Loading...
HomeMy WebLinkAboutPE 2.90.31; AVIARA UNIT B 4 SEASONS; Engineering ApplicationProject Engineer Initial_____________________________ Application for Grading Permit CITY OF CARLSBAD ENGINEERING DEPARTMENT 2075 Las Palmas Drive 438-3634 PE NO. Validation by Cashier Assessors Parcel No. FOR APPLICANT TO FILL IN FOR DEPARTMENT USE Site Address . . DATE INITIAL Secured Agreement Rec'd. Legal Description POP-Ttoj L-0 -T Map No. 12-4-10 Cash Deposit Receipt No. Project ame 4- a Drawing No. Building Permit Plancheck No. Owner Phone General Permit Requirements: All gading and erosion control work shall be done in accordance with City Ordinances, Authorized hours of operation: 7:00 am. to Sunset, Monday through Friday, excluding city recognized holidays. Grading work shall not commence until after the pre-construction conference has been held with the City Inspector All off-site haul routes require separate approval by the City Engineer - A right-of-way permit is required for all work done in the city right-of- way. Owner's Address zo ii PAt Ow,Ayz. frcitPog.1T ftPo'' Plans by Civil Engineer Phone (( P 0 rt_,-tpLoc.,ras' Address Phone U 401 W 'WI Sr. 4 2.'ôo O-c,z Soil Engineer R.C.E. Phone (f 'j) ' ,t%iltktiI 4o33 3t - Itty7- Grading Contractor Phone . 24 Hr. Phone Special Requirements: Address Party responsible for overall supervision Proposed use of grade site +1OT-U Numbar 1T of cubic yards Import ç;strIeS Under City Code Sec. 11.06.170 this grading is: 0 Regular Grading - City Inspector will make inspections listed below. 0 Controlled Grading - private grading engineer shall observe work, coordinate tests and make reports Proposed Schedule of Start Finish Operations (dates) I iiwuy acicnuwieuge mat i nave read the application and state that the information I have provided is correct and agree to comply with all City ordinances and State laws regulating excavating and grading, and the provisions and conditions of any permit issued pursuant to this application. Signature of Permittee Owner or authorized agent ENVIRONMENTAL CLEARANCE - Date EIA Log No. By Inspection Date Insp. Initial Initial - Site Prep. Rough - Grade Final - Slopes Planted Compaction Reports Read Private Engr. Cert. Rec'd. O.K. For Release Grading permit fee $ Plan check fee $ Permit Issued Copies: by Date White - Office; Yellow - Inspector; Pink - Permittee Permit Expiration Date . Golden Rod - Finance; Green - Building THIS FORM WHEN PROPERLY VALIDATED IS A PERMIT TO DO THE WORK DESCRIBED THIS PERMIT IS VALID FOR A SIX (6) MONTH PERIOD OR UNTIL THE EXPIRATION DATE SPECIFIED ABOVE.