HomeMy WebLinkAboutPE 2.91.44; AVIARA PA 26 NORTH; Engineering Application-0
CITY OF CARLSBAD
ENGINEERING DEPARTMENT
GRADING PERMIT APPLICATION
SITE ADDRESS: PA 26 N AVIARA PHASE II CT 90-38
ASSESSOR'S PARCEL NUMBER(S): 71Rfl/fl73
LEGAL DESCRIPTION: That. pnrtinn ''7 , T'hip 12 Sr14h, Range 4 Wt,
San Bernardino Meridian- in the ('iiy rif rarlriaad C"wity of saja fljcgr
( Lot 4 Map 4vr Phc IT)
PROJECT NAME: PA 26 N Aviara Phase II
PROJECT ID:
OWNER' Aviara Land Associates Limited Partnership
ADDRESS 2011 P1rmr Airprla-I- pQ2A Suite 206, Carlsbad ,CA
PHONE NUMBER: c619-931-1190
CIVIL ENGINEER:Craig Tackabery PE NO.:43042
ADDRESS La.-YJ-ace Ct. , Suite 100 Carlsbad, CA 92008
_595n
PHONE NUMBER: 619- 431-5722
SOILS ENGINEER. Anthony Belfast PE NO.:43042
ADDRESS 9240 Trade Place, Suite 100, San Diego, CA 92126
PHONE NUMBER: 619-536-1102
GRADING CONTRACTOR:Out to Bid STATE LICENSE NO.:_____________
ADDRESS CITY BUSINESS LICENSE NO.___________________
PHONE NUMBER: 24 HOUR PHONE NO.:
-
PROPOSED USE OF GRADE SITE: Residential
GRADING OUANTITIES:CUT 16,800 FILL 16,800 IMPORT '- WASTE —
PROPOSED START DATE: FINISH DATE:
-
I hereby acknowledge that I have read the application and s*s that the informaon I have provided is correct and agree to comply with all City
ordinances and Sias Laws rqulatin excavating and g. Ing. and the proviseons and condition. o any permit issued pursuant to this
application. .
I DATE:_____
Signature of Applicant_
(/
/ FOR hrry USE ONLY
Received by: •
RECVED
Entered Into Computer by (5?) Date: )I)/)/9 I ' 991 oc
Permit No. PE_21 . _4-4- Project Engineer:
Drawing No.321APIantheck Fee DeposZ ISO .°
bA& STAMP RECEIVED
Approved for Issuance: 'Date:
aeL-&,+_831!
07/25/90
SENT Y:CITY OF CRLSSD :12-28-93 3:2FM 5194388944 619 931 795; 4
CITY OF CARLSBAD - ENGINEERING DEPARTMENT
APPLICATION
GRADING PERMIT
PROJECT NAME: _A-Vi/f.4 PA. '€%Ai PERMIT NUMBER:R I%
PROJECT LOCATION:_*Vf*f.4 Pt(45E iZ 5UT?+ c'F 1Z4 ,P. Je5rt. Z.
ASSESSOR PARCEL NUMBER(S): 215 G 43
PROJECT DESCRIPTION:_Pl' fPT) ciP P-cV/k..- ciTy
OWNER: M-i/fR-A- LJ1 j
Y25 F
ADDRESS:_Zol( Petox't4< ñIFeT 71 r,5r 006 V
PHONE NUMBER:t9) 931 /190
!!! ZOFThIS PROP
I AUTHORIZE THE GRADING ASSOCIATED
CIVIL ENGINEER: P -
I
ADDRESS: 4,i W joyr z500 atô
PHONE NUMBER: 230-4466 V
SOILS ENGINEER: 60TCt(41655, V"AJC. -
ADDRESS: Ave7g/55/L-TiV 3/5 5j7 (14- 9Z/Z
PHONE NUMBER:
GRADING CONTRACTOR: 6_JjçT7 - ti. STATE LICENSE NO,: 48 741() C!Z
ADDRESS: /0/0 L,,tiA V/T7 t-.'M(M CITY BUSINESS LICENSE NO: S3 OO
PHONE NUMBER: -744- Q&40
BASIS OF PERMIT FEES: ______________ cy
GRADING QUANTITIES: -_/, 800 cy cut (61 800 cy fill
- cy remedial -6 - cy excrt11mpo,t
VERIFIED
TOTAL PERMIT FEES: BALANCE DUE: — BY:
I hereby uknawIsde fm hive rs*d the applIgon end Infomon provIded I agree to amply wIth all fsdsrs, atm, and
ordinances, mguladem and pO1IC4S r4edng to ammilon and grading Including, but not limited to, the Federal Endangered Gpeolau Act of 1V3
and any amendments thereto, CM Permit requIrements for tsmthss over fvs foot deep and peomlon. and oondNlom of any permit itou.d
pursuant to this apploo
V
APPUCANT NAME_AVsft PHONE NO. Z-51 -a90
ADDRESS: Z01/ Piftc'W ñ1zji1 z'. 5t7-7 )
APPLJCAWT3 3tON4ITLJRJ (i" ' ),/( --- Y - OAT (2-49/93 -
)OC$IUIUORMMOOOU V REV. /iOl
IIT UI .;Ml1LbMu
Engineering Department
WORKSHEET FCR FEES, DEPOSITS AND SECUR iES REQUIRED
DURING MAP CHECK AND PLANCHECK PERIOD
Project Name: Prepared By:- Lit'frJ Date
A. FEES AND DEPOSITS REQUIRED WITH FINAL MAP AND PLANS SUBMITTAL (UNLESS OTHERWISE SHOWN
ON THE CONDITIONS OF APPROVAL)
Computations Amount
Final Parcel/Tract Map Fee ..................... $ Grading & Erosion Control Plancheck Fee .......... . I O -_
Landscape & Irrigation Plancheck Fee .............
Improvement Plancheck Fee ....................
CMWD Plancheck Fee . ............ .............
Other______________________________________
B. FEES REQUIRED PRIOR TO FINAL MAP AND PLANS APPROVAL (UNLESS OTHERWISE SHOWN ON THE
CONDITIONS OF APPROVAL)
Final Parcel/Tract Map Fee Balance ..............._
Grading & Erosion Control Plancheck Fee Balance . - V -f-- - 2- ( O PP -O -
Landscape & Irrigation Plancheck fee Balance .......TO 3t 9p1?-v11 19-IM Ø i. ____________ Improvement Plancheck Fee Balance ..............
Landscape & Irrigation Inspection Fee ..............ft 1P.-1,mv7 V7L.-.t3tpr4.
Improvement Inspection Fee .................... .
Duplicate Tracing Fee .........................
Street Light Energizing Fee .....................
Street Light Connection Fee ......................
Street Sign Deposit ...........................
Drainage Area Fee ...................... ......
Park-in-Lieu Fee ...............................
Other____________________________________
C. SECURITIES REQUIRED PRIOR TO FINAL MAP AND PLANS APPROVAL (UNLESS OTHERWISE SHOWN ON
THE CONDITIONS OF APPROVAL)
1. Grading & Erosion Control Security ............ ...._______________________ $ 132)710
2. Grading & Erosion Control Cash Security ...........
3. Improvement Faithful Performance/Warranty Security...
4. Improvement Labor & Materials Security ...........
5. Subdivision Monumentatlon Security ...............
Other______________________________________
D. FEES REQUIRED PRIOR TO GRADING PERMIT ISSUANCE (UNLESS OTHERWISE SHOWN ON THE
CONDITIONS OF APPROVAL)
Grading Permit Fee ........................... . $ '7O
mt ill Grading Permit Fee/(When Applicable) .........
Other______________________________________
E. FEES REQUIRED PRIOR TO RIGHT-OF-WAY PERMIT ISSUANCE (UNLESS OTHERWISE SHOWN ON THE
CONDITIONS OF APPROVAL)
Right-of-Way Permit Fee ........................
Other_______________________________________
F. FEES REQUIRED PRIOR TO BUILDING PERMIT ISSUANCE (UNLESS OTHERWISE SHOWN ON THE
CONDITIONS OF APPROVAL)
Bridge & Thoroughfare Fee .....................
Public Facilities Fee ...........................
Traffic Impact Fee ............................
Facilities ManagementFee ......................
S. Sewer Benefit Area Fee ........................_______________________
6. One-Time Special Development Tax For CFD District No 1
(When Applicable) ............................
7. Water Service Connection Fee ....................
G. OTHER FEES (WHEN APPLICABLE)
School Fee ....................................
Sewer Permit Fee ............................
Sewer Lateral Charges (Deposit When Applicable)
Fire Hydrant Fee (Deposit When Applicable) ........
NOTE: SOME FEES SHOWN HEREON ARE ESTIMATES OF FUTURE FEES. FEE ARE SUBJECT TO CHANGE. IN
SOME INSTANCES, DEVELOPER WILL BE REQUIRED TO PAY NEW FEE AT TIME OF COLLECTION.
P:\D0CS\MISF0RMS\FRM00025.FRM Rev. 01/14192