Loading...
HomeMy WebLinkAboutPE 2.90.21; ROYALTY; Engineering ApplicationApplication for Grading Permit CITY OF CARLSBAD ENGINEERING DEPARTMENT 2075 Las Palmas Drive 438-3634- Project Engineer Initial !! Assessors Parcel No. 207-063-11 Validation by Cashier FOR APPLICANT.TO FILL IN.,- Site Address 3930 SKYLINE ROAD Carlsbad, Ca 92008 Legal Description portion of lot Map No. 2647 13, Zf Ca rlsbad Highland Map Project Name PE 2.90.21. Owner Phone TIM ROYALTY (619)729-2420 Owner's Address 4947 Avila Ave. Carlsbad, CA 92008 Plans by Civil Engineer Phone ( 6 1 9 B 1ngineering, Inc. 431-8213 Address Phone 5833 Sea Lion P1. Carlsbad, CA Soil Engineer R.C.E. Phone Art Ber'l 721' Grading Contractor . Phone 24 Hr. Phone Address Party responsible for overall supervision B £ B Bnginering. Inc. Proposed use of grade site Public Road, House Pad Number of cubic yards Cut - Fill Import Waste 273L - -' 273 Proposed Schedule of Start Finish Operations (dates) I hereby acknowledge that I have read the application and state that the information I have provided is correct and agree to comply with all City ordinances and State laws regulating excavating and grading, and the provisions and conditions of any e it issued pursuant to this application. Signature of Permittee Owner or authorized agertti ENVIRONMENTAL CLEARANCE -. Date EIA Log No. By FOR DEPARTMENT USE DATE INITIAL Secured Agreement Rec'd. Cash Deposit - Receipt No. Drawing No. Building Permit Plancheck No. General Permit Requirements: All grading and erosion control work shall be done in accordance with City Ordinances, - Authorized hours of operation: 7:00 a.m. to Sunset, Monday through Friday, excluding city recognized holidays. Grading work shall not commence until after the pre-construction conference has been held with the City Inspector All off-site haul routes require separate approval by the City Engineer A right-of-way permit is required for all work done in the city right-of- way.: Special Requirements: Under City Code Sec. 11.06.170 this grading is: o Regular Grading - City Inspector will make inspections listed below. O Controlled Grading - private grading engineer shall observe work, coordinate tests and make reports - Inspection Date Insp. Initial Initial - Site Prep. Rough - Grade Final - Slopes Planted Compaction Reports Read Private Engr. Cert. Rec'd. O.K. For Release Grading permit fee $ Plan check fee $ Permit Issued Copies: by Date White - Office; Yellow Inspector; Pink - Permittee Permit Expiration Date - Golden Rod - Finance; Green - Building THIS FORM WHEN PROPERLY VALIDATED IS A PERMIT TO DO THE WORK DESCRIBED THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD OR UNTIL THE EXPIRATION DATE SPECIFIED ABOVE