Loading...
HomeMy WebLinkAboutPE 2.92.01; TIENDA DE LA ESQUINA; Engineering ApplicationCITY OF CARLSBAD ENGINEERING DEPARTMENT GRADING PERMIT APPLICATION SITE ADDRESS: SOUTH—EAST CORNER OF RANCHO SANTA FE ROAD AND CAMINO DE LOS COCHES ASSESSOR'S PARCEL NUMBER(S): 255-031-20 LEGAL DESCRIPTION: LOT 1 PARCEL MAP NO. 13970, CITY OF CARLSBAD, COUNTY OF SAN DIEGO, STATE OF CALIFORNIA, SEPTEMBER 25, 1985, FILE NO. 85-355261 PROJECT NAME: TIENDA DE LA ESQUINA PROJECT ID: CT 91-6 OWNER: LA COSTA ESTANCIA LIMITED PARTNERSHIP, C/O CUNNINGHAM BARISIC DEVELOPMENT CORP ADDRESS 340 SOUTH FLOWER STREET, ORANGE, CA 92668 PHONE NUMBER: (714) 634-3839 CIVIL ENGINEER:ROBERT L. DEAN PE NO.: .43366 ADDRESS 5620 FRIARS ROAD, SAN DIEGO, CA 92110 PHONE NUMBER: (619) 291-0707 SOILS ENGINEER:DANIELADLER _PE NO.: 36037 ADDRESS 6280 RIVERDALE STREET, SAN DIEGO, CA 92120 PHONE NUMBER: . (619) 280-4321 GRADING CONTRACTOR: CUNNINGHAN—BARISICDEV. CORP. STATE LICENSE NO.: 497245 ADDRESS 340 S.FLOWERSTREET,ORANGE CITY BUSINESS LICENSE NO.__________________ PHONE NUMBER: (714) 634-3839 24 HOUR PHONE NO.: PROPOSED USE OF GRADE SITE: SHOPPING CENTER GRADING QUANTITIES:CUT 28,000 FILL 28,000 IMPORT NONE WASTE NONE PROPOSED START DATE: SEPTEMBER 1, 1992 FINISH DATE: NOVEMBER 30, 1992 I hereby acknowledge that I have read the application and state that the information I have provided is correct and agree to comply with all City ordinances and State Laws requlating excavating and grading, and the provisions and conditions of any permit issued pursuant to this application. Signature of Applicant_.DATE:Z FOR CITY USE ONLY Received by: . : . .. Entered Into Computer by Date: ________ awn Permit No. .2 .. . i Project Engineer:________ .. . VED Drawing No. 3 7J7-24 Plancheck Fee Deposit 7 -z-.' ' .. JAN 08 1992 Approved for Issuance: Date: . DIT8MP RECEIVED CARLsRA I.'UQ(4JJ 07/25/90 P1MNP 5'l5Pø TO FINAL MAP Al V .,i I I Jr LoAnLoDAu Engineering Department WORKSHEET FIR FEES, DEPOSITS AND SECU iTIES REQUIRED DURING MAP CHECK AND PLANCHECK PERIOD Project Jame: J Pr DE I ífr .5(1kf i'Jfrc Prepared By: )L--O Date_________ A. FEES AND DEPOSITS REQUIRED WITH FINAL MAP AND PLANS SUBMITTAL (UNLESS OTHERWISE SHOWN ON THE CONDITIONS OF APPROVAL) 6411, Flflal Parôel/Tract Map Fee ..................... Grading & Erosloh Cohtroi Plancheck Fee .......... Landscape & Irrigation Plancheck Fee ..... Improvement Plancheck Fee .................... CMWD Plancheck Fee........................ Other f 3. LI.._r _ iii_f_1) t!4iIDw'*f _I&(('ZIt\_FE_LPAfTIPr9:: Computations Amount $-2_Ci_fcf .: O5*(3o Ic2_ (687; 1 _44-. B. FEES REQUIRED PRIOR TO FINAL MAP AND PLANS APPROVAL (UNLESS OTHERWISE SHOWN ON THE CONDITIONS OF APPROVAL) C. Final Parcel/Tract Map Fee Balance ............ Grading & Erosion Control Plancheck Fee Balance Landscape & Irrigation Plancheck fee improvement Plancheck Fee Balance LP5 ).. J Landscape & Irrigation Inspection Fee ... Improvement Inspection Fee .. f2..S F) ........ Duplicate Tracing Fee ...................(f3 Street Light Energizing Fee ........ Street Light Connection Fee.. .4....- Street Sign Deposit ..............- Drainage Area Fee ............ ft/Ce ....... Park-Jo-Lieu Fee .. . .i. .' ..4M1P. 't1 . KU. Othdi11&l)ITIOIr -L IrPV.VE1flJT IcecIm) 0P1INl WLA. PLANS APPROVA )_g(et $_-o- _L -t-rR.. I C7, t M*dltr) rj,4 L92 _Z FeL3 -0 -.. V$T )SSUftt (FFP t) -')- F51)(°. oq.) _ prPle (UNLESS OTHERWISE SHOWN ON THE pss& pp4.37L. Grading & Erosion Control Security _- Grading & Erosion Control Cash Security ............ Improvement Faithful Performance/Warranty S9curlty (5) Improvement Labor & Materials Security . . .( .1?-s ). Subdivision Monumentatlon Security .............. jpJ 5. Other f'oL- c4T1(l- t'4 Mtrf _F-ft -E POL- _'T(2-° L_A43U / ry T _Ivii-1-M3 - 0. FEES REQUIRED PRIOR TO GRADING PERMIT ISSUANCE (UNLESS OTHERWISE SHOWN ON THE CONDITIONS OF APPROVAL) CY4 + Grading Permit Fee ........ 9pç $_i Other_____________________ PA C k,J6E. PP( kT PE1l.l'YttT ttANC - E. FEES J1EQUIRED PRIOR TO RIGHT-OF-WAY PERMIT ISSUANCE (UNLESS OThERWISE SHOWN ON THE CONDITIONS OF APPROVAL) Right-of-Way Permit Fee -- Other_____________________________ F. FEES REQUIRED PRIOR TO BUILDING PERMIT ISSUANCE (UNLESS OTHERWISE SHOWN ON THE CONDITIONS OF APPROVAL) H. bridgeA Thoroughfare Fee ...................... 2. Public Facilities Fee .......................... 3. School Fee . . . . . . . ......................... 4. Traffic Impact Fee . .. ......................... 5.' Facilities Management Fee.. .................. Sewer Benefit Area Fee ........................ 7. Sewer Service Connection Fee .................. S. Sewer Lateral Fee ............. Fire I-Ivdrarit Fee ............. . . . . . ........... Other NOTE: SOME FEESSHOWN HEREON ARE ESTIMATES OF FUTURE FEES. FEE ARE SUBJECT TO CHANGE. IN SOME INSTANCES, DEVELOPER WILL BE REQUIRED TO PAY NEW FEE AT TIME OF COLLECTION. -