Loading...
HomeMy WebLinkAboutPIP 00-01; MV Technical; Planned Industrial Permit (PIP) (10)- .City of Carlsbad December 13,2000 Kenneth D Smith Architects Suite B 435 W Bradley Ave El Cajon CA 92028 SUBJECT: PIP 00-01 - MV TECHNICAL Thank you for applying for Land Use Permits in the City of Carlsbad. The Planning Department has reviewed your Planned Industrial Permit, application no. PIP 00-01, as to its completeness for processing. The application is complete, as submitted. Although the initial processing of your application may have already begun, the technical acceptance date is acknowledged by the date of this communication. The City may, in the course of processing the application, request that you clarify, amplify, correct, or otherwise, supplement the basic information required for the application. In addition, you should also be aware that various design issues may exist. These issues must be addressed before this application can be scheduled for a hearing. The Planning Department will begin processing your application as of the date of this communication. Please contact your staff planner, Michael Grim, at (760) 602-4623, if you have any questions or wish to set up a meeting to discuss the application. Planning Director MJH:MG:mg C: Chris DeCerbo File Copy Data Entry Planning Aide 1635 Faraday Avenue Carlsbad, CA 92008-7314 (760) 602-4600 FAX (760) 602-8559 www.ci.carlsbad.ca.us @ ISSUES OF CONCERN NO. PIP 00-01 - MV TECHNICAL Planning: 1. Please provide a roof plan, indicating the location of all roof-mounted equipment and vents as well as parapet height. A cross-section view is also helpful in showing adequate screening of roof-mounted equipment. 2. Please indicate the location of the interior employee eating area. The project will be conditioned to indicate a minimum interior employee eating area on the building permit. Engineering: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. On the site plans, depict the limits of the proposed public waterline system required to serve the project. Indicate a preliminary horizontal alignment per Carlsbad Municipal Water District Standards. On the site plan, add the date of preparation of the plans. On the site plan, revise the average daily traffic (ADT) figures on sheet 1 per the latest SANDAG requirements. On the site plan, add a typical street section for Camino Vida Roble. On the site plan, depict all easements listed inn the title report (see item 9 of the title report). On the site plan, depict all adjacent (medium to high use) driveways and identify horizontal distances between their centerlines (intersection spacing). On the site plan, depict all facilities in Camino Vida Roble serving the project. Provide a hydrology report that addresses the anticipated storm flows generated and/or intercepted by the project. The report should provide what measures are required top ensure that post-development run-off does not exceed the pre-development run-off flows. Provide a recent Geotechnical Report identifying specific recommendations for this project. The Report should identify the limits of remedial earthwork anticipated onsite, if any. On the conceptual grading plan, include the quantity of remedial earthwork, if any. Revise the plans to additional measures to address pollutant run-off. As an example, incorporate curb openings with grass-lined swales leading to catch basins together with fossil filters. Revise the plans to incorporate measures to ensure that post-development run-off does not exceed pre-development run-off. Revise the plans so they are 24"x36" in size (typical). . Y 14. 15. 16. /” 17. 18. 19. 20. 21. 22. Provide a curb to protect the compact cars where the truck executes a turn around the building. The proposed waterline system must be looped and both connections should be located in the proposed driveway entrances. Clarify the location of the irrigation service using the legend symbols and identify the approximate demand (in GPM) at the point of connection. Clarify how storm run-off will be intercepted and conveyed from the 30-foot high rear slopes. Depict the line-of-sight at both project entrances using Caltrans Standards. Verify no conflicts exist. Add earthwork totals, EDUs (sewer), GPM (potable), and GPM (recycled) to the site plan. v pi5 Depict the line-of-sight to the landscape plan to verify no conflicts. Add water services to the rear portion of the site to allow water circulation in the looped water system for water quality purposes. A red-lined check print is enclosed for the applicant’s use in making the requested revisions. This check print must be returned with the pian revisions to facilitate continued staff review.