HomeMy WebLinkAboutPE 2.90.21; ROYALTY; Engineering ApplicationApplication for Grading Permit
CITY OF CARLSBAD
ENGINEERING DEPARTMENT
2075 Las Palmas Drive
438-3634- Project Engineer Initial !!
Assessors Parcel No. 207-063-11
Validation by Cashier
FOR APPLICANT.TO FILL IN.,-
Site Address 3930 SKYLINE ROAD
Carlsbad, Ca 92008
Legal Description portion of lot Map No. 2647
13, Zf Ca rlsbad Highland Map
Project Name
PE 2.90.21.
Owner Phone
TIM ROYALTY (619)729-2420
Owner's Address 4947 Avila Ave.
Carlsbad, CA 92008
Plans by Civil Engineer Phone ( 6 1 9
B 1ngineering, Inc. 431-8213
Address Phone
5833 Sea Lion P1. Carlsbad, CA
Soil Engineer R.C.E. Phone
Art Ber'l 721'
Grading Contractor . Phone
24 Hr. Phone
Address
Party responsible for overall supervision
B £ B Bnginering. Inc.
Proposed use of grade site
Public Road, House Pad
Number of cubic yards
Cut - Fill Import Waste
273L - -' 273
Proposed Schedule of Start Finish
Operations (dates)
I hereby acknowledge that I have read the application and state that
the information I have provided is correct and agree to comply with
all City ordinances and State laws regulating excavating and grading,
and the provisions and conditions of any e it issued pursuant to
this application.
Signature of Permittee
Owner or authorized agertti
ENVIRONMENTAL CLEARANCE -.
Date
EIA Log No.
By
FOR DEPARTMENT USE
DATE INITIAL
Secured Agreement Rec'd.
Cash Deposit - Receipt No.
Drawing No. Building Permit Plancheck No.
General Permit Requirements:
All grading and erosion control work shall be done in accordance with
City Ordinances, -
Authorized hours of operation: 7:00 a.m. to Sunset, Monday through
Friday, excluding city recognized holidays.
Grading work shall not commence until after the pre-construction
conference has been held with the City Inspector
All off-site haul routes require separate approval by the City Engineer
A right-of-way permit is required for all work done in the city right-of-
way.:
Special Requirements:
Under City Code Sec. 11.06.170 this grading is:
o Regular Grading - City Inspector will make inspections listed below.
O Controlled Grading - private grading engineer shall observe work,
coordinate tests and make reports -
Inspection Date Insp. Initial
Initial - Site Prep.
Rough - Grade
Final - Slopes Planted
Compaction Reports Read
Private Engr. Cert. Rec'd.
O.K. For Release
Grading permit fee $ Plan check fee $
Permit Issued Copies:
by Date White - Office; Yellow Inspector; Pink - Permittee
Permit Expiration Date - Golden Rod - Finance; Green - Building
THIS FORM WHEN PROPERLY VALIDATED IS A PERMIT TO DO THE WORK DESCRIBED
THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD OR UNTIL THE EXPIRATION DATE SPECIFIED ABOVE