Loading...
HomeMy WebLinkAboutPE 2.91.34; CARLSBAD RESEARCH CENTER LOT 29; Engineering ApplicationCITY OF CARLSBAD ENGINEERING DEPARTMENT GRADING PERMIT APPLICATION SITE ADDRESS: /cocqy Coc.p A. ASSESSORS PARCEL NUMBER(S): 2 / ô 70 ā€” LEGAL DESCRIPTION: ..2', c7 'v0. iā€”i° / /%i./,. Alta CA C.r PROJECT NAME: C 1 -, PROJECT ID: OWNER: C L -ei- ADDRESS 33/0 V1 41 0-e L,'IJe. E. c2ceo,4 CA PHONE NUMBER: 'f'ā€” 7 -0573 CIVIL ENGINEER:CI,Qr4,, 5 1hr PE NO.: ADDRESS 5(0c0 f3; C.,-4f c, 10,2 o'& PHONE NUMBER: - 4L3/.. o/ SOILS ENGINEER:7'i*,e A C-e--o.5 PE NO.: 217707 ADDRESS &3 , -7'f P 0 Trmot S. 5., C/r '/-f PHONE NUMBER: GRADING CONTRACTOR: CONTRACTOR:"i/A STATE LICENSE NO.:____________ ADDRESS CITY BUSINESS LICENSE NO.___________________ PHONE NUMBER: 24 HOUR PHONE NO.: PROPOSED USE OF GRADE SITE: iJc',q I 4717 . GRADING QUANTITIES:CUT 170 FILL 770 IMPORT C' WASTE 0 PROPOSED START DATE: // /,/qj FINISH DATE: - hereby acknowledge that I have read ths applicadon and stat, that the information I have provided is correct and agrec to comply with all City ordinances and State Laws regulating uc.vng and grading, and the provisions said condiUoats of any p.mtlt issuad pursuant to this application. Signature of Applicant DATE: FOR CITY USE ONLY 0 RECEIVED Received by: 5, VaY?.5 Entered Into Computer by qZI Date:-,g AUG 011991 Permit No.1'12. ? /_.3 / Project Engineer: I GFW OF CARLSBAD Drawing NO 2,/--5A Plancheck Fee DeposttP/c2O. _ā€” ENNERNG COUNTER Approved for Issuance: Date: DATE STAMP RECEIVED 07/25/90 CITY OF CARLSBAD Engineering Department WORKSHEET FOR FEES, DEPOSITS AND SECURITIES REQUIRED DURING MAP CHECK AND PLANCHECK PERIOD Project Name:___________________ Prepared By: Date_________ A. FEES AND DEPOSITS REQUIRED WITH FINAL MAP AND PLANS SUBMITTAL (UNLESS OTHERWISE SHOWN ON THE CONDITIONS OF APPROVAL) Computations Amunt Final Parcel/Tract Map Fee ......................, . N, Grading & Erosion Control Plancheck Fee .......IS 33L- (.S//(gj) Landscape & Irrigation Plancheck Fee .......... t . èZfD -E /7/4!) Improvement Plancheck Fee .................... ..( k CMWD Plancheck Fee . ........................ Other_______________________________________ B. FEES REQUIRED PRIOR TO FINAL MAP AND PLANS APPROVAL (UNLESS OTHERWISE SHOWN ON THE CONDITIONS OF APPROVAL) Final Parcel/Tract Map Fee Balance - 4- A Grading & Erosion Control Plancheck Fee Balance . 4f,3dv 4-. *4iuu'm 1z- Landscape & Irrigation Plancheck fee Balance ........S Improvement Plancheck Fee Balance .............. Landscape & Irrigation Inspection Fee ............. f'f.*)PJtr'J&- PPT Improvement Inspection Fee Duplicate Tracing Fee ......................... Street Light Energizing Fee ..................... __ Street Light Connection Fee ...... ................ AVIA- Street Sign Deposit ........................... __ Drainage Area Fee ............................ Park-in-Lieu Fee ..............................,- /4- Other Av11r.4 P.*J tferj'C- (3 Li 7U.Ir)(oo 4' 2j(c- C. SECURITIES REQUIRED PRIOR TO FINAL MAP AND PLANS APPROVAL (UNLESS OTHERWISE SHOWN ON THE CONDITIONS OF APPROVAL) Grading & Erosion Control Security ............... $ 493-317n Grading & Erosion Control Cash Security 17 J Improvement Faithful Performance/Warranty Security Improvement Labor & Materials Security ........... Subdivision Monumentation Security .............. 5. Other Other_______________________________________ .. I D. FEES REQUIRED PRIOR TO GRADING PERMIT ISSUANCE (UNLESS OTHERWISE SHOWN ON THE CONDITIONS OF APPROVAL) Grading Permit Fee .................... I 7± 57 Si)( 4) rc- $ 3 s- Infill Grading Permit Fee/(When Applicable) ......... Other_______________________________________ E. FEES REQUIRED PRIOR TO RIGHT-OF-WAY PERMIT ISSUANCE (UNLESS OTHERWISE SHOWN ON THE CONDITIONS OF APPROVAL) Right-of-Way Permit Fee ....................... Other_______________________________________ F. FEES REQUIRED PRIOR TO BUILDING PERMIT ISSUANCE (UNLESS OTHERWISE SHOWN ON THE CONDITIONS OF APPROVAL) Bridge & Thoroughfare Fee ..................... Public Facilities Fee ........................... Traffic Impact Fee ............................ Facilities Management Fee ...................... Sewer Benefit Area Fee ........................ One-Time Special Development Tax For CFD District No 1 (When Applicable) ............................ Water Service Connection Fee ................... G. OTHER FEES (WHEN APPLICABLE) School Fee ................................. Sewer Permit Fee ............................ Sewer Lateral Charges (Deposit When Applicable) Fire Hydrant Fee (Deposit When Applicable) ........ NOTE: SOME FEES SHOWN HEREON ARE ESTIMATES OF FUTURE FEES. FEE ARE SUBJECT TO CHANGE. IN SOME INSTANCES, DEVELOPER WILL BE REQUIRED TO PAY NEW FEE AT TIME OF COLLECTION. P:\D0CS\MISF0RMSFRM00025.FRM Rev. 01/14/92