HomeMy WebLinkAboutPIP 00-01; MV Technical; Planned Industrial Permit (PIP) (10)- .City of Carlsbad
December 13,2000
Kenneth D Smith Architects
Suite B
435 W Bradley Ave
El Cajon CA 92028
SUBJECT: PIP 00-01 - MV TECHNICAL
Thank you for applying for Land Use Permits in the City of Carlsbad. The Planning Department
has reviewed your Planned Industrial Permit, application no. PIP 00-01, as to its completeness
for processing.
The application is complete, as submitted. Although the initial processing of your application
may have already begun, the technical acceptance date is acknowledged by the date of this
communication. The City may, in the course of processing the application, request that you
clarify, amplify, correct, or otherwise, supplement the basic information required for the
application. In addition, you should also be aware that various design issues may exist. These
issues must be addressed before this application can be scheduled for a hearing. The Planning
Department will begin processing your application as of the date of this communication.
Please contact your staff planner, Michael Grim, at (760) 602-4623, if you have any questions or
wish to set up a meeting to discuss the application.
Planning Director
MJH:MG:mg
C: Chris DeCerbo
File Copy
Data Entry
Planning Aide
1635 Faraday Avenue Carlsbad, CA 92008-7314 (760) 602-4600 FAX (760) 602-8559 www.ci.carlsbad.ca.us @
ISSUES OF CONCERN
NO. PIP 00-01 - MV TECHNICAL
Planning:
1. Please provide a roof plan, indicating the location of all roof-mounted equipment and
vents as well as parapet height. A cross-section view is also helpful in showing
adequate screening of roof-mounted equipment.
2. Please indicate the location of the interior employee eating area. The project will be
conditioned to indicate a minimum interior employee eating area on the building permit.
Engineering:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
On the site plans, depict the limits of the proposed public waterline system required to
serve the project. Indicate a preliminary horizontal alignment per Carlsbad Municipal
Water District Standards.
On the site plan, add the date of preparation of the plans.
On the site plan, revise the average daily traffic (ADT) figures on sheet 1 per the latest
SANDAG requirements.
On the site plan, add a typical street section for Camino Vida Roble.
On the site plan, depict all easements listed inn the title report (see item 9 of the title
report).
On the site plan, depict all adjacent (medium to high use) driveways and identify
horizontal distances between their centerlines (intersection spacing).
On the site plan, depict all facilities in Camino Vida Roble serving the project.
Provide a hydrology report that addresses the anticipated storm flows generated and/or
intercepted by the project. The report should provide what measures are required top
ensure that post-development run-off does not exceed the pre-development run-off
flows.
Provide a recent Geotechnical Report identifying specific recommendations for this
project. The Report should identify the limits of remedial earthwork anticipated onsite, if
any.
On the conceptual grading plan, include the quantity of remedial earthwork, if any.
Revise the plans to additional measures to address pollutant run-off. As an example,
incorporate curb openings with grass-lined swales leading to catch basins together with
fossil filters.
Revise the plans to incorporate measures to ensure that post-development run-off does
not exceed pre-development run-off.
Revise the plans so they are 24"x36" in size (typical).
.
Y 14.
15.
16.
/”
17.
18.
19.
20.
21.
22.
Provide a curb to protect the compact cars where the truck executes a turn around the
building.
The proposed waterline system must be looped and both connections should be located
in the proposed driveway entrances.
Clarify the location of the irrigation service using the legend symbols and identify the
approximate demand (in GPM) at the point of connection.
Clarify how storm run-off will be intercepted and conveyed from the 30-foot high rear
slopes.
Depict the line-of-sight at both project entrances using Caltrans Standards. Verify no
conflicts exist.
Add earthwork totals, EDUs (sewer), GPM (potable), and GPM (recycled) to the site
plan.
v pi5
Depict the line-of-sight to the landscape plan to verify no conflicts.
Add water services to the rear portion of the site to allow water circulation in the looped
water system for water quality purposes.
A red-lined check print is enclosed for the applicant’s use in making the requested
revisions. This check print must be returned with the pian revisions to facilitate
continued staff review.