HomeMy WebLinkAboutPE 2.92.01; TIENDA DE LA ESQUINA; Engineering ApplicationCITY OF CARLSBAD
ENGINEERING DEPARTMENT
GRADING PERMIT APPLICATION
SITE ADDRESS: SOUTH—EAST CORNER OF RANCHO SANTA FE ROAD AND CAMINO DE LOS COCHES
ASSESSOR'S PARCEL NUMBER(S): 255-031-20
LEGAL DESCRIPTION: LOT 1 PARCEL MAP NO. 13970, CITY OF CARLSBAD, COUNTY OF
SAN DIEGO, STATE OF CALIFORNIA, SEPTEMBER 25, 1985,
FILE NO. 85-355261
PROJECT NAME: TIENDA DE LA ESQUINA
PROJECT ID: CT 91-6
OWNER: LA COSTA ESTANCIA LIMITED PARTNERSHIP, C/O CUNNINGHAM BARISIC DEVELOPMENT CORP
ADDRESS 340 SOUTH FLOWER STREET, ORANGE, CA 92668
PHONE NUMBER: (714) 634-3839
CIVIL ENGINEER:ROBERT L. DEAN PE NO.: .43366
ADDRESS 5620 FRIARS ROAD, SAN DIEGO, CA 92110
PHONE NUMBER: (619) 291-0707
SOILS ENGINEER:DANIELADLER _PE NO.: 36037
ADDRESS 6280 RIVERDALE STREET, SAN DIEGO, CA 92120
PHONE NUMBER: . (619) 280-4321
GRADING CONTRACTOR: CUNNINGHAN—BARISICDEV. CORP. STATE LICENSE NO.: 497245
ADDRESS 340 S.FLOWERSTREET,ORANGE CITY BUSINESS LICENSE NO.__________________
PHONE NUMBER: (714) 634-3839 24 HOUR PHONE NO.:
PROPOSED USE OF GRADE SITE: SHOPPING CENTER
GRADING QUANTITIES:CUT 28,000 FILL 28,000 IMPORT NONE WASTE NONE
PROPOSED START DATE: SEPTEMBER 1, 1992 FINISH DATE: NOVEMBER 30, 1992
I hereby acknowledge that I have read the application and state that the information I have provided is correct and agree to comply with all City
ordinances and State Laws requlating excavating and grading, and the provisions and conditions of any permit issued pursuant to this
application.
Signature of Applicant_.DATE:Z
FOR CITY USE ONLY
Received by: . : . ..
Entered Into Computer by Date: ________ awn
Permit No. .2 .. . i Project Engineer:________ .. . VED
Drawing No. 3 7J7-24 Plancheck Fee Deposit 7 -z-.' ' .. JAN 08 1992
Approved for Issuance: Date: . DIT8MP RECEIVED
CARLsRA
I.'UQ(4JJ
07/25/90
P1MNP 5'l5Pø
TO FINAL MAP Al
V
.,i I I Jr LoAnLoDAu
Engineering Department
WORKSHEET FIR FEES, DEPOSITS AND SECU iTIES REQUIRED
DURING MAP CHECK AND PLANCHECK PERIOD
Project Jame: J Pr DE I ífr .5(1kf i'Jfrc Prepared By: )L--O Date_________
A. FEES AND DEPOSITS REQUIRED WITH FINAL MAP AND PLANS SUBMITTAL (UNLESS OTHERWISE SHOWN
ON THE CONDITIONS OF APPROVAL) 6411,
Flflal Parôel/Tract Map Fee .....................
Grading & Erosloh Cohtroi Plancheck Fee ..........
Landscape & Irrigation Plancheck Fee .....
Improvement Plancheck Fee ....................
CMWD Plancheck Fee........................ Other f 3. LI.._r _ iii_f_1)
t!4iIDw'*f _I&(('ZIt\_FE_LPAfTIPr9::
Computations Amount
$-2_Ci_fcf
.: O5*(3o Ic2_ (687;
1 _44-.
B. FEES REQUIRED PRIOR TO FINAL MAP AND PLANS APPROVAL (UNLESS OTHERWISE SHOWN ON THE
CONDITIONS OF APPROVAL)
C.
Final Parcel/Tract Map Fee Balance ............
Grading & Erosion Control Plancheck Fee Balance
Landscape & Irrigation Plancheck fee improvement Plancheck Fee Balance LP5 ).. J Landscape & Irrigation Inspection Fee ... Improvement Inspection Fee .. f2..S F) ........ Duplicate Tracing Fee ...................(f3 Street Light Energizing Fee ........
Street Light Connection Fee.. .4....- Street Sign Deposit ..............- Drainage Area Fee ............ ft/Ce .......
Park-Jo-Lieu Fee .. . .i. .' ..4M1P. 't1 . KU.
Othdi11&l)ITIOIr -L IrPV.VE1flJT IcecIm)
0P1INl WLA. PLANS APPROVA
)_g(et
$_-o-
_L -t-rR..
I C7, t M*dltr)
rj,4 L92
_Z FeL3 -0 -..
V$T )SSUftt (FFP t) -')-
F51)(°.
oq.) _
prPle
(UNLESS OTHERWISE SHOWN ON THE pss& pp4.37L.
Grading & Erosion Control Security _-
Grading & Erosion Control Cash Security ............
Improvement Faithful Performance/Warranty S9curlty (5)
Improvement Labor & Materials Security . . .( .1?-s ). Subdivision Monumentatlon Security .............. jpJ
5. Other f'oL- c4T1(l- t'4 Mtrf _F-ft -E
POL- _'T(2-° L_A43U / ry T
_Ivii-1-M3 -
0. FEES REQUIRED PRIOR TO GRADING PERMIT ISSUANCE (UNLESS OTHERWISE SHOWN ON THE
CONDITIONS OF APPROVAL)
CY4 + Grading Permit Fee ........ 9pç $_i
Other_____________________
PA C k,J6E. PP( kT PE1l.l'YttT ttANC -
E. FEES J1EQUIRED PRIOR TO RIGHT-OF-WAY PERMIT ISSUANCE (UNLESS OThERWISE SHOWN ON THE
CONDITIONS OF APPROVAL)
Right-of-Way Permit Fee --
Other_____________________________
F. FEES REQUIRED PRIOR TO BUILDING PERMIT ISSUANCE (UNLESS OTHERWISE SHOWN ON THE
CONDITIONS OF APPROVAL)
H. bridgeA Thoroughfare Fee ......................
2. Public Facilities Fee ..........................
3. School Fee . . . . . . . .........................
4. Traffic Impact Fee . .. .........................
5.' Facilities Management Fee.. ..................
Sewer Benefit Area Fee ........................ 7. Sewer Service Connection Fee .................. S. Sewer Lateral Fee .............
Fire I-Ivdrarit Fee ............. . . . . . ........... Other
NOTE: SOME FEESSHOWN HEREON ARE ESTIMATES OF FUTURE FEES. FEE ARE SUBJECT TO CHANGE. IN SOME INSTANCES, DEVELOPER
WILL BE REQUIRED TO PAY NEW FEE AT TIME OF COLLECTION. -