required for all work done in the city right-of-
way. .
Addles '. .
Za6 c2, h___'J Ci-c'__bcd
Plans "byCivil Engineec It .'. Phone .
O '
.
'dr_ss _r4' _"Phone _____-75•g__/_1.4 3 .
Sol En ineer .. R.C.E. . '
?1-r14 :/ç3.cC _(') _9'4'c)
Grading Contractor I.' • Phàne - .
24 Hr. Phone' - SpecialRequirements: Address . ' ' ..
.
Party responsible for overall supervision
Proposed use of grade site _n (' r ,dJc
Nr of cubic
iut // 73 Fill c5 Import — Waste /1/0
Proposed Schedule of Start . ' 'Finish
Operations (dates) .. '
I hereby acknowledge that I have read the application and state that
the information I have provided is correct'and agree to comply with
all City ordinances and State la,s ,j 'uIting.e avating and grading,
and the provisions and conditionof'any pe it issued pursuant to
this application. /
Signature of Permitte",.
Owner or authorized agent
ENVIRONMENTAL CLEARANCE -
Date - EIA Log No. , By
Grading permit fee $ /95_-- Plan check fee $ /4o)
Under City Code Sec. 11.06.170 this grading is:
0 Regular Grading - City Inspector will make inspections listedbelow.
0 Controlled Grading - private grading engineer shall observe work,
coordinate tests and make reports
Inspection
,Initial - Site Prep.
Rough . Grade
Final - Slopes Planted
Compaction Reports Read
Private Engr: Cert, Rec'd.
O.K. For Release
Permit Issued ' .- . / S J Copies:
by A_t'/t"__'_2V1Date s—,770 White - Office; Yellow - Inspector; Pink- Permittee
Permit Expiration Date _
-
Golden Rod - Finance; Green - Building
THIS FORM WHEN-PROPERLY VALIDATED IS A PERMIT TO DO THE WORK DESCRIBED
THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD OR UNTIL THE EXPIRATION DATE SPECIFIED ABOVE.
I 17 3-
TELEPAONE 2O75 LAS PALMAS DRIVE
. •. 0 (619)438-1161 CARLSBAD, CALIFORNIA 92009-4859
. . . .. 0
Office of the City Engineer - ... .. :
. .
Titu of Q.tar1ntiab
TO: DEVELOPMENT PROCESSING SERVICES
FROM: . ENGINEERING INSPECTION DIVISION.'.
DATE: Je4 3, /990 .'.
ROUGH GRADING APPROVAL FOR PROJECT NO.
(P. E .• o rT'RATC T #)
a esdec.1 /cbaI (Project Name and Address).
Mt.icee- feé6aL,1 L1 C6,na t '/L4' (Ddveloper's Name and .kIdrss)
4pA j
. . . . .
We have inspected the grading for Lot if 2. L6 or Phase '
of the above mentioned project. In addition, we have received rough grading
certification from .A. R. $ay'v't, é. 4'c,q 45,, the Soils Engineer,
dated 24 )39, and from j04 /a /2 , 17.7 t 4Jy'
the Supervision Grading Engineer, dated 27,/9901 and, are satisfied
that the rough grading has been completed in accordance with' City Standards.
Based on these. certifications and our -observation, we take no, exception to the
issuance of a building permit for LotØ M1269 or Phase .of
project if s 2. ?, /..-. . S ' : from a grading -
standpoint. This release, however, is not intended to certify the project from
.other engineering concerns including site development, water.or sewer availa-
bility, or final grading.
We will need to be advised prior to the issuance of a Certificate of Occupancy
so, that we can verify that final grading and landscaping has been completed
in accordance with the approved plans for the project.'
APPROVED:
Project Cr ding Inspector
-
7Sr. ConstructiOn Inspector
-