Loading...
HomeMy WebLinkAboutPE 2.91.40; YSP LABORATORIES; Engineering ApplicationCITY OF CARLSBAD ENGINEERING DEPARTMENT GRADING PERMIT APPLICATION SITEADORESS: 2 rHA',7 ic7 ASSESSORS PARCEL NUMBER(S): 0 t - O7O ( LEGAL DESCRIPTION: 3'Z 2" /La /3'D PROJECT NAME: PROJECT ID: OWNER: ADDRESS /4 72 c 3 i57 ,o , ig'- O,dt-/ PHONE NUMBER: (7/4) 5 7— Z 9/ 9 CIVIL ENGINEER:iZ.E 5,5~41Z C/-I P121 PE NO.: _? 2 I 4.0 ADDRESS /" Z/ f77Jb' P $4-i"7 ..4-'.-'.-0'- C PHONE NUMBER: SOILS ENGINEER:I C e, 11(le. PE NO.:1/25 ADDRESS 9240 7;y,41e PHONE NUMBER: 6 19 - 5-3 4 -1 ?o 6 GRADING CONTRACTOR: -U 13)c- STATE LICENSE NO.:___________ ADDRESS _CITY BUSINESS LICENSE NO.__________________ PHONE. NUMBER: 24 HOUR PHONE NO.: . PROPOSED USE OF GRADE SITE: GRADING OUANTITIES:CUT )( FILL >( IMPORT WASTE - PROPOSED START DATE: JE,lO2_ FINISHDATE: _ I hereby acknowledge 1"all have read the spIcdon and m lp that the information I have provided is cov.ct and agree to cempty with all City ordinatice and Stats Laws rsquIrlg exeWaking and grading, and the provisions and condioito of any permit issued pursuant to this applicaflen. Signature of Applicant DATE: .FOR CITY USE ONLY Received by:__________ RUPLIVED Entered Into Computer by Q _ - Date: I SEP 2 0 1991 Permit No. P _Z- - __40 Projed Engineer: 5LH Drawing No. Z-4- Fee DepoII CITY OF CARMAD tRdGCOUNTR Approved for Issuance: Date:__ DATE STAMP RECEIVED 07/25/90 %)5? TELEPHONE 2O75 CAS PALMAS DRIVE ' ., (619)438-11G1 CARLSBAD CALIFORNIA 92009 4859 Off/ceo! the City Engineer (!111u tU (L[uthdwIi TO: DEVELOPMENT PROCESSING SERVICES FROM: ENGINEERING INSPECTION DIVISION DATE: 30,'9 ; ROUGH GRADING APPROVAL FOR PROJECT NO. g&. 2 , (1-3. E. or TRACT if) ip L 5 oo (Project Name and A'ddress) Al g5oirgo (Developer's Name an' dddress) We have inspected the grading for Lott 2 2 Hr ///34 o of the above mentioned project. In addition, we have received rough grading certification from (J 'p , the Soils Engineer, dated f99 and from S. the Supervision Grading Engineer, dated Jkw,,2, f99 , and are satisfied that the rough grading has, been completed in accordance with City Standards. Based on these certifications and out- observation, we take no exception to the issuance of a building permit for Lot/ 32 p /1/31 or PI — of project e, 2 9/, 4 , ; from a grading standpoint. This release, however, is not intended to certify the project from other enineering concerns including site development, water or sewer availa- bility, or final grading. 'Ne will need to be advised prior to Ah6 issuance of a Certificate of Occupancy so that we can vri fy that final grading and landscaping has been completed in accordance with the approved plans for the project. APPROVED,: ProjectGr ing Inspector Sr. Construction I i'spector