Loading...
HomeMy WebLinkAboutPIP 00-05; Carlsbad Airport Center Lot 23; Planned Industrial Permit (PIP) (14)CARLSBAD FIRE DEPARTMENT Fire Protection Services PRELIMINARY REVIEW REPORT PROJECT NAME: CALLAWAY GOLF DRYDEN LOTS 23-24 Date: 9-5-00 Project number: PRE 00-62 Prelimhaw comments: (Note: This commentary identifies missing information that must be included with the official project submittal. It may also identify fire protection issues associated with the project.) Lot 23 1. Two on-site hydrants will be required 2. State the intended use of the building 3. Roof venting and fire Sprinklers must be designed to protect high piled storage. Lot 24 1. Two on-site hydrants will be required 2. State the intended use of the building 3. Roof venting and fire Sprinklers must be designed to protect high piled storage.