HomeMy WebLinkAboutPE 2.90.36; YAMANAKA RESIDENCE; Engineering ApplicationPE.
ec)(
CITYOF CARLSBAD
ENGINEERING DEPARTMENT
GRADING PERMIT APPLICATION
SITE ADDRESS: AONPAS Sr. 1-10' t4a n 4CODEP Si.
ASSESSOR'S PARCEL NUMBER(S): i so- os,, 13
LEGAL DESCRIPTION: PORTCLi of= LcT Mp 14o. zicp
PROJECT NAME: Rs€i-cc€
PROJECT ID: 7E-.qo. e,4 4/~'- /C-/#
OWNER: t.Aa 4
ADDRESS 4z2_ ISLE , CA&c.r3 /\O 1 CA oo
PHONE NUMBER: -
CIVIL ENGINEER:Rot4Io C- t'4.\ PE NO.:43 -
ADDRESSCRe1 L&&(C. 4 £UV' 57/S E4.S'AY Vfl.LP
PHONE NUMBER: 571-055,5-
SOILS ENGINEER: -5 C S tT PE NO.: 3 6 03 7
ADDRESS t2O g(V2PA.L€ sr.. O.1 CA. 92 12
PHONE NUMBER: sc— 432..l
GRADING CONTRACTOR: LICENSE NO.:_____________ _STATE
ADDRESS CITY BUSINESS LICENSE NO.____________________
PHONE NUMBER: 24 HOUR PHONE NO.:
PROPOSED USE OF GRADE SITE: L-C FA-tt L -61 0.2LC
GRADING QUANTITIES:CUT t3oc> FILL U3&O IMPORT WASTE çz(
PROPOSED START DATE: lo - Z-( - FINISH DATE:
I hereby acknowledge that I have read the application and state that the information I have provided is correct and agree to comply with all City
ordinances and State Laws requlating excavating and grading, and the provisions and conditions of any permit issued pursuant to this
application.
Signature of Applicant DATE: g9 -.z/ - 90
FOR CITY USE ONLY
Received by:
Entered Into Computer by Date: /2/9O
Permit No. PE ?O. 3 Project Engineer.________
1 Q
-•
-00
Drawing No.3i-IA_Plancheck Fee Deposit S 01Z1151 C:TC A'J
SZV. DLV- DA1E STAMP RECEIVED ate: Approved for Issuance: D___________
bie A cd
07/25/90
-•- 'I'
2075 LAS PALMAS DRIVE
TELEPHONE
CARLSBAD CALIFORNIA 92OO9-4859
S -
(619)438-1161
01/ice of the City Engineer .
itLl of (LuL1,31Juii
TO: DEVELOPMENT PROCESSING SERVICES
FROM: ENGINEERING INSPECTION DIVISION
.DATE:, ' i93
ROUGH GRADING APPROVAL FOR PROJECT NO. 2,
(P.E. or TRACT #)
Yimgina )~q koe!~;ge_,;%ae 4o
ftroi'ect Name and Address)
4i Tsk vp C et
(Developer's Name and Address)
j°OV(Oe.% Lo 7 We have inspected the grading for Lot8,2k 6/!k or Phase
of the above mentioned project. In addition, we have received rough grading
certification from , the Soils Engineer,
dated 4 /33 , and from fo Id
the Supervision Grading Engineer, dated / 195 ,.'and are satisfied
that the rough grading has, been completed in accordance with City Standards.
Based on these certifications and out- olservatiori we take no exception to the
. o r 7 .
issuance of a building permit for Lot,sgfK or Phase of
project 2 . o ' from a grading
standpoint. This release, however, is not intended to certify the project from
other engineering concerns including site development, water or sewer availa-
bility, or final grading.
We will need to be advised prior to the issuance of a Certificate of Occupancy
so that we can verify that final grading and latidscajiitig has been completed
in accordance with the approved plans for the project. 0 -
APPROVED:
- Project C ding Inspector Sr. Construction Inspector